Adverse Weather Conditions Except in emergency conditions, the Employer shall not require an employee to work outside under extreme weather conditions.
Unbundled Loop Modifications (Line Conditioning 2.5.1 Line Conditioning is defined as routine network modification that BellSouth regularly undertakes to provide xDSL services to its own customers. This may include the removal of any device, from a copper Loop or copper Subloop that may diminish the capability of the Loop or Subloop to deliver high-speed switched wireline telecommunications capability, including xDSL service. Such devices include, load coils, excessive bridged taps, low pass filters, and range extenders. Excessive bridged taps are bridged taps that serves no network design purpose and that are beyond the limits set according to industry standards and/or the BellSouth’s TR 73600 Unbundled Local Loop Technical Specification. 2.5.2 BellSouth will remove load coils only on copper Loops and Subloops that are less than eighteen thousand (18,000) feet in length. 2.5.3 For any copper loop being ordered by NewPhone which has over six thousand (6,000) feet of combined bridged tap will be modified, upon request from NewPhone, so that the loop will have a maximum of six thousand (6,000) feet of bridged tap. This modification will be performed at no additional charge to NewPhone. Loop conditioning orders that require the removal of bridged tap that serves no network design purpose on a copper Loop that will result in a combined total of bridged tap between two thousand five hundred (2,500) and six thousand (6,000) feet will be performed at the rates set forth in Exhibit A. 2.5.4 NewPhone may request removal of any unnecessary and non-excessive bridged tap (bridged tap between zero (0) and two thousand five hundred (2,500) feet which serves no network design purpose), at rates pursuant to BellSouth’s SC Process as mutually agreed to by the Parties. 2.5.5 Rates for ULM are as set forth in Exhibit A. 2.5.6 BellSouth will not modify a Loop in such a way that it no longer meets the technical parameters of the original Loop type (e.g., voice grade, ADSL, etc.) being ordered. 2.5.7 If NewPhone requests ULM on a reserved facility for a new Loop order, BellSouth may perform a pair change and provision a different Loop facility in lieu of the reserved facility with ULM if feasible. The Loop provisioned will meet or exceed specifications of the requested Loop facility as modified. NewPhone will not be charged for ULM if a different Loop is provisioned. For Loops that require a DLR or its equivalent, BellSouth will provide LMU detail of the Loop provisioned. 2.5.8 NewPhone shall request Loop make up information pursuant to this Attachment prior to submitting a service inquiry and/or a LSR for the Loop type that NewPhone desires BellSouth to condition. 2.5.9 When requesting ULM for a Loop that BellSouth has previously provisioned for NewPhone, NewPhone will submit a SI to BellSouth. If a spare Loop facility that meets the Loop modification specifications requested by NewPhone is available at the location for which the ULM was requested, NewPhone will have the option to change the Loop facility to the qualifying spare facility rather than to provide ULM. In the event that BellSouth changes the Loop facility in lieu of providing ULM, NewPhone will not be charged for ULM but will only be charged the service order charges for submitting an order.
Exceptional Circumstances Sourcewell retains the right to consider additional extensions as required under exceptional circumstances.
INDIVIDUAL FLEXIBILITY AGREEMENTS 29.1 Where the Employer wants to enter into a variation agreement it must provide a written proposal to the Employee and the Union. Where the Employee’s understanding of written English is limited, the Employer must take measures, including translation into an appropriate language, to ensure the Employee understands the proposal. 29.2 The Employer must ensure that any variation agreement is genuinely agreed to by the Employer, the Union and the Employee and that the terms of the variation agreement: (a) are about permitted matters under section 172 of the FW Act; and (b) Relates only to: (i) Salary sacrifice agreements (ii) Increase in annual leave accrual each year (iii) Increase in rate of accrual of Rostered days off (iv) Increase in wages (v) Increase in training leave (Union or otherwise) (c) are not unlawful terms under section 194 of the FW Act; and (d) result in the Employee being better off overall than the Employee would be if no arrangement (variation agreement) was made. 29.3 The Employer must also ensure that any such variation agreement is: (a) Agreed to by the Union (b) in writing (including details of the terms that will be varied, how the variation agreement will vary the effect of the Enterprise Agreement terms, how the Employee will be better off overall in relation to the terms and conditions of his or her employment as a result of the arrangement, and the day on which the arrangement commences) (c) includes the name of the Employer and Employee (d) signed by the Employer and the Employee, and if the Employee is under 18, by a parent or guardian of the Employee (e) provided to the Employee within 14 days after it is agreed to: and
Reverse ADSL Loops If a CLEC’s ADSL Transmission Unit (including those integrated into DSLAMs) is attached to Sprint’s Network and if an ADSL Copper Loop should start at an outside location, and is looped through a host or remote, and then to the subscriber, the copper plant from the outside location to the Sprint host or remote central office must be a facility dedicated to ADSL transmission only and not part of Sprint’s regular feeder or distribution plant.