Reference Points. Owner, through the Architect, shall provide in the Contract documents the engineering surveys necessary to establish pre-construction reference points for construction which in Architect's judgment are necessary to enable Contractor to proceed with the Work. Contractor shall be responsible for laying out the Work, shall protect and preserve the established reference points and property monuments, and shall make no changes or relocations without the prior written approval of Owner. Contractor shall report to Architect whenever any reference point or property monument is lost or destroyed or requires relocation because of necessary changes in grades or locations, and shall be responsible for the accurate replacement or relocation of such reference points or property monuments by professionally qualified personnel.
Reference Points. 4.3.1 Unless otherwise provided in the Contract Documents, Contractor shall lay out its Work from base lines and benchmarks established by the County and shall be responsible for all measurements in connection therewith.
Reference Points. The Contractor shall locate and reference the project survey control network and establish bench marks at appropriate intervals along the line of the project for use by the Contractor in establishing horizontal and vertical controls necessary for the construction. If the Contractor or subcontractor destroys these locations, the Contractor shall re-establish these points. The Contractor's stakeout work shall be included in the contract unit price for the various items of work to which it is incidental.
Reference Points. GC-13 4.06 Hazardous Environmental Condition at Site ................................................................................................... GC-13 ARTICLE 5 - BONDS AND INSURANCE .................................................................................................................................. GC-14 5.01 Performance, Payment, and Other Bonds........................................................................................................ GC-14 5.02 Licensed Sureties and Insurers ......................................................................................................................... GC-15 5.03 Certificates of Insurance................................................................................................................................... GC-15 5.04 CONTRACTOR’s Liability Insurance .............................................................................................................. GC-15 5.05 OWNER’s Liability Insurance .......................................................................................................................... GC-16 5.06 Property Insurance ........................................................................................................................................... GC-16 5.07 Waiver of Rights................................................................................................................................................ GC-17 5.08 Receipt and Application of Insurance Proceeds .............................................................................................. GC-17 5.09 Acceptance of Bonds and Insurance; Option to Replace ................................................................................ GC-18 5.10 Partial Utilization, Acknowledgment of Property Insurer ............................................................................... GC-18 ARTICLE 6 - CONTRACTOR’S RESPONSIBILITIES .............................................................................................................. GC-18 6.01 Supervision and Superintendence .................................................................................................................... GC-18 6.02 Labor; Working Hours ..................................................................................................................................... GC-18 6.03 Services, Materials, and Equipment ..............................................................
Reference Points. GENERAL CONDITION, PART F, ARTICLE 7, REFERENCE POINTS, “Reference Points” is appended as follows:
Reference Points. Contractor shall confirm engineering surveys establishing reference points for construction, which in Contractor’s judgment are necessary to enable Contractor to perform the Work. Contractor shall be responsible for laying out the Work and shall protect and preserve such established reference points. Any changes to the established reference points shall require Contractor to update all Submittals (including those previously submitted) reflecting the new reference points. Such updating shall be undertaken promptly, consistent with Professional Standards, and without delaying Work that will be based on such updating. Contractor shall provide Notice to Owner whenever any reference point is lost or destroyed or requires relocation and shall be responsible for the accurate replacement or relocation of such reference points by professionally qualified Personnel.
Reference Points. CITY shall provide engineering surveys to establish reference points for construction which in CITY'S judgment are necessary to enable CONTRACTOR to proceed with the Work. CONTRACTOR shall be responsible for laying out the Work, shall protect and preserve the established reference points and shall make no changes or relocations without the prior written approval of CITY. CONTRACTOR shall report to CITY REP whenever any reference point is lost or destroyed or requires relocation because of necessary changes in grades or locations, and shall be responsible for replacement or relocation of such reference points by a licensed surveyor.
Reference Points. Employees who remained on Schedule on January did so in accordance with Section of the Society Collective Agreement. This schedule covers a 35-hour workweek. Compensation Benefits Effective: January XXXXX POWER SALARY SCHEDULE STANDARD SCHEDULE FOR MANAGEMENT AND PROFESSIONAL STAFF DOLLARS PER WEEK SALARY GRADE Notes: This schedule covers a 35-hour workweek. Employees will be placed on Steps and on this Schedule in accordance with Sections and of the Society Collective Agreement. Compensation Benefits Effective: January Revised Xxxxx XXXXX POWER SALARY SCHEDULE STANDARD SCHEDULE FOR MANAGEMENT AND PROFESSIONAL STAFF DOLLARS PER WEEK Revision SALARY GRADE Notes: This schedule covers a 40-hour workweek. Any employee hired into any position identified in Article will start at a minimum of Step of the pay scale. Compensation Benefits Effective: January Revised Xxxx XXXXX POWER SCHEDULE STANDARDSCHEDULEFOR MANAGEMENT AND STAFF GRANDFATHERED ON IMPLEMENTATION OF CAREER PAY PLAN SCHEDULES DOLLARS PER WEEK SALARY GRADE PERCENTAGE OF REF Max
Reference Points. The ClTY will provide reference points for the work as described in the General Conditions. Base horizontal and vertical control points will be designated by the ENGINEER and used as datum for the Work. Perform all additional survey, layout, and measurement work.
Reference Points. .1 The Departmental Representative will provide control points and initial layout of survey stakes.