Preliminary Construction Sequence Sample Clauses

Preliminary Construction Sequence. The Engineer shall prepare a Preliminary Construction Sequence Layout in conjunction with the Geometric Schematic depicting the phasing and traffic detours anticipated to construct the proposed design.
AutoNDA by SimpleDocs
Preliminary Construction Sequence. The Engineer shall prepare a Preliminary Construction Sequence Layout in conjunction with the DocuSign Envelope ID: 92042E15-24A8-4715-A668-00F8B487D7CE Geometric Schematic depicting the phasing and traffic detours anticipated to construct the proposed design.
Preliminary Construction Sequence. The Engineer shall prepare two (2) Preliminary Construction Sequence Layouts in conjunction with the Geometric Schematic depicting the phasing and traffic detours anticipated for both the Conventional Traffic Control and Traffic Handling method and the Pavement Salvaging Traffic Control and Traffic Handling method to construct the proposed design. The approved Construction Sequence will be provided as part of the PS&E.
Preliminary Construction Sequence. The Engineer shall prepare a Preliminary Construction Sequence Layout in conjunction with the Geometric Schematic depicting the phasing and traffic detours anticipated to construct the proposed design. The Engineer shall consider the requirements for construction and traffic control throughout the development of schematic design to ensure that the proposed design can be constructed. The construction sequencing plan will be coordinated with the proposed paving, drainage, and existing and proposed utility locations, structures, signalized intersections, pedestrian pathways and sidewalks. The Engineer shall submit the preliminary construction sequencing plan to the State for review and approval. Up to two alternate sequencing plans/phasing layouts will be prepared for consideration and final determination by the State which alternate to incorporate into the plans.

Related to Preliminary Construction Sequence

  • Special Construction If, after an order is placed, Xxxxxxx finds that third-party special construction services are needed to build, configure or install any additional facilities and/or equipment necessary for Verizon to provide Access service, Verizon will notify the Customer of any such special construction charges. If Customer does not accept the special construction charges, Customer may terminate the order(s) affected by the special construction charges, with no cancellation fee(s).

  • ADDITIONAL CONSTRUCTIONS The Promoter undertakes that it has no right to make additions or to put up additional structure(s) anywhere in the Project after the building plan has been approved by the competent authority(ies) except for as provided in the Act.

  • Project Construction The Contractor agrees to provide continuous on-site supervision on each Job Order, while progress on the project is being accomplished. The Contractor’s Project Manager will ensure:

  • ADDITIONAL CONSTRUCTION The Promoter undertakes that it has no right to make additions or to put up additional structure(s) anywhere in the Project after the building plan has been approved by the competent authority (ies) except for as provided in the Act.

  • DAF Construction The DAF shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Developer and Connecting Transmission Owner agree on another mutually acceptable deadline, the Developer shall deliver to the Connecting Transmission Owner and NYISO “as- built” drawings, information and documents for the DAF, such as: a one-line diagram, a site plan showing the Large Generating Facility and the DAF, plan and elevation drawings showing the layout of the DAF, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Developer’s step-up transformers, the facilities connecting the Large Generating Facility to the step-up transformers and the DAF, and the impedances (determined by factory tests) for the associated step-up transformers and the Large Generating Facility. The Developer shall provide to, and coordinate with, Connecting Transmission Owner and NYISO with respect to proposed specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable.

  • Construction Schedule The progress schedule of construction of the Project as provided by Developer and approved by District.

  • Completion of Construction Within 60 days of the completion of construction of the Project, Project Owner shall deliver to DoD copies of the FAA form 7460-2 for each ASN, including the final coordinates for each turbine erected.

  • Early Construction of Base Case Facilities Developer may request Connecting Transmission Owner to construct, and Connecting Transmission Owner shall construct, subject to a binding cost allocation agreement reached in accordance with Attachment S to the NYISO OATT, including Section 25.8.7 thereof, using Reasonable Efforts to accommodate Developer’s In-Service Date, all or any portion of any System Upgrade Facilities or System Deliverability Upgrades required for Developer to be interconnected to the New York State Transmission System which are included in the Base Case of the Facilities Study for the Developer, and which also are required to be constructed for another Developer, but where such construction is not scheduled to be completed in time to achieve Developer’s In-Service Date.