QF Telephone requirements Clause Samples

QF Telephone requirements. The QF Developer is required to install a telephone for direct communication with SPPCo.'s Electric System Control Center (ESCC). The telephone communication between the QF and ESCC shall be delay free.
QF Telephone requirements. The QF Developer is required to install a telephone for direct communication with SPPCo.'s Electric System Control Center (ESCC). The telephone communication between the QF and ESCC shall be delay free. -------------------------------------------------------------------------------- ENGINEERING & CONSTRUCTION STANDARD VOL SECT PAGE [LOGO] SMALL POWER PRODUCTION 1 2.2 SHEET 12 OF 12 AND COGENERATION FOR GENERATION DRAWING NO. GREATER THAN ONE MEGAWATT SIERRA PACIFIC POWER CO. 2.2GNO2 -------------------------------------------------------------------------------- [LOGO] DATA REQUEST FOR GENERATOR INTERCONNECTION FOR VALUES GIVEN IN PER UNIT, PLEASE INCLUDE BASES. IF THERE ARE ANY PROBLEMS OR IF THERE IS ANY CONFUSION WITH THE FOLLOWING FORM(S), PLEASE CONTACT SPPCo.'s TRANSMISSION PLANNING DEPARTMENT. 1. A RANGE AND TOWNSHIP SITE MAP OF THE PLANNED FACILITIES WITH THE TURBINE/GENERATOR STEP-UP TRANSFORMER AND SUBSTATION IDENTIFIED. (PLEASE ATTACH) 2. A ONE-LINE DIAGRAM OF THE PLANNED GENERATION FACILITIES. (PLEASE ATTACH) THE ONE-LINE DIAGRAM SHOULD INCLUDE: A. TRANSMISSION/DISTRIBUTION LINES(S) B. GENERATORS C. TRANSFORMERS D. MOTORS E. BREAKERS F. FUSES G. LIGHTNING ARRESTORS H. DISCONNECT SWITCHES I. POWER FACTOR CORRECTION EQUIPMENT (IE CAPACITORS/REACTORS) J. STATION SERVICE LOADS K. OTHER SPECIAL DEVICES 3. A CONSTRUCTION SCHEDULE WITH CONSTRUCTION POWER, START-UP POWER, AND FULL LOAD TESTING DATES IDENTIFIED (IF A MORE DETAILED SCHEDULE IS AVAILABLE, PLEASE ATTACH) DESCRIPTION DATE ----------- ---- START CONSTRUCTION ____/____/____ CONSTRUCTION COMPLETE ____/____/____ START-UP, BEGIN FULL-LOAD TESTING ____/____/____ FULL-LOAD TESTING COMPLETE ____/____/____ 4. AN ESTIMATED ON-LINE DATE AND THE TOTAL FUTURE CAPACITY FOR ANY ADDITIONAL GENERATION ADDED AT THE INITIAL SITE. SIZE ON-LINE DATE ---- ------------ MW ____/____/____ MW ____/____/____ MW ____/____/____