Signalling Point Code Allocations Sample Clauses

Signalling Point Code Allocations. The Parties shall liaise with each other regarding the allocation of Signalling Point Codes (SPCs) necessary for the Interconnection of their respective Systems if it is applicable to the Interconnection method.
AutoNDA by SimpleDocs

Related to Signalling Point Code Allocations

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall operate within a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA in order to maintain a specified voltage schedule, if the Interconnection System Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standard can be met by using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two, if agreed to by the Participating TO and CAISO. The Interconnection Customer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the Interconnection System Impact Study shows this to be required for system safety or reliability.

  • Switching System Hierarchy and Trunking Requirements For purposes of routing iNetworks traffic to Verizon, the subtending arrangements between Verizon Tandems and Verizon End Offices shall be the same as the Tandem/End Office subtending arrangements Verizon maintains for the routing of its own or other carriers’ traffic (i.e., traffic will be routed to the appropriate Verizon Tandem subtended by the terminating End Office serving the Verizon Customer). For purposes of routing Verizon traffic to iNetworks, the subtending arrangements between iNetworks Tandems and iNetworks End Offices shall be the same as the Tandem/End Office subtending arrangements that iNetworks maintains for the routing of its own or other carriers’ traffic.

  • Switching and Tagging Rules Each Party shall provide the other Parties a copy of its switching and tagging rules that are applicable to the other Parties’ activities. Such switching and tagging rules shall be developed on a non-discriminatory basis. The Parties shall comply with applicable switching and tagging rules, as amended from time to time, in obtaining clearances for work or for switching operations on equipment.

  • Programming Phase 2.2.1.2. Schematic Design Phase: 2.2.1.3. Design Development Phase:

  • Distribution Protocol (1) At a time wholly within the discretion of Class Counsel, but on notice to the Settling Defendants, Class Counsel will bring motions seeking orders from the Courts approving the Distribution Protocol. The motions can be brought before the Effective Date, but the orders approving the Distribution Protocol shall be conditional on the Effective Date occurring.

  • Contract Distribution The Employer will provide all current and new employees with a link to the new Agreement. Each department or unit will maintain a paper copy of the contract accessible to all employees.

  • Distribution of UDP and TCP queries DNS probes will send UDP or TCP “DNS test” approximating the distribution of these queries.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

Time is Money Join Law Insider Premium to draft better contracts faster.