Payment of Liquidated Damages. WITH RESPECT TO ANY TERMINATION FEES PAYABLE IN CONNECTION WITH ANY EARLY TERMINATION RIGHT SET FORTH IN THIS SECTION 2.03, OR IN SECTION 18.04 BELOW, LESSEE RECOGNIZES AND AGREES THAT, IF THIS AGREEMENT IS TERMINATED WITH RESPECT TO ANY OF THE HOTELS FOR THE REASONS SPECIFIED IN THIS SECTION 2.03 OR IN SECTION 18.04 BELOW, THEREBY ENTITLING MANAGER TO RECEIVE THE TERMINATION FEES AS SET FORTH IN THIS SECTION 2.03 OR IN SECTION 18.04 BELOW, MANAGER WOULD SUFFER AN ECONOMIC LOSS BY VIRTUE OF THE RESULTING LOSS OF MANAGEMENT FEES WHICH WOULD OTHERWISE HAVE BEEN EARNED UNDER THIS AGREEMENT. BECAUSE SUCH FEES VARY IN AMOUNT DEPENDING ON THE TOTAL GROSS REVENUES EARNED AT THE HOTELS AND ACCORDINGLY WOULD BE EXTREMELY DIFFICULT AND IMPRACTICAL TO ASCERTAIN WITH CERTAINTY, THE PARTIES AGREE THAT THE TERMINATION FEES PROVIDED IN THIS SECTION 2.03 AND IN SECTION 18.04 BELOW CONSTITUTE A REASONABLE ESTIMATE OF LIQUIDATED DAMAGES TO MANAGER FOR PURPOSES OF ANY AND ALL LEGAL REQUIREMENTS, AND IT IS AGREED THAT MANAGER SHALL NOT BE ENTITLED TO MAINTAIN A CAUSE OF ACTION AGAINST LESSEE, EXCEPT AS SPECIFICALLY PROVIDED HEREIN, FOR ACTUAL DAMAGES IN EXCESS OF THE TERMINATION FEES IN ANY CONTEXT WHERE THE TERMINATION FEES ARE PROVIDED BY THIS AGREEMENT, AND RECEIPT OF SUCH FEES (TOGETHER WITH ALL OTHER AMOUNTS DUE AND PAYABLE BY LESSEE TO MANAGER WITH RESPECT TO EVENTS OCCURRING PRIOR TO TERMINATION OF THIS AGREEMENT WITH RESPECT TO THE APPLICABLE HOTELS OR AS OTHERWISE PROVIDED HEREIN) SHALL BE MANAGER’S SOLE REMEDY FOR DAMAGES AGAINST LESSEE IN ANY SUCH CASE. The foregoing shall in no way affect any other sums due Manager under this Article II or otherwise hereunder, including, without limitation, the Management Fees earned during the Term, or any other rights or remedies, at law or in equity of Manager under this Agreement or under Legal Requirements, including any indemnity obligations of Lessee to Manager under this Agreement.
Appears in 6 contracts
Samples: Management Agreement (Ashford Hospitality Prime, Inc.), Development Agreement (Ashford Hospitality Prime, Inc.), Management Agreement (Ashford Hospitality Prime, Inc.)
Payment of Liquidated Damages. WITH RESPECT TO ANY TERMINATION FEES PAYABLE IN CONNECTION WITH ANY EARLY TERMINATION RIGHT SET FORTH IN THIS SECTION 2.03, OR IN SECTION 18.04 BELOW, LESSEE RECOGNIZES AND AGREES THAT, IF THIS AGREEMENT IS TERMINATED WITH RESPECT TO ANY OF THE HOTELS FOR THE REASONS SPECIFIED IN THIS SECTION 2.03 OR IN SECTION 18.04 BELOW2.03, THEREBY ENTITLING MANAGER TO RECEIVE THE TERMINATION FEES AS SET FORTH IN THIS SECTION 2.03 OR IN SECTION 18.04 BELOW2.03, MANAGER WOULD SUFFER AN ECONOMIC LOSS BY VIRTUE OF THE RESULTING LOSS OF MANAGEMENT FEES WHICH WOULD OTHERWISE HAVE BEEN EARNED UNDER THIS AGREEMENT. BECAUSE SUCH FEES VARY IN AMOUNT DEPENDING ON THE TOTAL GROSS REVENUES EARNED CAPITAL IMPROVEMENT BUDGET AT THE HOTELS AND ACCORDINGLY WOULD BE EXTREMELY DIFFICULT AND IMPRACTICAL TO ASCERTAIN WITH CERTAINTY, THE PARTIES AGREE THAT THE TERMINATION FEES PROVIDED IN THIS SECTION 2.03 AND IN SECTION 18.04 BELOW CONSTITUTE A REASONABLE ESTIMATE OF LIQUIDATED DAMAGES TO MANAGER FOR PURPOSES OF ANY AND ALL LEGAL REQUIREMENTS, AND IT IS AGREED THAT MANAGER SHALL NOT BE ENTITLED TO MAINTAIN A CAUSE OF ACTION AGAINST LESSEE, EXCEPT AS SPECIFICALLY PROVIDED HEREIN, FOR ACTUAL DAMAGES IN EXCESS OF THE TERMINATION FEES IN ANY CONTEXT WHERE THE TERMINATION FEES ARE PROVIDED BY THIS AGREEMENT, AND RECEIPT OF SUCH FEES (TOGETHER WITH ALL OTHER AMOUNTS DUE AND PAYABLE BY LESSEE TO MANAGER WITH RESPECT TO EVENTS OCCURRING PRIOR TO TERMINATION OF THIS AGREEMENT WITH RESPECT TO THE APPLICABLE HOTELS OR AS OTHERWISE PROVIDED HEREIN) SHALL BE MANAGER’S SOLE REMEDY FOR DAMAGES AGAINST LESSEE IN ANY SUCH CASE. The foregoing shall in no way affect any other sums due Manager under this Article II or otherwise hereunder, including, without limitation, the Management Fees earned during the Term, or any other rights or remedies, at law or in equity of Manager under this Agreement or under Legal Requirements, including any indemnity obligations of Lessee to Manager under this Agreement.
Appears in 4 contracts
Samples: Management Agreement (Braemar Hotels & Resorts Inc.), Master Project Management Agreement (Ashford Hospitality Trust Inc), Master Project Management Agreement (Ashford Inc.)
Payment of Liquidated Damages. WITH RESPECT TO ANY TERMINATION FEES PAYABLE IN CONNECTION WITH ANY EARLY TERMINATION RIGHT SET FORTH IN THIS SECTION 2.03, OR IN SECTION 18.04 BELOW, LESSEE RECOGNIZES AND AGREES THAT, IF THIS AGREEMENT IS TERMINATED WITH RESPECT TO ANY OF THE HOTELS A HOTEL FOR THE REASONS SPECIFIED IN THIS SECTION 2.03 OR IN SECTION 18.04 BELOW, THEREBY ENTITLING MANAGER TO RECEIVE THE TERMINATION FEES AS SET FORTH IN THIS SECTION 2.03 OR IN SECTION 18.04 BELOW, MANAGER WOULD SUFFER AN ECONOMIC LOSS BY VIRTUE OF THE RESULTING LOSS OF MANAGEMENT FEES WHICH WOULD OTHERWISE HAVE BEEN EARNED UNDER THIS AGREEMENT. BECAUSE SUCH FEES VARY IN AMOUNT DEPENDING ON THE TOTAL GROSS REVENUES EARNED AT THE HOTELS HOTEL AND ACCORDINGLY WOULD BE EXTREMELY DIFFICULT AND IMPRACTICAL TO ASCERTAIN WITH CERTAINTY, THE PARTIES AGREE THAT THE TERMINATION FEES PROVIDED IN THIS SECTION 2.03 AND IN SECTION 18.04 BELOW CONSTITUTE A REASONABLE ESTIMATE OF LIQUIDATED DAMAGES TO MANAGER FOR PURPOSES OF ANY AND ALL LEGAL REQUIREMENTS, AND IT IS AGREED THAT MANAGER SHALL NOT BE ENTITLED TO MAINTAIN A CAUSE OF ACTION AGAINST LESSEE, EXCEPT AS SPECIFICALLY PROVIDED HEREIN, FOR ACTUAL DAMAGES IN EXCESS OF THE TERMINATION FEES IN ANY CONTEXT WHERE THE TERMINATION FEES ARE PROVIDED BY THIS AGREEMENT, AND RECEIPT OF SUCH FEES (TOGETHER WITH ALL OTHER AMOUNTS DUE AND PAYABLE BY LESSEE TO MANAGER WITH RESPECT TO EVENTS OCCURRING PRIOR TO TERMINATION OF THIS AGREEMENT WITH RESPECT TO THE APPLICABLE HOTELS HOTEL OR AS OTHERWISE PROVIDED HEREIN) SHALL BE MANAGER’S SOLE REMEDY FOR DAMAGES AGAINST LESSEE IN ANY SUCH CASE. The foregoing shall in no way affect any other sums due Manager under this Article II or otherwise hereunder, including, without limitation, the Management Fees earned during the Term, or any other rights or remedies, at law or in equity of Manager under this Agreement or under Legal Requirements, including any indemnity obligations of Lessee to Manager under this Agreement.
Appears in 3 contracts
Samples: Hotel Master Management Agreement (Ashford Hospitality Trust Inc), Hotel Master Management Agreement (Ashford Inc.), Hotel Master Management Agreement (Stirling Hotels & Resorts, Inc.)
Payment of Liquidated Damages. WITH RESPECT TO ANY TERMINATION FEES PAYABLE IN CONNECTION WITH ANY EARLY TERMINATION RIGHT SET FORTH IN THIS SECTION 2.03, OR IN SECTION 18.04 BELOW, LESSEE XXXXXX RECOGNIZES AND AGREES THAT, IF THIS AGREEMENT IS TERMINATED WITH RESPECT TO ANY OF THE HOTELS HOTEL FOR THE REASONS SPECIFIED IN THIS SECTION 2.03 OR IN SECTION 18.04 BELOW2.03, THEREBY ENTITLING MANAGER TO RECEIVE THE TERMINATION FEES AS SET FORTH IN THIS SECTION 2.03 OR IN SECTION 18.04 BELOW2.03, MANAGER WOULD SUFFER AN ECONOMIC LOSS BY VIRTUE OF THE RESULTING LOSS OF MANAGEMENT FEES WHICH WOULD OTHERWISE HAVE BEEN EARNED UNDER THIS AGREEMENT. BECAUSE SUCH FEES VARY IN AMOUNT DEPENDING ON THE TOTAL GROSS REVENUES EARNED CAPITAL IMPROVEMENT BUDGET AT THE HOTELS HOTEL AND ACCORDINGLY WOULD BE EXTREMELY DIFFICULT AND IMPRACTICAL TO ASCERTAIN WITH CERTAINTY, THE PARTIES AGREE THAT THE TERMINATION FEES PROVIDED IN THIS SECTION 2.03 AND IN SECTION 18.04 BELOW CONSTITUTE A REASONABLE ESTIMATE OF LIQUIDATED DAMAGES TO MANAGER FOR PURPOSES OF ANY AND ALL LEGAL REQUIREMENTS, AND IT IS AGREED THAT MANAGER SHALL NOT BE ENTITLED TO MAINTAIN A CAUSE OF ACTION AGAINST LESSEE, EXCEPT AS SPECIFICALLY PROVIDED HEREIN, FOR ACTUAL DAMAGES IN EXCESS OF THE TERMINATION FEES IN ANY CONTEXT WHERE THE TERMINATION FEES ARE PROVIDED BY THIS AGREEMENT, AND RECEIPT OF SUCH FEES (TOGETHER WITH ALL OTHER AMOUNTS DUE AND PAYABLE BY LESSEE TO MANAGER WITH RESPECT TO EVENTS OCCURRING PRIOR TO TERMINATION OF THIS AGREEMENT WITH RESPECT TO THE APPLICABLE HOTELS HOTEL OR AS OTHERWISE PROVIDED HEREIN) SHALL BE MANAGER’S SOLE REMEDY FOR DAMAGES AGAINST LESSEE IN ANY SUCH CASE. The foregoing shall in no way affect any other sums due Manager under this Article II or otherwise hereunder, including, without limitation, the Management Fees earned during the Term, or any other rights or remedies, at law or in equity of Manager under this Agreement or under Legal Requirements, including any indemnity obligations of Lessee to Manager under this Agreement.
Appears in 2 contracts
Samples: Master Project Management Agreement (Ashford Inc.), Master Project Management Agreement (Ashford Hospitality Trust Inc)
Payment of Liquidated Damages. WITH RESPECT TO ANY TERMINATION FEES PAYABLE IN CONNECTION WITH ANY EARLY TERMINATION RIGHT SET FORTH IN THIS SECTION 2.03, OR IN SECTION 18.04 BELOW, LESSEE RECOGNIZES AND AGREES THAT, IF THIS AGREEMENT IS TERMINATED WITH RESPECT TO ANY OF THE HOTELS FOR THE REASONS SPECIFIED IN THIS SECTION 2.03 OR IN SECTION 18.04 BELOW, THEREBY ENTITLING MANAGER TO RECEIVE THE TERMINATION FEES AS SET FORTH IN THIS SECTION 2.03 OR IN SECTION 18.04 BELOW, MANAGER WOULD SUFFER AN ECONOMIC LOSS BY VIRTUE OF THE RESULTING LOSS OF MANAGEMENT FEES WHICH WOULD OTHERWISE HAVE BEEN EARNED UNDER THIS AGREEMENT. BECAUSE SUCH FEES VARY IN AMOUNT DEPENDING ON THE TOTAL GROSS REVENUES EARNED AT THE HOTELS AND ACCORDINGLY WOULD BE EXTREMELY DIFFICULT AND IMPRACTICAL TO ASCERTAIN WITH CERTAINTY, THE PARTIES AGREE THAT THE TERMINATION FEES PROVIDED IN THIS SECTION 2.03 AND IN SECTION 18.04 BELOW CONSTITUTE A REASONABLE ESTIMATE OF LIQUIDATED DAMAGES TO MANAGER FOR PURPOSES OF ANY AND ALL LEGAL REQUIREMENTS, AND IT IS AGREED THAT MANAGER SHALL NOT BE ENTITLED TO MAINTAIN A CAUSE OF ACTION AGAINST LESSEE, EXCEPT AS SPECIFICALLY PROVIDED HEREIN, FOR ACTUAL DAMAGES IN EXCESS OF THE TERMINATION FEES IN ANY CONTEXT WHERE THE TERMINATION FEES ARE PROVIDED BY THIS AGREEMENT, AND RECEIPT OF SUCH FEES (TOGETHER WITH ALL OTHER AMOUNTS DUE AND PAYABLE BY LESSEE TO MANAGER WITH RESPECT TO EVENTS OCCURRING PRIOR TO TERMINATION OF THIS AGREEMENT WITH RESPECT TO THE APPLICABLE HOTELS OR AS OTHERWISE PROVIDED HEREIN) SHALL BE MANAGER’S SOLE REMEDY FOR DAMAGES AGAINST LESSEE IN ANY SUCH CASE. The foregoing shall in no way affect any other sums due Manager under this Article II or otherwise hereunder, including, without limitation, the Management Fees earned during the Term, or any other rights or remedies, at law or in equity of Manager under this Agreement or under Legal Requirements, including any indemnity obligations of Lessee to Manager under this Agreement.. Hotel Master Management Agreement Ashford TRS Corporation File No. 145765
Appears in 1 contract
Samples: Hotel Master Management Agreement (Ashford Hospitality Trust Inc)
Payment of Liquidated Damages. WITH RESPECT TO ANY TERMINATION FEES PAYABLE IN CONNECTION WITH ANY EARLY TERMINATION RIGHT SET FORTH IN THIS SECTION 2.03, OR IN SECTION 18.04 BELOW, LESSEE RECOGNIZES AND AGREES THAT, IF THIS AGREEMENT IS TERMINATED WITH RESPECT TO ANY OF THE HOTELS FOR THE REASONS SPECIFIED IN THIS SECTION 2.03 OR IN SECTION 18.04 BELOW, THEREBY ENTITLING MANAGER TO RECEIVE THE TERMINATION FEES AS SET FORTH IN THIS SECTION 2.03 OR IN SECTION 18.04 BELOW, MANAGER WOULD SUFFER AN ECONOMIC LOSS BY VIRTUE OF THE RESULTING LOSS OF MANAGEMENT FEES WHICH WOULD OTHERWISE HAVE BEEN EARNED UNDER THIS AGREEMENT. BECAUSE SUCH FEES VARY IN AMOUNT DEPENDING ON THE TOTAL GROSS REVENUES EARNED AT THE HOTELS AND ACCORDINGLY WOULD BE EXTREMELY DIFFICULT AND IMPRACTICAL TO ASCERTAIN WITH CERTAINTY, THE PARTIES AGREE THAT THE TERMINATION FEES PROVIDED IN THIS SECTION 2.03 AND IN SECTION 18.04 BELOW CONSTITUTE A REASONABLE ESTIMATE OF LIQUIDATED DAMAGES TO MANAGER FOR PURPOSES OF ANY AND ALL LEGAL REQUIREMENTS, AND IT IS AGREED THAT MANAGER SHALL NOT BE ENTITLED TO MAINTAIN A CAUSE OF ACTION AGAINST LESSEE, Hotel Master Management Agreement Ashford TRS Corporation EXCEPT AS SPECIFICALLY PROVIDED HEREIN, FOR ACTUAL DAMAGES IN EXCESS OF THE TERMINATION FEES IN ANY CONTEXT WHERE THE TERMINATION FEES ARE PROVIDED BY THIS AGREEMENT, AND RECEIPT OF SUCH FEES (TOGETHER WITH ALL OTHER AMOUNTS DUE AND PAYABLE BY LESSEE TO MANAGER WITH RESPECT TO EVENTS OCCURRING PRIOR TO TERMINATION OF THIS AGREEMENT WITH RESPECT TO THE APPLICABLE HOTELS OR AS OTHERWISE PROVIDED HEREIN) SHALL BE MANAGER’S 'S SOLE REMEDY FOR DAMAGES AGAINST LESSEE IN ANY SUCH CASE. The foregoing shall in no way affect any other sums due Manager under this Article ARTICLE II or otherwise hereunder, including, without limitation, the Management Fees earned during the Term, or any other rights or remedies, at law or in equity of Manager under this Agreement or under Legal Requirements, including any indemnity obligations of Lessee to Manager under this Agreement.
Appears in 1 contract
Samples: Master Management Agreement (Ashford Hospitality Trust Inc)
Payment of Liquidated Damages. WITH RESPECT TO ANY TERMINATION FEES PAYABLE IN CONNECTION WITH ANY EARLY TERMINATION RIGHT SET FORTH IN THIS SECTION 2.03, OR IN SECTION 18.04 BELOW, LESSEE RECOGNIZES AND AGREES THAT, IF THIS AGREEMENT IS TERMINATED WITH RESPECT TO ANY OF THE HOTELS FOR THE REASONS SPECIFIED IN THIS SECTION 2.03 OR IN SECTION 18.04 BELOW, THEREBY ENTITLING MANAGER TO RECEIVE THE TERMINATION FEES AS SET FORTH IN THIS SECTION 2.03 OR IN SECTION 18.04 BELOW, MANAGER WOULD SUFFER AN ECONOMIC LOSS BY VIRTUE OF THE RESULTING LOSS OF MANAGEMENT FEES WHICH WOULD OTHERWISE HAVE BEEN EARNED UNDER THIS AGREEMENT. BECAUSE SUCH FEES VARY IN AMOUNT DEPENDING ON THE TOTAL GROSS REVENUES EARNED AT THE HOTELS AND ACCORDINGLY WOULD BE EXTREMELY DIFFICULT AND IMPRACTICAL TO ASCERTAIN WITH CERTAINTY, THE PARTIES AGREE THAT THE TERMINATION FEES PROVIDED IN THIS SECTION 2.03 AND IN SECTION 18.04 BELOW CONSTITUTE A REASONABLE ESTIMATE OF LIQUIDATED DAMAGES TO MANAGER FOR PURPOSES OF ANY AND ALL LEGAL REQUIREMENTS, AND IT IS AGREED THAT MANAGER SHALL NOT BE ENTITLED TO MAINTAIN A CAUSE OF ACTION AGAINST LESSEE, EXCEPT AS SPECIFICALLY PROVIDED HEREIN, FOR ACTUAL DAMAGES IN EXCESS OF THE TERMINATION FEES IN ANY CONTEXT WHERE THE TERMINATION FEES ARE PROVIDED BY THIS AGREEMENT, AND RECEIPT OF SUCH FEES (TOGETHER WITH ALL OTHER AMOUNTS DUE AND PAYABLE BY LESSEE TO MANAGER WITH RESPECT TO EVENTS OCCURRING PRIOR TO TERMINATION OF THIS AGREEMENT WITH RESPECT TO THE APPLICABLE HOTELS OR AS OTHERWISE PROVIDED HEREIN) SHALL BE MANAGER’S SOLE REMEDY FOR DAMAGES AGAINST LESSEE IN ANY SUCH CASE. The foregoing shall in no way affect any other sums due Manager under this Article II or otherwise hereunder, including, without limitation, the Hotel Master Management Agreement Ashford TRS Corporation File No. 145765 Management Fees earned during the Term, or any other rights or remedies, at law or in equity of Manager under this Agreement or under Legal Requirements, including any indemnity obligations of Lessee to Manager under this Agreement.
Appears in 1 contract
Samples: Hotel Master Management Agreement (Ashford Hospitality Trust Inc)
Payment of Liquidated Damages. WITH RESPECT TO ANY TERMINATION FEES PAYABLE IN CONNECTION WITH ANY EARLY TERMINATION RIGHT SET FORTH IN THIS SECTION 2.03, OR IN SECTION 18.04 BELOW, LESSEE LXXXXX RECOGNIZES AND AGREES THAT, IF THIS AGREEMENT IS TERMINATED WITH RESPECT TO ANY OF THE HOTELS HOTEL FOR THE REASONS SPECIFIED IN THIS SECTION 2.03 OR IN SECTION 18.04 BELOW2.03, THEREBY ENTITLING MANAGER TO RECEIVE THE TERMINATION FEES AS SET FORTH IN THIS SECTION 2.03 OR IN SECTION 18.04 BELOW2.03, MANAGER WOULD SUFFER AN ECONOMIC LOSS BY VIRTUE OF THE RESULTING LOSS OF MANAGEMENT FEES WHICH WOULD OTHERWISE HAVE BEEN EARNED UNDER THIS AGREEMENT. BECAUSE SUCH FEES VARY IN AMOUNT DEPENDING ON THE TOTAL GROSS REVENUES EARNED CAPITAL IMPROVEMENT BUDGET AT THE HOTELS HOTEL AND ACCORDINGLY WOULD BE EXTREMELY DIFFICULT AND IMPRACTICAL TO ASCERTAIN WITH CERTAINTY, THE PARTIES AGREE THAT THE TERMINATION FEES PROVIDED IN THIS SECTION 2.03 AND IN SECTION 18.04 BELOW CONSTITUTE A REASONABLE ESTIMATE OF LIQUIDATED DAMAGES TO MANAGER FOR PURPOSES OF ANY AND ALL LEGAL REQUIREMENTS, AND IT IS AGREED THAT MANAGER SHALL NOT BE ENTITLED TO MAINTAIN A CAUSE OF ACTION AGAINST LESSEE, EXCEPT AS SPECIFICALLY PROVIDED HEREIN, FOR ACTUAL DAMAGES IN EXCESS OF THE TERMINATION FEES IN ANY CONTEXT WHERE THE TERMINATION FEES ARE PROVIDED BY THIS AGREEMENT, AND RECEIPT OF SUCH FEES (TOGETHER WITH ALL OTHER AMOUNTS DUE AND PAYABLE BY LESSEE TO MANAGER WITH RESPECT TO EVENTS OCCURRING PRIOR TO TERMINATION OF THIS AGREEMENT WITH RESPECT TO THE APPLICABLE HOTELS HOTEL OR AS OTHERWISE PROVIDED HEREIN) SHALL BE MANAGER’S SOLE REMEDY FOR DAMAGES AGAINST LESSEE IN ANY SUCH CASE. The foregoing shall in no way affect any other sums due Manager under this Article II or otherwise hereunder, including, without limitation, the Management Fees earned during the Term, or any other rights or remedies, at law or in equity of Manager under this Agreement or under Legal Requirements, including any indemnity obligations of Lessee to Manager under this Agreement.
Appears in 1 contract
Samples: Master Project Management Agreement (Stirling Hotels & Resorts, Inc.)