Re-Chlorination Sample Clauses
Re-Chlorination. The Contractor shall be required to re-chlorinate the water main if the Safe Water Sampling fails to obtain the two (2) consecutive passing samples. The Contractor may choose Continuous Feed or the Slug Method for re-chlorination. The flushing and sampling procedures are to be repeated.
