Schematic Plan Sample Clauses

Schematic Plan. 4.1 Prepare one (1) schematic plan with colored informational graphics illustrating site improvements.
AutoNDA by SimpleDocs
Schematic Plan. 4.1 Prepare one (1) schematic plan with colored informational graphics illustrating site improvements based on proposed expansion of high school campus.
Schematic Plan. 2.1 Scope Aug 22 1.2 Society Society 2.2 Development Fall 22 > Spring 23 1.6 Society TBD (design firm) Society 2.3 Outreach Fall 22 > Spring 23 2.2 City & Society TBD (design firm) City & Society
Schematic Plan. Sublandlord and Subtenant have each approved the schematic space plans for the Premises dated April 2, 1999 (the "Schematic Plan") prepared by Xxx Xxxxxxx of CAS Architects ("Sublandlord's Space Planner").

Related to Schematic Plan

  • Schematic Design See Section 2, Part 1, Article 2.1.4, Paragraph 2.1.4.2.

  • Schematic Design Documents In accordance with the approved Preliminary Design and Construction Schedule and based upon approval of and comments made by the Owner regarding the Concept Design Studies, the Design Professional shall prepare and submit to the Owner Schematic Design Documents, including drawings and outline specifications. These documents shall represent a further development of the approved design concept, providing additional detail and specificity regarding the intended design solution. Typically, all such documents shall be drawn to scale, indicating materials and assemblies, as appropriate, to convey the design intent and to illustrate the Project’s basic elements, scale and relationship to the Site. All major pieces of furniture and equipment to be fixed or supplied by the CM/GC shall be illustrated to scale. (See ASTM Standard Practice E 1804-02, August 2007, Sections 6.3, 8.2 and 8.3 for guidance on information which is generally developed in Schematic Design.)

  • Schematic Design Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE

  • Flexible Work Schedule A flexible work schedule is any schedule that is not a regular, alternate, 9/80, or 4/10 work schedule and where the employee is not scheduled to work more than 40 hours in the "workweek" as defined in Subsections F. and H., below.

  • Improvement Plans A. A professional improvement plan is a clearly articulated assistance program for a teacher whose student growth measure dimension of the evaluation is below the expected level of student growth. For the purposes of this agreement, improvement plans shall be based on the individual student growth measure level, and not for overall subjects or classes taught.

  • Modified Work/Return to Work Programs The Hospital and the Union recognize the purpose of modified work/return to work programs, is to provide fair and consistent practices for accommodating nurses who have been ill, injured or permanently disabled, to enable their early and safe return to work. The parties undertake to provide safe and meaningful employment for both permanently or temporarily disabled nurses based on the following principles:

  • Performance Improvement Plan timely and accurate completion of key actions due within the reporting period 100 percent The Supplier will design and develop an improvement plan and agree milestones and deliverables with the Authority

  • Project Implementation Manual The Recipient, through the PCU, shall: (i) take all action required to carry out Parts 1.1, 1.3, 1.4, 2, 3.1(b), 3.2, 3.3 and 4 (ii) of the Project in accordance with the provisions and requirements set forth or referred to in the Project Implementation Manual; (ii) submit recommendations to the Association for its consideration for changes and updates of the Project Implementation Manual as they may become necessary or advisable during Project implementation in order to achieve the objective of Parts 1.1, 1.3, 1.4, 2, 3.1(b), 3.2, 3.3 and 4(ii) of the Project; and (iii) not assign, amend, abrogate or waive the Project Implementation Manual or any of its provisions without the Association’s prior agreement. Notwithstanding the foregoing, if any of the provisions of the Project Implementation Manual is inconsistent with the provisions of this Agreement, the provisions of this Agreement shall prevail and govern.

  • Prescription Drug Plan Effective January 1, 2022, retail and mail order prescription drug copays for bargaining unit employees shall be as follows: Type of Drug Prescriptions for 1-45 Days (1 copay) Prescriptions for 46-90 Days (2 copays) Generic drug $10 $20 Preferred brand name drug $25 $50 Non- referred brand name drug $40 $80 Effective January 1, 2022, for each plan year the Prescription Drug annual out-of-pocket copay maximum shall be $1,000 for individual coverage and $1,500 for employee and spouse, employee and child, or employee and family coverage.

  • Design Criteria The Engineer shall develop the roadway design criteria based on the controlling factors specified by the State (i.e. 4R, 3R, 2R, or special facilities), by use of the funding categories, design speed, functional classification, roadway class and any other set criteria as set forth in PS&E Preparation Manual, Roadway Design Manual, Bridge Design Manual, Hydraulic Design Manual, and other deemed necessary State approved manuals. In addition, the Engineer shall prepare the Design Summary Report (DSR) and submit it electronically. The Engineer shall obtain written concurrence from the State prior to proceeding with a design if any questions arise during the design process regarding the applicability of State’s design criteria.

Time is Money Join Law Insider Premium to draft better contracts faster.