Process Yield Clause Samples

Process Yield. The Parties will meet on [**] basis during the Term to review the Batch yields for the Drug Substance Manufactured during the prior [**]. If the Drug Substance Batch production yield is repeatedly above or below the agreed upon average yield described in Section 2.3, as such average yield may be adjusted during the Term pursuant to the Continuous Improvement Program, the Parties will evaluate such trends and agree to negotiate in good faith a fair and equitable adjustment to the pricing for the Drug Substance.
Process Yield 

Related to Process Yield

  • MEASUREMENT AND VERIFICATION The goal of this task is to report the benefits resulting from this project by performing M&V of GHG and energy consumption reduction. • Enter into agreement with M&V subcontractor per subtask 1.9 (if using outside vendor) • Coordinate demonstration site visits with the M&V subcontractor at the demonstration site • Develop M&V protocol for pre-installation measurements (and calculations): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8, FPIP Calculator Tool of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for each project demonstration site to include but not be limited to: o A description of the monitoring equipment and instrumentation that will be used. o A description of the key input parameters and output metrics that will be measured. o A description of the M&V protocol and analysis methods to be employed. o A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre-installation measurements (and calculations) based on the M&V protocol for pre-installation. • Prepare and provide a Pre-Installation M&V Findings Report that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months (or shorter period as approved in writing by the CAM) of post- installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to:

  • Account Verification Whether or not a Default or Event of Default exists, Agent shall have the right at any time, in the name of Agent, any designee of Agent or any Borrower, to verify the validity, amount or any other matter relating to any Accounts of Borrowers by mail, telephone or otherwise. Borrowers shall cooperate fully with Agent in an effort to facilitate and promptly conclude any such verification process.

  • Monthly Data Download Not later than fifteen (15) days after the end of each month, beginning with the month in which the Commencement Date occurs and ending with the Final Shared-Loss Recovery Month, Assuming Bank shall provide Receiver:

  • Measurement and Billing 5.6.1 For billing purposes, each Party shall pass Calling Party Number (“CPN”) information on each call carried over the Traffic Exchange Trunks at such time as the originating switch is equipped for SS7 and from all switches no later than December 31, 1998. At such time as either Party has the ability, as the Party receiving the traffic, to use such CPN information to classify on an automated basis traffic delivered by the other Party as either Local Traffic or Toll Traffic, such receiving Party shall bill the originating Party the Local Traffic termination rates, Intrastate Exchange Access rates, or Interstate Exchange Access rates applicable to each minute of Traffic for which CPN is passed, as provided in Exhibit A and applicable Tariffs. 5.6.2 If, under the circumstances set forth in subsection 5.6.1, the originating Party does not pass CPN on up to ten percent (10%) of calls, the receiving Party shall bill the originating Party the Local Traffic termination rates, Intrastate Exchange Access rates, Intrastate/Interstate Transit Traffic rates, or Interstate Exchange Access rates applicable to each minute of traffic, as provided in Exhibit A and applicable Tariffs, for which CPN is passed. For the remaining up to ten percent (10%) of calls without CPN information, the receiving Party shall bill the originating Party for such traffic as Local Traffic termination rates, Intrastate Exchange Access rates, Intrastate/Interstate Transit Traffic rates, or Interstate Exchange Access rates applicable to each minute of traffic, as provided in Exhibit A and applicable Tariffs, in direct proportion to the minutes of use of calls passed with CPN information. 5.6.3 If the originating Party does not pass CPN on more than ten percent (10%) of calls, or if the receiving Party lacks the ability to use CPN information to classify on an automated basis traffic delivered by the other Party as either Local Traffic or Toll Traffic, and the originating Party chooses to combine Local and Toll Traffic on the same trunk group, it will supply an auditable Percent Local Use (“PLU”) report quarterly, based on the previous three months’ traffic, and applicable to the following three months. If the originating Party also chooses to combine Interstate and Intrastate Toll Traffic on the same trunk group, it will supply an auditable Percent Interstate Use (“PIU”) report quarterly, based on the previous three months’ terminating traffic, and applicable to the following three months. In lieu of the foregoing PLU and/or PIU reports, the Parties may agree to provide and accept reasonable surrogate measures for an agreed-upon interim period. 5.6.4 Measurement of billing minutes for purposes of determining terminating compensation shall be in conversation seconds.

  • Induction Procedures a) The parties to this Agreement acknowledge that it is in the interests of the industry that all new employees and employers on a building project understand their obligations to this Agreement and are introduced to their jobs in a manner which will help them work safely and efficiently. b) In order to achieve this it is recommended that, in conjunction with the Site Management, Job ▇▇▇▇▇▇▇ and Safety Supervisor/Safety Committee, new employees and new employers be given an explanation of the following: ⮚ The Rights and Obligations of this Agreement including its disputes/grievance resolution procedures; ⮚ The appropriate issue of work clothing and safety equipment as per this Agreement; ⮚ Safety Rules and Procedures including relevant legislation; ⮚ Superannuation entitlements; ⮚ Long Service Leave provisions; ⮚ Redundancy Pay entitlements; ⮚ Site Emergency procedures; ⮚ Award or Enterprise Agreement rates of pay; ⮚ Site-specific matters such as security, etc. procedures; ⮚ Rights, obligations and benefits of union membership. c) The induction presentation and material shall have regard to the language skills of the employee/employer.