Package Development Clause Samples
The Package Development clause outlines the responsibilities and procedures related to the creation, assembly, or modification of a product package as part of a contractual agreement. Typically, this clause specifies which party is responsible for designing, sourcing materials, and ensuring the package meets agreed-upon specifications or regulatory requirements. For example, it may require the developer to provide prototypes for approval or to adhere to certain quality standards during production. The core function of this clause is to ensure that both parties have a clear understanding of their roles and expectations in the package development process, thereby minimizing disputes and ensuring the final product meets contractual and commercial needs.
Package Development. ChipPAC shall be Intersil's preferred supplier ------------------- of new package development services; provided that ChipPAC is able to offer price and performance standards for any such new packages that are at least comparable to the price and performance standards offered by third parties. In addition, ChipPAC's development time for new packages must be consistent with Intersil's new product introduction schedules. ChipPAC and Intersil shall conduct quarterly roadmap reviews of future package configurations throughout the Term of this Agreement.
Package Development. Bid packages will be developed in a manner that ensures the best success for the project as well as the DBE Subcontractor or Vendor. Evaluations will be performed on each DBE Sub/Vendor to ensure they are adding value and not outside of their normal course of work. Training and assistance will be offered to those participants that are expanding their presence in a specific market. The following support will be provided by LSC to help ensure success:
(1) Facilitate providing interested DBEs with adequate information about the plans, specifications, and requirements of the contract in a timely manner to assist them in responding to a solicitation with their offer for the subcontract
(2) Ensure that DBEs are not rejected as unqualified without a thorough investigation and sound reasoning
(3) Make efforts to assist interested DBEs in obtaining bonding, lines of credit, or insurance as may be required DocuSign Envelope ID: 05C1F150-2AD5-4643-82AF-864EEA18D456
(4) Make efforts to assist interested DBEs in obtaining necessary equipment, supplies, materials, or related assistance or services
(5) Request DBEs complete a LSC Prequalification Form that will include the following information:
(a) Quality of trade, supplies, and service
(b) Pricing structure
(c) Delivery schedule
(d) Financial stability
(e) Safety record
(f) Insurance/bonding information
(g) Experience
Package Development. EMS shall provide HP with any and all design specification, test and qualification data, and any and all special instructions related to package design and the support thereof, as such information is required by Project Pegasus packaging design and/or manufacturing subcontractor(s). In the event that a change to the package design is required to meet the Specifications contained in Exhibit R, EMS will participate with HP as necessary to both specify and qualify such package design changes.
Package Development. CONSULTANT will prepare drawings and technical specifications for the proposed supplemental carbon storage and feed facilities identified in the technical memorandum. Documents will be prepared in sufficient detail to facilitate competitive bidding. Review meetings will be conducted at 50- and 100-percent completion levels to obtain and implement input from the CITY. At each level of completion CONSULTANT will prepare and submit an EOPCC. A preliminary sheet list is presented below. Process Flow Diagram Erosion Control Yard Piping (1 sheets) Details Structural Notes Existing Concrete Supports Demolition Plan Proposed Concrete Supports Plan and Sections Details Micro-C System Plan Micro-C System Storage Tank Sections Micro-C Metering Pumps Sections Micro-C System 3D Perspective Details Electrical Electrical Notes Electrical Legends Micro-C System Electrical Plan Micro-C System Lighting Protection & Grounding Plan Micro-C System Panel & Conduit Schedules Electrical Details Instrumentation Instrumentation Legends Micro-C System P&ID The CITY intends to upgrade the existing Wastewater Collection System SCADA Control Room.
