Major Interlocks Sample Clauses

Major Interlocks. The major generator and transformer electrical equipment interlocks include: The generator breaker cannot be closed unless the excitation system breaker is closed. The excitation system breaker cannot be tripped by control switch unless the generator breaker is open. When both main power transformer high side breakers are open, neither can be closed unless its respective generator breaker is open. When only one main power transformer breaker is closed it cannot be opened until its respective generator breaker is opened.
AutoNDA by SimpleDocs

Related to Major Interlocks

  • Emergency Repairs a) The landlord must post and maintain in a conspicuous place on the residential property, or give to the tenant in writing, the name and telephone number of the designated contact person for emergency repairs.

  • Traffic Measurement and Billing over Interconnection Trunks 6.1 For billing purposes, each Party shall pass Calling Party Number (CPN) information on at least ninety-five percent (95%) of calls carried over the Interconnection Trunks.

  • Upon Substantial Completion of the Work or designated portion thereof and upon application by the Contractor and certification by the Architect, the State shall make payment, reflecting adjustment in retainage, if any, for such Work or portion thereof, as provided in the Contract Documents.

  • Emergency Replacement SAP may replace a Subprocessor without advance notice where the reason for the change is outside of SAP’s reasonable control and prompt replacement is required for security or other urgent reasons. In this case, SAP will inform Customer of the replacement Subprocessor as soon as possible following its appointment. Section 6.3 applies accordingly.

  • Physical Access Control Unauthorized persons are prevented from gaining physical access to premises, buildings or rooms where data processing systems that process and/or use Personal Data are located.

  • Upon completion of the Project the Recipient shall make a full and complete accounting to the OPWC of the Eligible Project Cost.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Temperature Measurement Temperature will be measured by the nearest automatic Melbourne Bureau of Meteorology Monitoring Station for example (but not limited to): Melbourne, Moorabbin, Dunns Hill, Melbourne Airport, Frankston, and Point Xxxxxx. At the commencement of each project, the onsite management and employee representatives shall agree which is to be the applicable automatic weather monitoring station.

  • Access Control Supplier will maintain an appropriate access control policy that is designed to restrict access to Accenture Data and Supplier assets to authorized Personnel. Supplier will require that all accounts have complex passwords that contain letters, numbers, and special characters, be changed at least every 90 days, and have a minimum length of 8 characters.

  • At Substantial Completion and Final Completion the Contractor shall provide a certification letter certifying that the Work does not contain asbestos as required by the UTUGCs.

Time is Money Join Law Insider Premium to draft better contracts faster.