Loading Analysis Sample Clauses
Loading Analysis. The determination of whether or not a Site or a Tower require any structural enhancements in order to accommodate Indosat’s proposed installation of Equipment or relocation, replacement or modification of its Installed Equipment pursuant to Sections 5.1, 5.2, 5.3, 5.5, 5.6 or 5.7, shall be based on a Loading Analysis prepared by a certified structural engineer. Within three (3) business days of (i) Owner’s receipt of an Equipment Installation Plan where the Loading Feasibility Test shows that the New Tower Loading is greater than the Original Tower Loading (ii) a determination by an independent engineer in accordance with Section 11.1(g) that the New Tower Loading is greater than the Original Tower Loading, or (iii) a request for structural enhancement delivered to Owner under Section 11.5(c), Owner shall submit to Indosat the name of a certified structural engineer that it reasonably believes can complete the Loading Analysis within twenty (20) business days, unless more than five (5) Loading Analyses are being conducted under this Section 11.2(a) at such time, in which case Owner will use its reasonable efforts to propose a certified structural engineer that can complete the Loading Analysis as soon as reasonably practicable. Indosat shall approve or object to such certified structural engineer within five (5) business days. If Indosat objects to such certified structural engineer, Owner shall propose another structural engineer for Indosat’s written approval, and failing such approval, the structural engineer shall not be appointed until both parties agree on a certified structural engineer to perform the Loading Analysis. Owner shall provide the certified structural engineer with the information necessary to conduct the Loading Analysis as soon as reasonably practicable after its appointment, and Owner shall be deemed to represent and warrant that such information is complete and accurate in all material respects (such representation and warranty, the “Loading Analysis Representation”), provided that Owner shall be entitled to rely on, and its deemed representation and warranty shall not apply with respect to, as-built drawings provided by Indosat to Owner for the relevant Tower in connection with the sale of Indosat Sites to Owner under the Asset Purchase Agreement except where Owner has subsequently prepared or updated as-built drawings for such Tower, or is otherwise aware of any inaccuracies in such as-built drawings, in which case Owner shall be d...
