Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where Freedom has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to Freedom. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for Freedom (e.g. hairpinning): 1. Roll the circuit(s) from the IDLC to any spare copper that exists to the customer premises. 2. Roll the circuit(s) from the IDLC to an existing DLC that is not integrated. 3. If capacity exists, provide "side-door" porting through the switch. 4. If capacity exists, provide "Digital Access Cross Connect System (DACS)- door" porting (if the IDLC routes through a DACS prior to integration into the switch). 2.6.2 Arrangements 3 and 4 above require the use of a designed circuit. Therefore, non- designed Loops such as the SL1 voice grade and UCL-ND may not be ordered in these cases. 2.6.3 If no alternate facility is available, and upon request from Freedom, and if agreed to by both Parties, BellSouth may utilize its Special Construction (SC) process to determine the additional costs required to provision facilities. Freedom will then have the option of paying the one-time SC rates to place the Loop.
Innovative Unit Scheduling Schedules other than those included in Articles 13.01 and 13.02 may be developed in order to improve quality of working life, support continuity of patient care, ensure adequate staffing resources, and support cost-efficiency. The parties agree that such innovative schedules may be determined locally by the Hospital and the Union subject to the following principles: (a) Such schedules shall be established by mutual agreement of the Hospital and the Union; (b) These schedules may pertain to full-time and/or part-time nurses; (c) The introduction of such schedules and trial periods, if any, shall be determined by the local parties and recorded in the Appendix of Local Provisions. Such schedules may be discontinued by either party with notice as determined within the Appendix of Local Provisions; (d) Upon written agreement of the Hospital and the Union, the parties may agree to amend collective agreement provisions to accommodate any innovative unit schedules.
Additional G-Cloud services 30.1 The Buyer may require the Supplier to provide Additional Services. The Buyer doesn’t have to buy any Additional Services from the Supplier and can buy services that are the same as or similar to the Additional Services from any third party. 30.2 If reasonably requested to do so by the Buyer in the Order Form, the Supplier must provide and monitor performance of the Additional Services using an Implementation Plan.
Compressed Work Week The Company and Union recognize the concept of the compressed work week. It is further understood that the compressed work week conditions will apply only to those departments that are on the compressed work week.
Connecting Transmission Owner’s Scope of Work and Responsibilities The Connecting Transmission Owner will design, construct, own, operate and maintain all Connecting Transmission Owner’s Interconnection Facilities, except as otherwise stated above and in the Project Specific Specifications. The Connecting Transmission Owner will complete all engineering reviews, field verifications and witness testing, etc. in accordance with the ESBs and the Project Specific Specifications. Connecting Transmission Owner shall provide the revenue metering CT/PT units and meter socket enclosure. The Connecting Transmission Owner shall: • provide, run, and wire both ends of the color-coded cable for the revenue metering instrument transformer secondary wiring; • perform all terminations; and • supply and install the meter. The revenue meter may require a communications link to the RTU. The Connecting Transmission Owner will specify and run those communications cables. The Connecting Transmission Owner shall complete all wiring, testing and commissioning of the RTU.