Non-Schedule Items Clause Samples

The Non-Schedule Items clause defines how goods, services, or work not originally listed in the contract's schedule are handled. Typically, it outlines the process for identifying, approving, and pricing these additional items, often requiring written agreement or a change order before proceeding. This clause ensures that any extra work or materials outside the initial scope are properly documented and compensated, preventing disputes over unauthorized or unpaid additions.
Non-Schedule Items. 1 Removing of ▇▇▇▇▇ ▇▇▇▇▇▇▇ 2.00 Nos. Each
Non-Schedule Items. 1 Supply and erection of Bi Directional L.T meter (KBK or equavilent) complete in all respect as approved and directed by Engineer incharge. 10.00 No Each 50400.00 504000.00
Non-Schedule Items. 1 S/E of heavy transmission silver conductor DOG 90 m 4-lane laminated with polypropylene random copolymer pipe 35 mm fix with angle iron pole having size high dansity special bolt with (nut double, washers) 6", 4", 2" size 6"'x18", 4 bolt/ pole (vleeti) anti corrision coated type, including his insulator at 3 point PG joint double clamp T-