Site Testing. To demonstrate that the Battery meets the Owner’s requirements for the predetermined operation of the Solar Facility, the Contractor shall perform the following tests: test-area safety checks before proceeding with other steps involved in the site acceptance testing; initial visual and mechanical inspection of all Equipment to identify damaged components and materials, if any; and system functionality test to ensure that the system is fully functional and operates as expected. All on-Site testing shall be coordinated with the Owner to determine the permissible level of power dispatch at the Site and the setpoints shall be determined accordingly. All data from the testing procedures shall be logged and delivered to the Owner. At the conclusion of the testing, the system shall be rebooted and the Contractor shall verify that all devices have loaded up successfully. All site acceptance test reports and data shall be produced and delivered to the Owner, which shall include any corrective actions recorded during the site acceptance testing.
Appears in 2 contracts
Sources: Epc Contract, Epc Contract