Pipeline Locations Clause Samples
Pipeline Locations. All pipelines located within one hundred fifty (150) feet of the beach and dune fill area, borrow area, pump-out area(s), and conveyance corridor(s) shall be probed by the Contractor for depth and their locations marked prior to excavation, dredging, and installation of the sediment pipeline(s), for the duration of construction activities. A buffer distance of fifty (50) feet from any pipeline, utility, or obstruction within the fill area, pump-out area(s), and conveyance corridor(s) shall also be staked prior to excavation by the Contractor. No dredging as well as no bottom disturbing activities (including anchoring and spudding) may take place within one thousand (1,000) feet of any existing pipeline adjacent to the borrow area. Northing and Easting locations of each probing attempt and a description of the findings that include the depth of probe, depth of cover, and water bottom elevations shall be recorded in a table and provided with the survey deliverables.
