Linings Sample Clauses
The 'Linings' clause defines the requirements and standards for the materials used as linings in a construction or manufacturing project. It typically specifies the type, quality, and installation methods for linings, such as those used in walls, floors, or pipes, and may reference industry standards or project specifications. By clearly outlining these expectations, the clause ensures that the finished product meets durability, safety, and performance criteria, thereby preventing disputes over material quality and workmanship.
Linings. All ductile iron pipes being provided by the Employer shall have cement mortar lining in accordance with IS: 8329 ANNEX B (Clause 16.3).
Linings. Lessee shall be responsible for the maintenance and replacement of interior lining during the term of this agreement, and at Lessor's sole option, Lessee shall either repair, replace or remove such lining at Lessee's expense at the termination of this agreement.
Linings. There are no linings to above retail areas and concrete panels. Exterior linings are colour steel sheet members as depicted by the plans and other materials as called for and restricted by the Resource Consent.
Linings. The School Bus must have a metal roof which is insulated or lined with a suitable material (as specified in the ADRs).
