Special Testing Sample Clauses

Special Testing. The Professional shall promptly require inspection or testing of any Work in addition to that required by the Owner or governmental entities having jurisdiction over the Project when such additional inspections and testing is necessary or advisable, whether or not such Work is then fabricated, installed or completed. The Professional shall take appropriate action on all such special testing and inspection reports, including acceptance, rejection, requiring additional testing or corrective work, or such other action the Professional deems appropriate. The Professional shall promptly reject Work that does not conform to and comply with testing requirements.
AutoNDA by SimpleDocs
Special Testing. IF OWNER DETERMINES THAT ANY WORK REQUIRES SPECIAL INSPECTION, TESTING, OR APPROVAL WHICH SUBSECTION 19.6 DOES NOT INCLUDE, IT WILL INSTRUCT CONTRACTOR TO ORDER SUCH SPECIAL INSPECTION, TESTING OR APPROVAL, AND CONTRACTOR SHALL GIVE NOTICE AS PROVIDED IN SUBPARAGRAPH 19.6. IF SUCH SPECIAL INSPECTION OR TESTING REVEALS A FAILURE OF THE WORK TO COMPLY WITH THE REQUIRE- MENTS OF THE CONTRACT DOCUMENTS , CONTRACTOR SHALL BEAR ALL COSTS THEREOF, INCLUDING COMPENSATION FOR OWNER'S ADDITIONAL SERVICES MADE NECESSARY BY SUCH FAILURE, OTHERWISE, OWNER SHALL BEAR SUCH COSTS, AND AN APPROPRIATE CHANGE ORDER SHALL BE ISSUED.
Special Testing. Any special testing, as deemed necessary by the pathologist, should result in tissue(s) collected and stored in an appropriately sized and labeled container and sent to the Department of Coroner for analysis, ensuring that the chain of custody is maintained at all times.
Special Testing. The Owner or the Architect/Engineer may require special inspection, testing or approval of material or Work in addition to that which may be specified for compliance with requirements of the Contract Documents. Upon direction by the Owner and the Architect/Engineer for additional special testing, the Contractor shall promptly arrange for such special testing, inspection or approval procedure. The costs of special testing shall be at Owner’s expense, except if the materials fail, Contractor shall pay the expense; provided, however, that the entire cost of any additional testing, whether routine or special, required because of failure of a prior test shall be borne by the Contractor.
Special Testing. During dry weather periods within the normal operating phase, two hydraulic conductivity, residence time, and vegetation monitoring events will be conducted. The special testing events will be conducted using artificial runoff made by WSC, and will be completed on the following approximate schedule: o Event #1: April 2020 o Event #2: November 2020
Special Testing. (a) Throughout the term of this Franchise, Grantor shall have the right to inspect all construction or installation work performed pursuant to the provisions of the Franchise. In addition, Grantor may require special testing of a location or locations within the Cable System if there is a particular matter of controversy or unresolved complaints regarding such construction or installation work or pertaining to such location(s). Demand for such special tests may be made on the basis of complaints received or other evidence indicating an unresolved controversy or noncompliance. Such tests shall be limited to the particular matter in controversy or unresolved complaints. Grantor shall endeavor to so arrange its request for such special testing so as to minimize hardship or inconvenience to Grantee or to the Subscribers caused by such testing.
Special Testing. City may require special testing of a location or locations within the System if there is a particular matter of controversy or unresolved complaints pertaining to such location(s). Demand for such special tests may be made on the basis of complaints received or other evidence indicating an unresolved controversy or noncompliance. Such tests shall be limited to the particular matter in controversy or unresolved complaints. City shall endeavor to so arrange its request for such special testing so as to minimize hardship or inconvenience to Grantee or to the Subscribers caused by such testing. Before ordering such tests, Grantee shall be afforded sixty (60) days to correct problems or complaints upon which tests were ordered. City shall meet with Grantee prior to requiring special tests to discuss the need for such and, if possible, visually inspect those locations which are the focus of concern. If, after such meetings and inspections, City wishes to commence special tests and the sixty (60) days have elapsed without correction of the matter in controversy or unresolved complaints, the tests shall be conducted by City. In the event that special testing is required by City to determine the source of technical difficulties, the cost of said testing shall be borne by the Grantee if the testing reveals the System does not meet FCC technical specifications. If the testing reveals the System does meet FCC technical standards, then the cost of said test shall be borne by the City.
AutoNDA by SimpleDocs
Special Testing. The Professional shall promptly require inspection or testing of any Work in addition to that required by the Owner or governmental entities having jurisdiction over the Project when such additional inspections and testing is necessary or advisable, whether or not such Work is then fabricated, installed or completed. The Professional shall take appropriate action on such special testing and inspection reports, including acceptance, rejection, requiring additional testing or corrective work, or such other appropriate action. The Professional shall promptly recommend to the Owner rejection of Work that does not conform to and comply with testing requirements. The Owner can accept or reject the Professional’s recommendation. The Professional shall notify Owner of any concerns with the quality of the testing.
Special Testing. The CONTRACTOR shall promptly require inspection or testing of any Work in addition to that required by the OWNER or governmental entities having jurisdiction over the Project when such additional inspections and testing is necessary or advisable, whether or not such Work is then fabricated, installed or completed. The CONTRACTOR shall take appropriate action on such special testing and inspection reports, including acceptance, rejection, requiring additional testing or corrective work, or such other appropriate action. The CONTRACTOR shall promptly recommend to the OWNER rejection of Work that does not conform to and comply with testing requirements. The OWNER can accept or reject the CONTRACTOR’s recommendation. The CONTRACTOR shall notify OWNER of any concerns with the quality of the testing.
Special Testing. In the event that special testing is required by the Franchisor to determine the source of technical difficulties, the cost of said testing shall be borne by the Franchisee if the testing reveals the cable company to be responsible. If the testing reveals the difficulties to be caused by factors which are beyond the cable company’s control, the cost of testing shall be borne by the Franchisor.