Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators agreed with the Association. Each Project Report shall cover the first or last six (6) months of the calendar year, and shall be furnished to the Association not later than one month after the end of the period covered by such report. 2. For purposes of Section 4.08 (c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than January 31, 2016.
Appears in 2 contracts
Sources: Financing Agreement, Financing Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators agreed with the Association. Each Project Report shall cover the first or last six (6) months period of the one calendar yearsemester, and shall be furnished to the Association not later than one month two (2) months after the end of the period covered by such report.
2. For purposes of Section 4.08 (c4.08(c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than January 31September 30, 20162014.
Appears in 2 contracts
Sources: Financing Agreement, Financing Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators agreed with the Association. Each Project Report shall cover the first or last period of six (6) months of the calendar yearmonths, and shall be furnished to the Association not later than one month sixty (60) days after the end of the period covered by such report.
2. For purposes of Section 4.08 (c4.08(c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than January March 31, 20162015.
Appears in 2 contracts
Sources: Financing Agreement, Financing Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators agreed with the Association. Each Project Report shall cover the first or last six period of one (61) months of the calendar yearquarter, and shall be furnished to the Association not later than one month forty-five (45) days after the end of the period covered by such report.
2. For purposes of Section 4.08 (c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than January 31, 20162011.
Appears in 2 contracts
Sources: Financing Agreement, Financing Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of performance indicators agreed with set forth in the AssociationOperational Manual. Each Project Report shall cover the first or last six (6) months period of the one calendar yearsemester, and shall be furnished to the Association Bank not later than one month sixty days after the end of the period covered by such report.
2. For purposes of Section 4.08 (c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than January December 31, 20162011.
Appears in 2 contracts
Sources: Financing Agreement, Financing Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators agreed with set forth in sub-Schedule 5 of the AssociationOriginal Financing Agreement. Each Project Report shall cover the first or last six (6) months period of the one calendar yearquarter, and shall be furnished to the Association not later than one month 45 days after the end of the period covered by such report.
2. For purposes of Section 4.08 (c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than January December 31, 20162012.
Appears in 2 contracts
Sources: Financing Agreement, Financing Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators agreed with the Association. Each Project Report shall cover the first or last period of six (6) months of the calendar yearmonths, and shall be furnished to the Association not later than one month forty five (45) days after the end of the period covered by such report.
2. For purposes of Section 4.08 (c4.08(c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than January 31June 30, 20162012.
Appears in 2 contracts
Sources: Financing Agreement, Financing Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators agreed with the Association. Each Project Report shall cover the first or last six (6) months period of the one calendar yearsemester, and shall be furnished to the Association not later than one month forty five days after the end of the period covered by such report.
2. For purposes of Section 4.08 (c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than January 31July 15, 20162013.
Appears in 2 contracts
Sources: Financing Agreement, Financing Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of performance indicators agreed with set forth in the AssociationOperational Manual. Each Project Report shall cover the first or last six (6) months period of the one calendar yearsemester, and shall be furnished to the Association Bank not later than one month sixty days after the end of the period covered by such report.
2. For purposes of Section 4.08 (c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than January 31September 30, 20162010.
Appears in 2 contracts
Sources: Financing Agreement, Financing Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators agreed with the Association. Each Project Report on the progress of the monitoring and evaluation indicators shall cover the first or last six (6) months period of one year of the calendar yearProject implementation, and shall be furnished to the Association not later than one month four months after the end of the period covered by such report.
2. For purposes of Section 4.08 (c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than January December 31, 20162011.
Appears in 1 contract
Sources: Financing Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 5.08 of the General Conditions and on the basis of the indicators agreed with the Associationset forth in Annex 1 to this Schedule. Each Project Report shall cover the first or last six (6) months period of the one calendar yearsemester, and shall be furnished to the Association Administrator not later than one month after the end of the period covered by such report.
2. For purposes of Section 4.08 (c5.08(c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association Administrator not later than January 31September 30, 20162012.
Appears in 1 contract
Sources: Grant Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators agreed with the Association. Each Project Report shall cover the first or last six (6) months period of the one calendar yearsemester, and shall be furnished to the Association not later than one month after the end of the period covered by such report.
2. For purposes of Section 4.08 (c4.08(c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than January July 31, 20162015.
Appears in 1 contract
Sources: Financing Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators agreed with the Association. Each Project Report shall cover the first or last six (6) months period of the one calendar yearquarter, and shall be furnished to the Association not later than one month after the end of the period covered by such report.
2. For purposes of Section 4.08 (c4.08(c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than January 31Jun e 30, 20162010.
Appears in 1 contract
Sources: Financing Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators agreed with the Association. Each Project Report shall cover the first or last six period of one (61) months of the calendar yearsemester, and shall be furnished to the Association not later than one (1) month after the end of the period covered by such report.
2. For purposes of Section 4.08 (c4.08(c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than January 31June 30, 20162014.
Appears in 1 contract
Sources: Financing Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators agreed with the Association. Each Project Report shall cover the first or last six (6) months period of the one calendar yearsemester, and shall be furnished to the Association not later than one month after the end of the period covered by such report.
2. For purposes of Section 4.08 (c4.08(c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than January March 31, 20162013.
Appears in 1 contract
Sources: Financing Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators agreed with the AssociationAssociation and set forth in the Operational Manual. Each Project Report shall cover the first or last six (6) months period of the one calendar yearsemester, and shall be furnished to the Association not later than one month forty five days after the end of the period covered by such report.
2. For purposes of Section 4.08 (c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than January July 31, 20162011.
Appears in 1 contract
Sources: Financing Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators agreed with the AssociationAssociation and set forth in the OM. Each Project Report shall cover the first or last six (6) months period of the one calendar yearquarter, and shall be furnished to the Association by DG not later than one month 45 days after the end of the period covered by such report.
2. For purposes of Section 4.08 (c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than January 3115, 20162014.
Appears in 1 contract
Sources: Financing Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators agreed with the Association. Each Project Report shall cover the first or last period of six (6) months of the calendar yearmonths, and shall be furnished to the Association not later than one month forty five days after the end of the period covered by such report.
2. For purposes of Section 4.08 (c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than January 31November 30, 20162007.
Appears in 1 contract
Sources: Financing Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators agreed with the Association. Each Project Report shall cover the first or last six period of one (61) months of the calendar yearquarter, and shall be furnished to the Association not later than one month after the end of the period covered by such report.
2. For purposes of Section 4.08 (c4.08(c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than January 31September 30, 20162011.
Appears in 1 contract
Sources: Financing Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators agreed with the Association. Each Project Report shall cover the first or last six (6) months period of the one calendar yearsemester, and shall be furnished to the Association not later than one month after the end of the period covered by such report.
2. For purposes of Section 4.08 (c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than January 31June 30, 20162013.
Appears in 1 contract
Sources: Financing Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators agreed with the Association. Each Project Report shall cover the first or last six period of one (61) months of the calendar yearsemester, and shall be furnished to the Association not later than one month forty five (45) days after the end of the period covered by such report.
2. For purposes of Section 4.08 (c4.08(c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than January March 31, 20162014.
Appears in 1 contract
Sources: Financing Agreement
Project Reports. 1. The Recipient Recipient, through the MOI, shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators agreed with the AssociationMonitoring and Evaluation indicators. Each Project Report shall cover the first or last six period of one (61) months of the calendar yearsemester, and shall be furnished to the Association not later than one (1) month after the end of the period covered by such report.
2. For purposes of Section 4.08 (c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than January 31August 30, 20162012.
Appears in 1 contract
Sources: Financing Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators agreed with the AssociationProgram Performance Indicators. Each Project Report shall cover the first or last period of six (6) months of the calendar yearmonths, and shall be furnished to the Association not later than one month forty-five days (45) after the end of the period covered by such report.
2. For purposes of Section 4.08 (c4.08(c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than January December 31, 20162014.
Appears in 1 contract
Sources: Financing Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators agreed with the Association. Each Project Report shall cover the first or last six (6) months period of the one calendar yearquarter, and shall be furnished to the Association not later than one month after the end of the period covered by such report.
2. For purposes of Section 4.08 (c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than January March 31, 20162014.
Appears in 1 contract
Sources: Financing Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of Part 1 of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators agreed with the Association. Each Project Report shall cover the first or last six (6) months period of the calendar yeara fiscal year trimester, and shall be furnished to the Association not later than one month forty-five (45) days after the end of the period covered by such report.
2. For purposes of Section 4.08 (c4.08(c) of the General Conditions, the report on the execution of Part 1 of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than January 31June 30, 20162013.
Appears in 1 contract
Sources: Financing Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators agreed with the Association. Each Project Report shall cover the first or last six period of one (61) months of the calendar yearquarter, and shall be furnished to the Association not later than one month forty-five (45) days after the end of the period covered by such report.
2. For purposes of Section 4.08 (c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than January December 31, 20162007.
Appears in 1 contract
Sources: Financing Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators agreed with the Association. Each Project Report shall cover the period of one (1) calendar semester, commencing with the first or last six (6) months semester of the calendar year2008, and shall be furnished to the Association not later than one month forty-five (45) days after the end of the period covered by such report.
2. For purposes of Section 4.08 (c4.08(c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than January December 31, 20162013.
Appears in 1 contract
Sources: Financing Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators agreed with the Association. Each Project Report shall cover the first or last six period of one (61) months of the calendar yearsemester, and shall be furnished to the Association not later than one month forty-five (45) days after the end of the period covered by such report.
2. For purposes of Section 4.08 (c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than January October 31, 20162011.
3. By March 31 of each year, the Recipient shall publish the progress report of the Project in a manner satisfactory to the Association.
Appears in 1 contract
Sources: Financing Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators agreed with the Associationset forth below in sub-paragraph (b) of this paragraph. Each Project Report shall cover the first or last six (6) period of three months of the calendar year, and shall be furnished to the Association not later than one month 45 days after the end of the period covered by such report.
2. For purposes of Section 4.08 (c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than January 31August 30, 20162014.
Appears in 1 contract
Sources: Financing Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators agreed with the Association. Each Project Report shall cover the first or last period of six (6) months of the calendar yearmonths, and shall be furnished to the Association not later than one month forty five (45) days after the end of the period covered by such report.
2. For purposes of Section 4.08 (c4.08(c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than January 31June 30, 20162015.
Appears in 1 contract
Sources: Financing Agreement
Project Reports. 1. The Recipient shall cause the Project Implementing Agency to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators agreed with acceptable to the Association. Each Project Report shall cover the first or last six (6) months period of the one calendar yearquarter, and shall be furnished to the Association not later than one month forty-five (45) days after the end of the period covered by such report.
2. For purposes of Section 4.08 (c4.08(c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than January 31June 30, 20162012.
Appears in 1 contract
Sources: Financing Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators agreed with the Association. Each Project Report shall cover the first or last six period of one (61) months of the calendar yearquarter, and shall be furnished to the Association not later than one month forty-five (45) days after the end of the period covered by such report.
2. For purposes of Section 4.08 (c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than January October 31, 20162012.
Appears in 1 contract
Sources: Financing Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators agreed with the Association. Each Project Report shall cover the first or last six (6) months period of the one calendar yearsemester, and shall be furnished to the Association not later than one month after the end of the period covered by such report.
2. For purposes of Section 4.08 (c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than January March 31, 20162015 or any later date as agreed by the Recipient and the Association.
Appears in 1 contract
Sources: Financing Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports for the Project in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators agreed with the Association. Each Project Report shall cover the first or last six (6) months period of the one calendar yearsemester, and shall be furnished to the Association not later than one (1) month after the end of the period covered by such report.
2. For purposes of Section 4.08 (c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than January March 31, 20162012.
Appears in 1 contract
Sources: Financing Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators agreed with the Association. Each Project Report shall cover the first or last six (6) months period of the one calendar yearsemester, and shall be furnished to the Association not later than one month after the end of the period covered by such report.
2. For purposes of Section 4.08 (c4.08(c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than January 31June 30, 20162015.
Appears in 1 contract
Sources: Financing Agreement
Project Reports. 1. The Recipient shall shall, through the REB and the IDCOL, monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators agreed with the Association. Each Project Report shall cover the first or last six (6) months period of the one calendar yearsemester, and shall be furnished to the Association not later than one month forty-five (45) days after the end of the period covered by such report.
2. For purposes of Section 4.08 (c4.08(c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than January 31June 30, 20162013.
Appears in 1 contract
Sources: Financing Agreement
Project Reports. 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators agreed with the Association. Each Project Report shall cover the first or last six (6) months period of the one calendar yearsemester, and shall be furnished to the Association not later than one month forty-five (45) days after the end of the period covered by such report.
2. For purposes of Section 4.08 (c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Association not later than January December 31, 20162011.
Appears in 1 contract
Sources: Financing Agreement