Non-responsible Contractor. The County may debar a Contractor if the Board of Supervisors finds, in its discretion, that the Contractor has done any of the following: (1) violated a term of a contract with the County or a nonprofit corporation created by the County, (2) committed an act or omission which negatively reflects on the Contractor’s quality, fitness or capacity to perform a contract with the County, any other public entity, or a nonprofit corporation created by the County, or engaged in a pattern or practice which negatively reflects on same, (3) committed an act or offense which indicates a lack of business integrity or business honesty, or (4) made or submitted a false claim against the County or any other public entity.
Appears in 32 contracts
Samples: Contract, Agreement, Executive Management Consultant Services
Non-responsible Contractor. The County may debar a Contractor contractor if the Board of Supervisors finds, in its discretion, that the Contractor contractor has done any of the following: (1) violated a term of a contract with the County or a nonprofit corporation created by the County, (2) committed an act or omission which negatively reflects on the Contractorcontractor’s quality, fitness or capacity to perform a contract with the County, any other public entity, or a nonprofit corporation created by the County, or engaged in a pattern or practice which negatively reflects on same, (3) committed an act or offense which indicates a lack of business integrity or business honesty, or (4) made or submitted a false claim against the County or any other public entity.
Appears in 12 contracts
Samples: Sample RFP Contract, Contract by And, Assignment Agreement
Non-responsible Contractor. The 8.12.3.1 County may debar a Contractor Subrecipient (that is, "Contractor") if the Board of Supervisors finds, in its discretion, that the Contractor has done any of the following: (1) violated a term of a contract with the County or a nonprofit non-profit corporation created by the County, (2) committed an act or omission which negatively reflects on the Contractor’s 's quality, fitness or capacity to perform a contract with the County, any other public entity, or a nonprofit non-profit corporation created by the County, or engaged in a pattern or practice which negatively reflects on same, (3) committed an act or offense which indicates a lack of business integrity or business honesty, or (4) made or submitted a false claim against the County or any other public entity.
Appears in 11 contracts
Samples: wdacs.lacounty.gov, wdacs.lacounty.gov, wdacs.lacounty.gov
Non-responsible Contractor. The County may debar a Contractor if the Board of Supervisors finds, in its discretion, that the Contractor has done any of the following: (1) violated a term of a contract with the County or a nonprofit corporation created by the County, (2) committed an act or omission which negatively reflects on the Contractor’s quality, fitness or capacity to perform a contract with the County, any other public entity, or a nonprofit corporation created by the County, or engaged in a pattern or practice which negatively reflects on same, (3) committed an act or offense which indicates a lack of business integrity or business honesty, or (4) made or submitted a false claim against the County or any other public entity.
Appears in 6 contracts
Samples: Sample Contract, Sample Agreement, Attachment A
Non-responsible Contractor. The 8.12.3.1 County may debar a Contractor if the Board of Supervisors finds, in its discretion, that the Contractor has done any of the following: (1) violated a term of a contract with the County or a nonprofit corporation created by the County, (2) committed an act or omission which negatively reflects on the Contractor’s 's quality, fitness or capacity to perform a contract with the County, any other public entity, or a nonprofit corporation created by the County, or engaged in a pattern or practice which negatively reflects on same, (3) committed an act or offense which indicates a lack of business integrity or business honesty, or (4) made or submitted a false claim against the County or any other public entity.
Appears in 5 contracts
Samples: Appendix a Sample Contract, (Sample Contract, Ifb Sample Contract
Non-responsible Contractor. The County may debar a Contractor if the Board of Supervisors finds, in its discretion, that the Contractor has done any of the following: (1a) violated a term of a contract Master Agreement with the County or a nonprofit corporation created by the County, (2b) committed an act or omission which negatively reflects on the Contractor’s quality, fitness or capacity to perform a contract Master Agreement with the County, any other public entity, or a nonprofit corporation created by the County, or engaged in a pattern or practice which negatively reflects on same, (3c) committed an act or offense which indicates a lack of business integrity or business honesty, or (4d) made or submitted a false claim against the County or any other public entity.
Appears in 4 contracts
Samples: Model Master Agreement, Model Master Agreement, Master Agreement
Non-responsible Contractor. The County may debar a Contractor if the Board of Supervisors finds, in its discretion, that the Contractor has done any of the following: (1) violated a term of a contract agreement with the County or a nonprofit corporation created by the County, (2) committed an act or omission which negatively reflects on the Contractor’s quality, fitness or capacity to perform a contract agreement with the County, any other public entity, or a nonprofit corporation created by the County, or engaged in a pattern or practice which negatively reflects on same, (3) committed an act or offense which indicates a lack of business integrity or business honesty, or (4) made or submitted a false claim against the County or any other public entity.
Appears in 4 contracts
Samples: Agreement, file.lacounty.gov, file.lacounty.gov
Non-responsible Contractor. The County may debar a Contractor if the Board of Supervisors finds, in its discretion, that the Contractor has done any of the following: (1) violated a term of a contract Master Agreement with the County or a nonprofit corporation created by the County, (2) committed an act or omission which negatively reflects on the Contractor’s quality, fitness fitness, or capacity to perform a contract Master Agreement with the County, any other public entity, or a nonprofit corporation created by the County, or engaged in a pattern or practice which negatively reflects on same, (3) committed an act or offense which indicates a lack of business integrity or business honesty, or (4) made or submitted a false claim against the County or any other public entity.
Appears in 4 contracts
Samples: Model Master Agreement, Master Agreement, Master Agreement
Non-responsible Contractor. The County may debar a Contractor if the Board of Supervisors finds, in its discretion, that the Contractor has done any of the following: (1) violated a term of a contract with the County or a nonprofit corporation created by the County, (2) committed an act or omission which negatively reflects on the Contractor’s Contractor‟s quality, fitness or capacity to perform a contract with the County, any other public entity, or a nonprofit corporation created by the County, or engaged in a pattern or practice which negatively reflects on same, (3) committed an act or offense which indicates a lack of business integrity or business honesty, or (4) made or submitted a false claim against the County or any other public entity.
Appears in 4 contracts
Samples: By And, s540406496.onlinehome.us, doingbusiness.lacounty.gov
Non-responsible Contractor. The 8.12.3.1 County may debar a Contractor (that is "Subrecipient") if the Board of Supervisors finds, in its discretion, that the Contractor has done any of the following: (1) violated a term of a contract with the County or a nonprofit non-profit corporation created by the County, (2) committed an act or omission which negatively reflects on the Contractor’s 's quality, fitness or capacity to perform a contract with the County, any other public entity, or a nonprofit non-profit corporation created by the County, or engaged in a pattern or practice which negatively reflects on same, (3) committed an act or offense which indicates a lack of business integrity or business honesty, or (4) made or submitted a false claim against the County or any other public entity.
Appears in 3 contracts
Samples: wdacs.lacounty.gov, wdacs.lacounty.gov, burbank.granicus.com
Non-responsible Contractor. The County may debar a Contractor if the Board of Supervisors finds, in its discretion, that the Contractor has done any of the following: (1) violated a term of a contract Contract with the County or a nonprofit corporation created by the County, (2) committed an act or omission which negatively reflects on the Contractor’s quality, fitness or capacity to perform a contract Contract with the County, any other public entity, or a nonprofit corporation created by the County, or engaged in a pattern or practice which negatively reflects on same, (3) committed an act or offense which indicates a lack of business integrity or business honesty, or (4) made or submitted a false claim against the County or any other public entity.
Appears in 3 contracts
Non-responsible Contractor. The County may debar a Contractor if the Board of Supervisors finds, in its discretion, that the Contractor has done any of the following: (1) violated a term of a contract with the County or a nonprofit corporation created by the County, (2) committed an act or omission which negatively reflects on the Contractor’s quality, fitness or capacity to perform a contract with the County, any other public entity, or a nonprofit corporation created by the County, or engaged in a pattern or practice which negatively reflects on same, (3) committed an act or offense which indicates a lack of business integrity or business honesty, or (4) made or submitted a false claim against the County or any other public entity.
Appears in 3 contracts
Samples: Department of Health Services Agreement, Master Agreement, Agreement by And
Non-responsible Contractor. The County may debar a the Contractor if the Board of Supervisors finds, in its discretion, that the Contractor has done any of the following: (1) violated a term of a contract with the County or a nonprofit corporation created by the County, (; 2) committed an act or omission which negatively reflects on the Contractor’s quality, fitness or capacity to perform a contract with the County, any other public entity, or a nonprofit corporation created by the County, or engaged in a pattern or practice which negatively reflects on same, (; 3) committed an act or offense which indicates a lack of business integrity or business honesty, ; or (4) made or submitted a false claim against the County or any other public entity.. SAMPLE
Appears in 3 contracts
Samples: file.lacounty.gov, file.lacounty.gov, file.lacounty.gov
Non-responsible Contractor. The County may debar a the Contractor if the Board of Supervisors finds, in its discretion, that the Contractor has done any of the following: (1) violated a term of a contract with the County or a nonprofit corporation created by the County, (; 2) committed an act or omission which negatively reflects on the Contractor’s quality, fitness or capacity to perform a contract with the County, any other public entity, or a nonprofit corporation created by the County, or engaged in a pattern or practice which negatively reflects on same, (; 3) committed an act or offense which indicates a lack of business integrity or business honesty, ; or (4) made or submitted a false claim against the County or any other public entity.
Appears in 2 contracts
Samples: file.lacounty.gov, file.lacounty.gov
Non-responsible Contractor. The County may debar a Contractor if the Board of Supervisors finds, in its discretion, that the Contractor has done any of the following: (1i) violated a term of a contract with the County or a nonprofit corporation created by the County, (2ii) committed an act or omission which negatively reflects on the Contractor’s quality, fitness or capacity to perform a contract with the County, any other public entity, or a nonprofit corporation created by the County, or engaged in a pattern or practice which negatively reflects on same, (3iii) committed an act or offense which indicates a lack of business integrity or business honesty, or (4iv) made or submitted a false claim against the County or any other public entity.
Appears in 2 contracts
Samples: file.lacounty.gov, www.criminallegalnews.org
Non-responsible Contractor. The County may debar a Contractor contractor if the Board of Supervisors finds, in its discretion, that the Contractor contractor has done any of the following: (1) violated a term of a contract an agreement with the County or a nonprofit corporation created by the County, (2) committed an act or omission which negatively reflects on the Contractorcontractor’s quality, fitness or capacity to perform a contract an agreement with the County, any other public entity, or a nonprofit corporation created by the County, or engaged in a pattern or practice which negatively reflects on same, (3) committed an act or offense which indicates a lack of business integrity or business honesty, or (4) made or submitted a false claim against the County or any other public entity.
Appears in 2 contracts
Samples: Attachment I, Attachment I
Non-responsible Contractor. The County may debar a Contractor if the Board of Supervisors finds, in its discretion, that the Contractor has done any of the following: (1) violated a term Term of a contract Contract with the County or a nonprofit corporation created by the County, ; (2) committed an act or omission which negatively reflects on the Contractor’s quality, fitness fitness, or capacity to perform a contract with the County, any other public entity, or a nonprofit corporation created by the County, or engaged in a pattern or practice which negatively reflects on same, ; (3) committed an act or offense which indicates a lack of business integrity or business honesty, ; or (4) made or submitted a false claim against the County or any other public entity.
Appears in 2 contracts
Samples: Assignment Agreement, Assignment Agreement
Non-responsible Contractor. The County may debar a Contractor if the County’s Board of Supervisors finds, in its discretion, that the Contractor has done any of the following: (1i) violated a any term of a contract with the County or a nonprofit corporation created by the County, ; (2ii) committed an any act or omission which negatively reflects on the Contractor’s quality, fitness or capacity to perform a contract with the County, any other public entity, entity or a nonprofit corporation created by the County, or engaged in a pattern or practice which negatively reflects on same, ; (3iii) committed an act or offense which indicates a lack of business integrity or business honesty, ; or (4iv) made or submitted a false claim against the County or any other public entity.
Appears in 2 contracts
Samples: Subtask; Subtask, Agreement
Non-responsible Contractor. The County may debar a Contractor if the Board of Supervisors finds, in its discretion, that the Contractor has done any of the following: (1) violated a term of a contract with the County or a nonprofit corporation created by the County, (2) committed an act or omission which negatively reflects on the Contractor’s quality, fitness fitness, or capacity to perform a contract with the County, any other public entity, or a nonprofit corporation created by the County, or engaged in a pattern or practice which negatively reflects on same, (3) committed an act or offense which indicates a lack of business integrity or business honesty, or (4) made or submitted a false claim against the County or any other public entity.
Appears in 2 contracts
Samples: Recommended Master Agreement, Services Commuter Benefit Plan
Non-responsible Contractor. The County may debar a Contractor if the Board of Supervisors finds, in its discretion, that the Contractor has done any of the following: (1) violated a term of a contract Master Agreement with the County or a nonprofit corporation created by the County, (2) committed an act or omission which negatively reflects on the Contractor’s quality, fitness or capacity to perform a contract Master Agreement with the County, any other public entity, or a nonprofit corporation created by the County, or engaged in a pattern or practice which negatively reflects on same, (3) committed an act or offense which indicates a lack of business integrity or business honesty, or (4) made or submitted a false claim against the County or any other public entity.
Appears in 2 contracts
Non-responsible Contractor. The 8.11.3.1 County may debar a Contractor if the Board of Supervisors finds, in its discretion, that the Contractor has done any of the following: (1) violated a term of a contract with the County or a nonprofit non-profit corporation created by the County, (2) committed an act or omission which negatively reflects on the Contractor’s 's quality, fitness or capacity to perform a contract with the County, any other public entity, or a nonprofit non-profit corporation created by the County, or engaged in a pattern or practice which negatively reflects on same, (3) committed an act or offense which indicates a lack of business integrity or business honesty, or (4) made or submitted a false claim against the County or any other public entity.
Appears in 1 contract
Samples: Appendix H
Non-responsible Contractor. The County may debar a Contractor if the Board of Supervisors finds, in its discretion, that the Contractor has done any of the following: (1) violated a term of a contract Contract with the County or a nonprofit corporation created by the County, (2) committed an act or omission which negatively reflects on the Contractor’s quality, fitness or capacity to perform a contract Contract with the County, any other public entity, or a nonprofit corporation created by the County, or engaged in a pattern or practice which negatively reflects on same, (3) committed an act or offense which indicates a lack of business integrity or business honesty, or (4) made or submitted a false claim against the County or any other public entity.
Appears in 1 contract
Non-responsible Contractor. The County or District may debar a Contractor if the Board of Supervisors finds, in its discretion, that the Contractor has done any of the following: (1) violated a term of a contract with the County or a nonprofit corporation created by the County, (2) committed an act or omission which negatively reflects on the Contractor’s quality, fitness or capacity to perform a contract with the County, any other public entity, or a nonprofit corporation created by the County, or engaged in a pattern or practice which negatively reflects on same, (3) committed an act or offense which indicates a lack of business integrity or business honesty, or (4) made or submitted a false claim against the County County, District or any other public entity.
Appears in 1 contract
Samples: Lease Contract
Non-responsible Contractor. The County may debar a Contractor if the Board of Supervisors finds, in its discretion, that the Contractor has done any of the following: (1) violated a term of a contract with the County or a nonprofit corporation created by the County, (2) committed an act or omission which negatively reflects on the Contractor’s quality, fitness or capacity to perform a contract with the CountyDistrict, any other public entity, or a nonprofit corporation created by the CountyDistrict, or engaged in a pattern or practice which negatively reflects on same, (3) committed an act or offense which indicates a lack of business integrity or business honesty, or (4) made or submitted a false claim against the County District or any other public entity.
Appears in 1 contract
Samples: lacounty.info
Non-responsible Contractor. The County may debar a Contractor if the Board of Supervisors finds, in its discretion, that the Contractor has done any of the following: (1) violated a term of a contract with the County or a nonprofit corporation created by the County, (2) committed an act or omission which negatively reflects on the Contractor’s quality, fitness or capacity to perform a contract with the County, any other public entity, or a nonprofit corporation created by the County, or engaged in a pattern or practice which negatively reflects on same, (3) committed an act or offense which indicates a lack of business integrity or business honesty, or (4) made or submitted a false claim against the County or any other public entity.
Appears in 1 contract
Samples: file.lacounty.gov
Non-responsible Contractor. The County may debar a Contractor if the Board of Supervisors finds, in its discretion, that the Contractor has done any of the following: (1a) violated a term of a contract Master Agreement with the County or a nonprofit corporation created by the County, (2b) committed an act or omission which negatively reflects on the Contractor’s quality, fitness fitness, or capacity to perform a contract Master Agreement with the County, any other public entity, or a nonprofit corporation created by the County, or engaged in a pattern or practice which negatively reflects on same, (3c) committed an act or offense which indicates a lack of business integrity or business honesty, or (4d) made or submitted a false claim against the County or any other public entity.
Appears in 1 contract
Samples: Model Master Agreement
Non-responsible Contractor. The County may debar a Contractor if the Board of Supervisors finds, in its discretion, that the Contractor has done any of the following: (1i) violated a material term of a contract with the County or a nonprofit corporation created by the County, (2ii) committed an act or omission which negatively reflects on the Contractor’s quality, fitness or capacity to perform a contract with the County, any other public entity, or a nonprofit corporation created by the County, or engaged in a pattern or practice which negatively reflects on same, (3iii) committed an act or offense which indicates a lack of business integrity or business honesty, or (4iv) made or submitted a false claim against the County or any other public entity.
Appears in 1 contract
Samples: Assignment Agreement
Non-responsible Contractor. The County may debar a Contractor contractor if the Board of Supervisors finds, in its discretion, that the Contractor contractor has done any of the following: (1) violated a term of a contract with the County or a nonprofit corporation created by the County, (2) committed an act or omission which negatively reflects on the Contractorcontractor’s quality, fitness or capacity to perform a contract with the County, any other public entity, or a nonprofit corporation created by the County, or engaged in a pattern or practice which negatively reflects on same, (3) committed an act or offense which indicates a lack of business integrity or business honesty, or (4) made or submitted a false claim against the County or any other public entity.
Appears in 1 contract
Samples: Subcontract Agreement
Non-responsible Contractor. The County may debar a Contractor if the Board of Supervisors finds, in its discretion, that the Contractor has done any of the following: (1) violated a term of a contract Master Agreement with the County or a nonprofit corporation created by the County, (2) committed an act or omission which negatively reflects on the Contractor’s quality, fitness or capacity to perform a contract Master Agreement with the County, any other public entity, or a nonprofit corporation created by the County, or engaged in a pattern or practice which negatively reflects on same, (3) committed an act or offense which indicates a lack of business integrity or business honesty, or (4) made or submitted a false claim against the County or any other public entity.
Appears in 1 contract
Samples: Master Agreement
Non-responsible Contractor. The County may debar a Contractor if the Board of Supervisors finds, in its discretion, that the Contractor has done any of the following: (1) violated a term of a contract with the County or a nonprofit corporation created by the County, (2) committed an act or omission which negatively reflects on the Contractor’s quality, fitness or capacity to perform a contract with the County, any other public entity, or a nonprofit corporation created by the County, or engaged in a pattern or practice which negatively reflects on same, (3) committed an act or offense which indicates a lack of business integrity or business honesty, or (4) made or submitted a false claim against the County District or any other public entity.
Appears in 1 contract
Samples: file.lacounty.gov
Non-responsible Contractor. The County may debar a Contractor if the Board of Supervisors finds, in its discretion, that the Contractor has done any of the following: (1i) violated a material term of a contract with the County or a nonprofit corporation created by the County, (2ii) committed an act or omission which negatively reflects on the Contractor’s quality, fitness fitness, or capacity to perform a contract with the County, any other public entity, or a nonprofit corporation created by the County, or engaged in a pattern or practice which negatively reflects on same, (3iii) committed an act or offense which indicates a lack of business integrity or business honesty, or (4iv) made or submitted a false claim against the County or any other public entity.
Appears in 1 contract
Samples: Assignment Agreement
Non-responsible Contractor. The County may debar a Contractor if the Board of Supervisors finds, in its discretion, that the Contractor has done any of the following: (1) violated a term of a contract with the County or a nonprofit corporation created by the County, (2) committed an act or omission which negatively reflects on the Contractor’s quality, fitness or capacity to perform a contract with the County, any other public entity, or a nonprofit corporation created by the County, or engaged in a pattern or practice which negatively reflects on same, (3) committed an act or offense which indicates a lack of business integrity or business honesty, or (4) made or submitted a false claim against the County or any other public entity.
Appears in 1 contract
Samples: file.lacounty.gov
Non-responsible Contractor. The County may debar a Contractor if the Board of Supervisors finds, in its discretion, that the Contractor has done any of the following: (1) violated a term of a contract Master Agreement with the County or a nonprofit corporation created by the County, (2) committed an act or omission which negatively reflects on the Contractor’s quality, fitness or capacity to perform a contract Master Agreement with the County, any other public entity, or a nonprofit corporation created by the County, or engaged in a pattern or practice which negatively reflects on same, (3) committed an act or offense which indicates a lack of business integrity or business honesty, or (4) made or submitted a false claim against the County or any other public entity.
Appears in 1 contract
Samples: Master Agreement
Non-responsible Contractor. The County may debar a Contractor if the Board of Supervisors finds, in its discretion, that the Contractor has done any of the following: (1) violated a term of a contract with the County or a nonprofit corporation created by the County, (2) committed an act or omission which negatively reflects on the Contractor’s quality, fitness fitness, or capacity to perform a contract with the County, any other public entity, or a nonprofit corporation created by the County, or engaged in a pattern or practice which negatively reflects on the same, (3) committed an act or offense which indicates a lack of business integrity or business honesty, or (4) made or submitted a false claim against the County or any other public entity.
Appears in 1 contract
Samples: Master Agreement
Non-responsible Contractor. The County may debar a Contractor if the County Board of Supervisors finds, in its discretion, that the Contractor has done any of the following: (1) violated a term of a contract with the County or a nonprofit corporation created by the County, (2) committed an act or omission which negatively reflects on the Contractor’s quality, fitness or capacity to perform a contract with the County, any other public entity, or a nonprofit corporation created by the County, or engaged in a pattern or practice which negatively reflects on same, (3) committed an act or offense which indicates a lack of business integrity or business honesty, or (4) made or submitted a false claim against the County or any other public entity.
Appears in 1 contract
Samples: Appendix B Sample Contract
Non-responsible Contractor. The County may debar a Contractor if the Board of Supervisors finds, in its discretion, that the Contractor has done any of the following: (1) violated a term of a contract with the County or a nonprofit corporation created by the County, (2) committed an act or omission which negatively reflects on the Contractor’s quality, fitness or capacity to perform a contract with the County, any other public entity, or a nonprofit corporation created by the County, or engaged in a pattern or practice which negatively reflects on same, (3) committed an act or offense which indicates a lack of business integrity or business honesty, or (4) made or submitted a false claim against the County or any other public entity.
Appears in 1 contract
Samples: Sample Contract
Non-responsible Contractor. The County or District may debar a Contractor if the Board of Supervisors finds, in its discretion, that the Contractor has done any of the following: (1) violated a term of a contract with the County or a nonprofit corporation created by the County, (2) committed an act or omission which negatively reflects on the Contractor’s quality, fitness or capacity to perform a contract with the County, any other public entity, or a nonprofit corporation created by the County, or engaged in a pattern or practice which negatively reflects on same, (3) committed an act or offense which indicates a lack of business integrity or business honesty, or (4) made or submitted a false claim against the County or any other public entity.
Appears in 1 contract
Samples: Armed and Unarmed Security Services
Non-responsible Contractor. The County may debar a Contractor if the County’s Board of Supervisors finds, in its discretion, that the Contractor has done any of the following: (1i) violated a term of a contract with the County or a nonprofit corporation created by the County, (2ii) committed an act or omission which negatively reflects on the Contractor’s quality, fitness or capacity to perform a contract with the County, any other public entity, or a nonprofit corporation created by the County, or engaged in a pattern or practice which negatively reflects on same, (3iii) committed an act or offense which indicates a lack of business integrity or business honesty, or (4iv) made or submitted a false claim against the County or any other public entity.
Appears in 1 contract
Samples: Appendix C Sample Contract
Non-responsible Contractor. The County or District may debar a Contractor if the Board of Supervisors finds, in its discretion, that the Contractor has done any of the following: (1) violated a term of a contract with the County or a nonprofit corporation created by the County, (2) committed an act or omission which negatively reflects on the Contractor’s quality, fitness or capacity to perform a contract with the CountyDistrict, any other public entity, or a nonprofit corporation created by the County, or engaged in a pattern or practice which negatively reflects on same, (3) committed an act or offense which indicates a lack of business integrity or business honesty, or (4) made or submitted a false claim against the County County, or any other public entity.
Appears in 1 contract
Samples: lacounty.info
Non-responsible Contractor. The County may debar a Contractor if the County Board of Supervisors finds, in its discretion, that the Contractor has done any of the following: (1) violated a term of a contract with the County or a nonprofit corporation created by the County, (2) committed an act or omission which negatively reflects on the Contractor’s quality, fitness or capacity to perform a contract with the County, any other public entity, or a nonprofit corporation created by the County, or engaged in a pattern or practice which negatively reflects on same, (3) committed an act or offense which indicates a lack of business integrity or business honesty, or (4) made or submitted a false claim against the County or any other public entity.
Appears in 1 contract
Samples: Contract
Non-responsible Contractor. The County may debar a Contractor if the Board of Supervisors finds, in its discretion, that the Contractor has done any of the following: (1) violated a term of a contract with the County or a nonprofit corporation created by the County, (2) committed an act or omission which negatively reflects on the Contractor’s 's quality, fitness or capacity to perform a contract with the County, any other public entity, or a nonprofit corporation created by the County, or engaged in a pattern or practice which negatively reflects on same, (3) committed an act or offense which indicates a lack of business integrity or business honesty, or (4) made or submitted a false claim against the County or any other public entity.
Appears in 1 contract
Samples: Sample Contract