SOUND LOCATION Sample Clauses
SOUND LOCATION. Operator shall prepare a sound location adequate in size and capable of properly supporting the drilling rig, and shall be responsible for a casing and cementing program adequate to prevent soil and subsoil wash out. It is recognized that Operator has superior knowledge of the location and access routes to the location, and must advise Contractor of any subsurface conditions, or obstructions (including, but not limited to, mines, caverns, sink holes, streams, pipelines, power lines and communication lines) which Contractor might encounter while en route to the location or during operations hereunder. In the event subsurface conditions cause a cratering or shifting of the location surface, or if seabed conditions prove unsatisfactory to properly support the rig during marine operations hereunder, and loss or damage to the rig or its associated equipment results therefrom, Operator shall, without regard to other provisions of this Contract, including Subparagraph 14.1 hereof, reimburse Contractor for all such loss or damage including removal of debris and payment of Force Majeure Rate during repair and/or demobilization if applicable.
SOUND LOCATION. Operator shall prepare a sound location adequate in size and capable of properly supporting the drilling rig, and shall be responsible for a conductor pipe program adequate to prevent soil and subsoil wash out It is recognized that Operator has superior knowledge of the location and access routes to the location, and must advise Contractor of any subsurface conditions, or obstructions including, but not limited to, mines, caverns, sink holes, streams, pipelines, power lines and telephone lines which Contractor might encounter while en route to the location or during operations hereunder. In the event subsurface conditions cause a cratering or shifting of the location surface, or if seabed conditions prove unsatisfactory to properly support the rig during marine operations hereunder, and loss or damage to the rig or its associated equipment results therefrom, Operator shall, without regard to other provisions of this Contract, including Subparagraph 14.1 hereof, reimburse Contractor to the extent not covered by Contractor's insurance, for all such loss or damage including payment of force majeure rate during repair and/or demobilization if applicable.
SOUND LOCATION. Operator shall prepare a sound location adequate in size and capable of properly supporting the drilling rig, and shall be responsible for a casing and cementing program adequate to prevent soil and subsoil wash out. In the event subsurface conditions cause a cratering or shifting of the location surface, and loss or damage to the rig or its associated equipment results therefrom, Operator shall, without regard to other provisions of this Contract, including Subparagraph 14.1 hereof, reimburse Contractor for all such loss or damage including removal of debris and payment of Standby Time Rate during repair and/or demobilization if applicable.
SOUND LOCATION. Operator shall prepare and design a sound location adequate in size and capable of properly supporting the Drilling Rig and related equipment, according to load based diagrams of Contractor Equipment, and shall be responsible for a casing and cementing program adequate to prevent soil and subsoil wash out. It is recognized that Operator has superior knowledge of the location and access routes to and from the drilling location and must advise Contractor of any subsurface conditions or obstructions (including, but not limited to, mines, caverns, sink holes, streams, pipelines, power lines and communication lines) that might be encountered while en route to or from or at the drilling location. In the event subsurface conditions cause a cratering or shifting of the location surface and loss or damage to the Drilling Rig or its associated equipment results therefrom for any reason, Operator shall, without regard to any other provisions of this Contract, including Article 45.1, indemnify Contractor for all such loss or damage, including removal of debris and payment of the Standby Rate during repair or demobilization, if applicable.
