Preventive or Planned Maintenance Sample Clauses

Preventive or Planned Maintenance. The Preventive or Planned Maintenance of the Facility will be comprised of regular visits to all the equipment composing the Facility, replacement of fungible materials and correction of those systems whose failure or deterioration is statistically foreseeable with materials, tools, supervisor and labour, pursuant to the provisions of Operation and Maintenance Manuals and Operation and Maintenance Procedures of the equipment installed at the Facility. The following tasks, but not limited to, will be carried out: • Cleaning the mirrors in the parabolic cylinder collector field with osmotized water, including maintenance of the cleaning vehicle(s). Cleaning machines, as well as the rest of special tools or machines described in Annex A to the EPC Contract, will be provided by the EPC Contractor before the Practical Completion. • Periodic revisions of a meaningful sample of collectors by means of techniques of Photogrammetry. • Maintenance of the instrumentation and control system (Level I, II and III). • Maintenance of drive systems by visual inspection and orientation as well as the replacement and inspection of oil levels every six (6) months. • Maintenance of the mirrors and collectors. • Maintenance of mirror and collector components and others (fuses of field connection boxes, etc.). • Maintenance of the receiver tubes. • Maintenance of the steam generator and its auxiliary equipment. • Maintenance of the steam turbine and its auxiliary equipment (including those to have an appropriate subcontractor as needed to maintain the steam turbine pursuant to long term maintenance agreement to be concluded). • Maintenance of connection facilities to third party reservoir. • Maintenance of the water treatment plant. • Maintenance of the effluent treatment and drainage system and connection facilities to shared wastewater manhole. • Maintenance and measurement required by the regulation for the Facility. • Maintenance of medium voltage facility. • Planned maintenance of substation and high voltage electrical line to the collector substation “Mesa de la Copa”.