Shallow Subsurface Injection General Clause Samples

Shallow Subsurface Injection General. ‌ 2.1. Furnish and inject polyurethane grout to fill voids, seal drainage structures, seal nonstructural wall openings, lift roadway panels, lift approach slabs, and correct pavement alignment issues at the locations shown in a work order or as directed by the County. Furnish all labor, equipment and materials required to inject expansive one or two-part polyurethane. 2.2. With each work order, review the available subsurface information and visit the site to assess the severity of issue to be corrected, the site geometry, equipment access conditions, and location of existing structures and above ground facilities. Any damage resulting from the injection operation is the sole responsibility of the contractor. Field locate and verify the location of all utilities in the vicinity of the project site prior to starting the work. Maintain uninterrupted service for all existing utilities throughout the work.

Related to Shallow Subsurface Injection General

  • Groundwater Any water, except capillary moisture, beneath the land surface or beneath the bed of any stream, lake, reservoir or other body of surface water within the boundaries of this state, whatever may be the geologic formation or structure in which such water stands, flows, percolates, or otherwise moves.

  • Underground Storage Tanks In accordance with the requirements of Section 3(g) of the D.C. Underground Storage Tank Management Act of 1990, as amended by the District of Columbia Underground Storage Tank Management Act of 1990 Amendment Act of 1992 (D.C. Code § 8-113.01, et seq.) (collectively, the “UST Act”) and the applicable D.C. Underground Storage Tank Regulations, 20 DCMR Chapter 56 (the “UST Regulations”), District hereby informs the Developer that it has no knowledge of the existence or removal during its ownership of the Property of any “underground storage tanks” (as defined in the UST Act). Information pertaining to underground storage tanks and underground storage tank removals of which the D.C. Government has received notification is on file with the District Department of the Environment, Underground Storage Tank Branch, ▇▇ ▇ ▇▇▇▇▇▇, ▇.▇., ▇▇▇▇▇ ▇▇▇▇▇, ▇▇▇▇▇▇▇▇▇▇, ▇.▇., ▇▇▇▇▇, telephone (▇▇▇) ▇▇▇-▇▇▇▇. District’s knowledge for purposes of this Section shall mean and be limited to the actual knowledge of ▇▇▇▇▇▇ ▇▇▇▇▇, Property Acquisition and Disposition Division of the Department of Housing and Community Development, telephone no. (▇▇▇) ▇▇▇-▇▇▇▇. The foregoing is set forth pursuant to requirements contained in the UST Act and UST Regulations and does not constitute a representation or warranty by District.

  • Operating Environment Per specifications given in Ref. [1]

  • Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

  • Hazardous Materials; Remediation (a) If any material release or disposal of Hazardous Materials shall occur or shall have occurred on any real property or any other assets of any Borrower or any other Credit Party, such Credit Party will cause the prompt containment and removal of such Hazardous Materials and the remediation of such real property or other assets as is necessary to comply with all applicable Environmental Laws and Healthcare Laws and to preserve the value of such real property or other assets. Without limiting the generality of the foregoing, each Credit Party shall comply in all material respects with each Environmental Law and Healthcare Law requiring the performance at any real property by any Borrower or any other Credit Party of activities in response to the release or threatened release of a Hazardous Material. (b) Credit Parties will provide Agent within thirty (30) days after written demand therefor with a bond, letter of credit or similar financial assurance evidencing to the reasonable satisfaction of Agent that sufficient funds are available to pay the cost of removing, treating and disposing of any Hazardous Materials or Hazardous Materials Contamination and discharging any assessment which may be established on any property as a result thereof, such demand to be made, if at all, upon Agent’s reasonable business determination that the failure to remove, treat or dispose of any Hazardous Materials or Hazardous Materials Contamination, or the failure to discharge any such assessment could reasonably be expected to have a Material Adverse Effect.