Project Reports. The Borrower shall cause the Project Implementing Entity, to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the Bank. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five days (45) after the end of the period covered by such report.
Appears in 8 contracts
Sources: Loan Agreement, Loan Agreement, Loan Agreement
Project Reports. The Borrower shall cause the Project Implementing Entity, to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the Bank. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five days (45) days after the end of the period covered by such report.
Appears in 8 contracts
Sources: Loan Agreement, Loan Agreement, Loan Agreement
Project Reports. 1. The Borrower shall cause the Project Implementing Entity, to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the Bank. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty forty-five days (45) days after the end of the period covered by such report.
2. For purposes of Section 5.08 (c) of the General Conditions, the report on the execution of the Project and related plan required pursuant to that Section shall be furnished to the Bank not later than November 30, 2014.
Appears in 6 contracts
Sources: Loan Agreement, Loan Agreement, Loan Agreement
Project Reports. 1. The Borrower shall cause the Project Implementing Entity, to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with set forth in the BankOperational Manual. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five 45 days (45) after the end of the period covered by such report.
Appears in 5 contracts
Sources: Loan Agreement, Loan Agreement, Loan Agreement
Project Reports. The Borrower shall cause the Project Implementing Entity, to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators set forth in the Operational Manual and agreed with the Bank. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty forty-five days (45) days after the end of the period covered by such report.
Appears in 4 contracts
Sources: Loan Agreement, Loan Agreement, Loan Agreement
Project Reports. 1. The Borrower shall cause the Project Implementing Entity, to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of Project indicators set forth in the indicators agreed with the BankOperational Manual. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five days (45) after the end of the period covered by such report.
Appears in 4 contracts
Sources: Loan Agreement, Loan Agreement, Loan Agreement
Project Reports. 1. The Borrower shall cause the Project Implementing Entity, to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the Bank. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five days (45) one month after the end of the period covered by such report.
Appears in 4 contracts
Sources: Loan Agreement, Loan Agreement, Loan Agreement
Project Reports. 1. The Borrower shall cause the Project Implementing Entity, to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the Bank. Each Project Report shall cover the period of one (1) calendar semesterquarter, and shall be furnished to the Bank not later than forty forty-five days (45) days after the end of the period covered by such report.
Appears in 3 contracts
Sources: Loan Agreement, Loan Agreement, Loan Agreement
Project Reports. 1. The Borrower shall cause the Project Implementing Entity, to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the BankBank and set forth in the Project Operational Manual. Each Project Report shall cover the period of one calendar semesterFY Semester, and shall be furnished to the Bank not later than forty five sixty days (45) after the end of the period covered by such report.
Appears in 3 contracts
Sources: Loan Agreement, Loan Agreement, Loan Agreement
Project Reports. 1. The Borrower shall cause the Project Implementing Entity, to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with (the BankPerformance Indicators) set forth below in the Operational Manual. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty forty-five days (45) after the end of the period covered by such report.
Appears in 3 contracts
Sources: Loan Agreement, Loan Agreement, Loan Agreement
Project Reports. The Borrower shall cause the Project Implementing Entity, to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the Bank. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five days (45) one month after the end of the period covered by such report.
Appears in 3 contracts
Sources: Loan Agreement, Loan Agreement, Loan Agreement
Project Reports. The Borrower shall cause the Project Implementing Entity, to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the Bank. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five days (45) one month after the end of the period covered by such report.
Appears in 3 contracts
Sources: Loan Agreement, Loan Agreement, Loan Agreement
Project Reports. The Borrower shall cause the Project Implementing Entity, to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the Bank. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Bank not later than forty five days one (451) month after the end of the period covered by such report.
Appears in 3 contracts
Sources: Loan Agreement, Loan Agreement, Loan Agreement
Project Reports. 1. The Borrower shall cause the Project Implementing Entity, to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with set forth in Annex B to the BankSchedule of the Project Agreement. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty forty-five days (45) days after the end of the period covered by such report.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Project Reports. 1. The Borrower shall cause the Project Implementing Entity, to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with set forth in the BankAttachment to this Schedule 2. Each Project Report shall cover the period of one (1) calendar semesterquarter, and shall be furnished to the Bank not later than forty forty-five days (45) days after the end of the period covered by such report.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Project Reports. 1. The Borrower shall cause the Project Implementing Entity, Entity to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with acceptable to the Bank. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five days (45) one month after the end of the period covered by such report.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Project Reports. 1. The Borrower shall cause ensure that the Project Implementing Entity, to Entity monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with set forth in Annex B to Schedule to the BankProject Agreement. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Bank not later than forty five days two (452) months after the end of the period covered by such report.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Project Reports. The Borrower shall cause the Project Implementing Entity, PEPS to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the Bank. Each Project Report shall cover the period of one (1) calendar semesterquarter, and shall be furnished to the Bank not later than forty five days (45) days after the end of the period covered by such report.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Project Reports. 1. The Borrower shall cause the Project Implementing Entity, Entity to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the Bankset forth below in Annex 1 to this Schedule 2. Each Project Report shall cover the period of one one(1) calendar semesterquarter, and shall be furnished to the Bank not later than forty forty-five days (45) days after the end of the period covered by such report.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Project Reports. The Borrower shall cause the Project Implementing Entity, Entity to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with acceptable to the Bank. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Bank not later than forty five days (45) days after the end of the period covered by such report.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Project Reports. 1. The Borrower shall cause the Project Implementing Entity, to monitor and evaluate the progress of the Project and, through its Ministry of Environment and Forests, prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the Bank. Each Project Report shall cover the period of one calendar semestersix (6) months in each Fiscal Year, and shall be furnished to the Bank not later than forty five days one (451) month after the end of the period covered by such report.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Project Reports. The Borrower Borrower, through SENER, shall cause the Project Implementing Entity, to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the performance indicators agreed with included in the BankOperational Manual. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five sixty (60) days (45) after the end of the period covered by such report.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Project Reports. The Borrower shall cause the Project Implementing Entity, to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the Bank. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Bank not later than forty forty-five days (45) days after the end of the period covered by such report.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Project Reports. 1. The Borrower shall monitor and evaluate or shall cause the Project Implementing Entity, Entity to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with set forth in the BankAnnex to Schedule 1 to the Project Agreement. Each Project Report shall cover the a six (6) month calendar period of one calendar semesterin each year that is from January through June and from July through December, commencing on July 1, 2007, and shall be furnished to the Bank not later than forty forty-five days (45) days after the end of the period covered by such report.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Project Reports. The Borrower shall cause the Project Implementing Entity, Entity to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the Bank. Each Project Report shall cover the period of one calendar semestertrimester, and shall be furnished to the Bank not later than forty five days (45) one month after the end of the period covered by such report.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Project Reports. The 1. Borrower shall cause the Project Implementing Entity, to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with acceptable to the Bank. Each Project Report shall cover the period of one (1) calendar semesterquarter, and shall be furnished to the Bank not later than forty forty-five days (45) days after the end of the period covered by such report.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Project Reports. The Borrower shall cause the Project Implementing Entity, to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the Bank. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five days (45) days after the end of the period covered by such report.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Project Reports. The Borrower shall monitor and evaluate, and cause the Project Implementing Entity, Entity to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with set forth in Annex B of the BankSchedule to the Project Agreement. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Bank not later than forty five days (45) after the end of the period covered by such reportMarch 1 and September 1 in each year, starting on September 1, 2011.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Project Reports. The Borrower shall cause the Project Implementing Entity, to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with set forth in Annex 1 to the BankSchedule to the Project Agreement. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Bank not later than forty five sixty (60) days (45) after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. The Borrower shall cause the Project Implementing Entity, to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with set forth in Annex 1 to the BankSchedule to the Project Agreement. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Bank not later than forty forty-five days (45) days after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. 1. The Borrower shall cause ensure that the Project Implementing Entity, to monitor Entity monitors and evaluate evaluates the progress of the Project and prepare prepares Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with acceptable to the Bank. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Bank not later than forty forty-five days (45) days after the end of the period covered by each such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. The Borrower shall cause ensure that the Project Implementing Entity, to Entity monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the Bankset forth in a supplemental letter of same date of this Agreement. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five days (45) one and a half months after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. The Borrower shall cause the Project Implementing Entity, Entity to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the Bank. Each Project Report shall cover the period of one (1) calendar semesterquarter, and shall be furnished to the Bank not later than forty forty-five days (45) days after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. 1. The Borrower shall cause the Project Implementing Entity, to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators set forth in the Operational Manual and agreed with the Bank. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Bank not later than forty five 45 days (45) after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. The Borrower shall cause the Project Implementing Entity, Entity to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the Bank. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Bank not later than forty five days (45) days after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. 1. The Borrower shall monitor and evaluate, and cause the Project Implementing Entity, Entity to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with set forth in Annex B to the BankSchedule to the Project Agreement. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Bank not later than forty seventy-five (75) days (45) after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. The Borrower shall cause the Project Implementing Entity, to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the BankBank (“Indicators”). Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five days (45) two months after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. The Borrower shall cause Borrower, together with the Project Implementing Entity, to shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the Bank. Each Project Report such report shall cover the period of one calendar semestereach Fiscal Year quarter, and shall be furnished to the Bank not later than forty five days (45) days after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. The Borrower shall cause the Project Implementing Entity, to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the Bank. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty forty-five days (45) days after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. The Borrower shall cause Borrower, together with the Project Implementing Entity, to shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the Bank. Each Project Report such report shall cover the period of one calendar semestereach Fiscal Year quarter, and shall be furnished to the Bank not later than forty forty-five days (45) days after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. The Borrower shall cause the Project Implementing Entity, to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the Bankset forth in Schedule 4 to this Agreement. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Bank not later than forty five sixty (60) days (45) after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. The Borrower shall cause the Project Implementing Entity, to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with acceptable to the Bank. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Bank not later than forty five days (45) days after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. 1. The Borrower shall, or shall cause the Project Implementing Entity, to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators set forth in the Operational Manual and agreed with the Bank. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five days (45) after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. The Borrower shall cause Borrower, through the Project Implementing Entity, to shall monitor and evaluate the progress of the Project and prepare cause the Project Reports to be prepared in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the Bank. Each Project Report shall cover the period of one calendar semester(1) Financial Year quarter, and shall be furnished to the Bank not later than forty forty-five days (45) days after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. 1. The Borrower shall cause the Project Implementing Entity, to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with set forth in Annex 1 of the BankSchedule to the Project Agreement. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Bank not later than forty five days (45) after the end of the period covered by such report.forty-five
Appears in 1 contract
Sources: Loan Agreement
Project Reports. 1. The Borrower shall cause the Project Implementing Entity, to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the BankBank and included in the Operations Manual. Each Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Bank not later than forty five days (45) days after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. The Borrower shall cause the Project Implementing Entity, Entity to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the Bank. Each Project Report shall cover the period of one (1) calendar semesterquarter, and shall be furnished to the Bank not later than forty forty- five days (45) days after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. 1. The Borrower shall cause the Project Implementing EntityBorrower, to shall, through MIDEPLAN, monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with set forth in the BankOperational Manual. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty forty-five days (45) after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. 1. The Borrower shall cause the Project Implementing Entity, to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with set forth in Annex of the BankSchedule to the Project Agreement. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Bank not later than forty five days (45) after the end of the period covered by such report.forty-five
Appears in 1 contract
Sources: Loan Agreement
Project Reports. 1. The Borrower shall cause the Project Implementing Entity, to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with set forth in Annex 1 to the BankSchedule to the Project Agreement. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Bank not later than forty five sixty (60) days (45) after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. The Borrower shall cause the Project Implementing Entity, to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the Bank. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five days (45) after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. 1. The Borrower shall monitor and evaluate, and shall cause the Project Implementing Entity, Entity to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with set forth in Annex B of the BankSchedule to the Project Agreement. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Bank not later than forty five days (45) after the end of the period covered by such reportFebruary 28 and August 31 in each year, starting on August 31, 2008.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. The Borrower shall and shall cause the Project Implementing Entity, Entity to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the Bank. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five days (45) days after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. The Borrower shall cause the Project Implementing Entity, to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with acceptable to the Bank. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five thirty days (45) after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement
Project Reports. 1. The Borrower shall cause the Project Implementing Entity, to monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the performance indicators agreed with the Bank. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than forty five days (45) one month after the end of the period covered by such report.
Appears in 1 contract
Sources: Loan Agreement