Project Document Review Sample Clauses

Project Document Review. MOHCD will review and comment on draft documents necessary to implement the Retained Housing Obligation, including, but not limited to, loans, grants, exclusive negotiations agreements, disposition and development agreements, and ground leases (“Project Documents”).
AutoNDA by SimpleDocs
Project Document Review. Construction Manager shall review information relevant to the Project including, without limitation, pre-design studies, preliminary site plans, current building program/utilization, Council research, Council-generated Project concepts, proposed building program, environmental investigation and remediation reports, building systems analysis reports, applicable city/state regulations including health code, and Americans with Disabilities Act compliance.

Related to Project Document Review

  • Document Review The Company and the Executive hereby acknowledge and agree that each (i) has read this Agreement in its entirety prior to executing it, (ii) understands the provisions and effects of this Agreement, (iii) has consulted with such attorneys, accountants and financial and other advisors as it or he has deemed appropriate in connection with their respective execution of this Agreement, and (iv) has executed this Agreement voluntarily and knowingly.

  • Project Documentation All documentation provided to the City other than Project drawings shall be furnished on a Microsoft compatible compact disc.

  • Project contract 1. For each approved project a project contract shall be concluded between the Programme Operator and the Project Promoter.

  • Agreement Review If, pursuant to section 25.10 (Review of Agreement) of the Bilateral Agreement, the Bilateral Agreement is reviewed after three or five years, or both, of the effective date of the Bilateral Agreement, and any changes to the Bilateral Agreement are required as a result, the Parties agree to amend the Agreement as necessary and in a manner that is consistent with such changes.

  • Project Documents In addition to any other pertinent and necessary Project documents, the following documents shall be used in the development of the Project:

  • Project Review A. Programmatic Allowances

  • Construction Document Phase 1.4.1 Based on the approved Design Development Documents, Guaranteed Maximum Price, coordinated models and any further adjustments in the scope or quality of the Project or in the Amount Available for the Construction Contract authorized by the Owner, the Architect/Engineer shall prepare, for approval by the Owner and review by the Construction Manager, Construction Documents consisting of Drawings, Schedules and Specifications derived from the model(s) in accordance with Owner’s written requirements setting forth in detail the requirements for construction of the Project, including, without limitation, the BIM Execution Plan and “Facility Design Guidelines”. The Plans, Drawings and Specifications for the entire Project shall be so prepared that same will call for the construction of the building and related facilities, together with its built-in permanent fixtures and equipment which will cost not more than the Guaranteed Maximum Price accepted by Owner, or the Amount Available for the Construction Contract established by Owner if no Guaranteed Maximum Price proposal has been accepted by Owner. The Architect/Engineer will be responsible for managing the design to stay within such Guaranteed Maximum Price proposal or Amount Available for the Construction Contract. The Architect/Engineer shall review the Construction Documents as they are being prepared at intervals appropriate to the progress of the Project with the Owner and Construction Manager at the Project site or other location specified by Owner in the State of Texas. The Architect/Engineer shall utilize the model(s) to support the review process during Construction Documents. The Architect/Engineer shall provide the Construction Manager with a compact disc containing documents and data files derived from the model to assist the Construction Manager in fulfilling its responsibilities to the Owner.

  • REVIEW OF CONTRACT DOCUMENTS 4.2.1 The Contractor shall carefully study and compare the Contract Documents and shall immediately report in writing to the Architect and the State any error, inconsistency or omission he may discover. The Contractor shall not be liable to the State or the Architect for any damage resulting from any such errors, inconsistencies or omissions in the Contract Documents. The Contractor shall perform no portion of the Work at any time without Contract Documents or, where required, approved Shop Drawings, Product Data or Samples for such portion of the Work.

  • Project Completion Report At the completion of construction and once a Project is placed in service, the Subrecipient must submit a Project Completion Report that includes the total number of units built and leased, affordable units built and leased, DR-MHP units built and leased, an accomplishment narrative, and the tenants names, demographics and income for each DR-MHP unit.

  • Construction Contract Documents The Construction Contract Documents shall consist of the plans and specifications prepared by the Engineer, and any addenda and change orders thereto, and the Owner-Contractor Agreement, all of which shall be compatible and consistent with this Agreement.

Time is Money Join Law Insider Premium to draft better contracts faster.