Provisioning Program Sample Clauses

Provisioning Program. The Contractor shall develop provisioning data for the TWPS in accordance with MIL-PRF-49506 and guidelines of MIL-HDBK-502 and LMI data worksheet IAW Attachment 13 (See Section J, Attachment 13, LMI Requirements, MIL-PRF 45506: EDFP, DCN and PPL). The provisioning data shall contain all data for the assemblies, sub-assemblies, spare parts and module to include Components of the End Item (COEI), Basic Issue Items (BII), Additional Authorized (Items) List (AAL) and Special Tools and Test Equipment (STTE) required to support the TWPS. Engineering Data for Provisioning (EDFP) drawings are required to support each new item being provisioned. The Government will provide the Provisioning Contract Control Number (PCCN), Provisioning Control Code (PCC), and additional information or service unique codes will be provided not later than the Provisioning Guidance Conference.
AutoNDA by SimpleDocs
Provisioning Program. The contractor shall develop the Provisioning Master Record (PMR) IAW the current version of SAE XX- XX-0007-1 Product Supportability Analysis, SAE GEIA-STD-0007 Logistics Product Data, AMC XXX 700-25 Logistics Guide to Provisioning and Attachment 0004, Attribute Selection Worksheet. The contractor shall provision all new end items in a top-down breakdown structure including all parts found in the RPSTL. The contractor shall ensure the PMR contains data for the assemblies, sub-assemblies, spare parts, kits, COEI, BII, AAL, EDIL, Bulk Items List, and STTE.

Related to Provisioning Program

  • Maintenance Program LESSEE's Maintenance Program

  • TECHNICAL SUPPORT SERVICES 2.1 The technical support services (the "Services"): Party A agrees to provide to Party B the relevant services requested by Party B, which are specified in Exhibit 1 attached hereto ("Exhibit 1").

  • Scope of Work The Contractor has overall responsibility for and shall provide and furnish all materials, equipment, tools and labor as necessary or reasonably inferable to complete the Work, or any phase of the Work, in accordance with the Owner’s requirements and the terms of the Contract Documents.

  • Development Program A. Development activities to be undertaken (Please break activities into subunits with the date of completion of major milestones)

  • Development Plan document specifying the work program, schedule, and relevant investments required for the Development and the Production of a Discovery or set of Discoveries of Oil and Gas in the Contract Area, including its abandonment.

  • Project Plan Development of Project Plan Upon the Authorized User’s request, the Contractor must develop a Project Plan. This Project Plan may include Implementation personnel, installation timeframes, escalation procedures and an acceptance plan as appropriate for the Services requested. Specific requirements of the plan will be defined in the RFQ. In response to the RFQ, the Contractor must agree to furnish all labor and supervision necessary to successfully perform Services procured from this Lot. Project Plan Document The Contractor will provide to the Authorized User, a Project Plan that may contain the following items: • Name of the Project Manager, Contact Phone Numbers and E-Mail Address; • Names of the Project Team Members, Contact Phone Numbers and E-Mail Address; • A list of Implementation milestones based on the Authorized User’s desired installation date; • A list of responsibilities of the Authorized User during system Implementation; • A list of designated Contractor Authorized Personnel; • Escalation procedures including management personnel contact numbers; • Full and complete documentation of all Implementation work; • Samples of knowledge transfer documentation; and • When applicable, a list of all materials and supplies required to complete the Implementation described in the RFQ. Materials and Supplies Required to Complete Implementation In the event that there are items required to complete an Implementation, the Contractor may request the items be added to its Contract if the items meet the scope of the Contract. Negotiation of Final Project Plan If the Authorized User chooses to require a full Project Plan, the State further reserves the right for Authorized Users to negotiate the final Project Plan with the apparent RFQ awardee. Such negotiation must not substantively change the scope of the RFQ plan, but can alter timeframes or other incidental factors of the final Project Plan. The Authorized User will provide the Contractor a minimum of five (5) business days’ notice of the final negotiation date. The Authorized User reserves the right to move to the next responsible and responsive bidder if Contractor negotiations are unsuccessful.

  • Statement of Work The Contractor shall provide the services and staff, and otherwise do all things necessary for or incidental to the performance of work, as set forth below:

  • Program Management 1.1.01 Implement and operate an Immunization Program as a Responsible Entity

  • Review Systems The Asset Representations Reviewer will maintain and utilize an electronic case management system to manage the Tests and provide systematic control over each step in the Review process and ensure consistency and repeatability among the Tests.

  • Spares Boeing will revise, as applicable, the customized Recommended Spares Parts List (RSPL) and Illustrated Parts Catalog (IPC).

Time is Money Join Law Insider Premium to draft better contracts faster.