Project Scope Modifications. 5.1.1 As at the Effective Date, the Base Project Scope aims to capture a conceptual design articulated in the Conceptual Design Report. The Municipality acknowledges that, consistent with the inherent adaptability of the APM process and the long-term nature of the Project, and the iterative process of engineering design, the design set out in the Conceptual Design Report will continue to be updated to support future licensing submissions and as new information becomes available from on-going site investigation. As such, the Municipality acknowledges that Section 5.1.2 lists the types of Project Scope Modifications most relevant to the Municipality and requiring a process as set out in this Article 5.
5.1.2 NWMO may modify the Base Project Scope to allow for any one or more of the following (each, a “Project Scope Modification”):
(a) emplacement in the DGR of CANDU Fuel Bundles sourced from CANDU Reactors in Canada that are not in existence as of the Effective Date;
(b) emplacement in the DGR of used nuclear fuel other than an Accepted Waste Source provided that any such fuel complies with the requirements of Sections 2.4.2(a) and (b) to exclude any liquid nuclear fuel waste and any nuclear waste originating from outside of Canada; or
(c) a fundamental revision to aspects of the conceptual design, as reflected in a subsequent version of the Conceptual Design Report.
Project Scope Modifications. 6.1.1 The Municipality acknowledges and agrees that NWMO shall have the right, from time to time, to:
(a) emplace additional used nuclear fuel in the DGR from Accepted Fuel Sources; and
(b) emplace used nuclear fuel in the DGR from sources other than Accepted Fuel Sources (including used nuclear fuel from small modular reactors that have filed a licence application with the CNSC following the Effective Date), (the “Project Scope Modifications” and each, a “Project Scope Modification”).
6.1.2 For clarity, NWMO acknowledges and agrees that additional used nuclear fuel emplaced in the DGR as a result of a Project Scope Modification shall comply with Section 2.2.3.