Land Owner. Interconnection Point [The outlet flange of the isolation valve designated HV-XXXXX on [ ] Flowsheet - Piping & Instrument Diagram number [XXXXXX-AAAA-NNN-TT]] Odorisation Status of First Gas’ Pipeline Odorised / Non-odorised Odorisation Fee (if any) $[ ] per Day schedule two: technical requirements The design, construction, commissioning, operation and maintenance of each Receipt Point (including any First Gas Equipment) shall conform with good gas industry engineering practice and shall comply with the requirements of recognised and applicable standards as well as all current and relevant laws, including: AS 2885.1: 2007 Pipelines - Gas and Liquid Petroleum, Part 1: Design and Construction; Gas ▇▇▇ ▇▇▇▇ and associated regulations; Health and Safety at Work ▇▇▇ ▇▇▇▇; Health and Safety in Employment (Pipelines) Regulations; Resource Management ▇▇▇ ▇▇▇▇; Electrical (Safety) Regulations; AS/NZS 3000 – Wiring Rules; AS/NZS 60079.14 - Explosive Atmospheres: Electrical Installations, Design Selection and Erection; and mandatory Codes of Practice and Standards associated with any of the above. A Receipt Point must incorporate: appropriate security fencing to reasonably prevent unauthorised access; adequate means of access and egress for vehicles and personnel; adequate space to accommodate and permit the safe operation and maintenance of all equipment and structures; Metering; clear signs indicating restricted access and Hazardous areas, supplemented by secure barriers where required; only electrical equipment that complies with the NZ Electricity Act and Regulations; an above-ground isolation valve (specified by First Gas) to allow First Gas to securely and safely isolate its Pipeline from the Interconnected Party’s Pipeline; suitable bonding of above-ground piping and associated metallic structures to ensure the electrical continuity of such piping and structures, and a suitable earth bed to which such piping and structures are connected; means to electrically isolate First Gas’ Pipeline from a Receipt Point, as well as a suitable surge diverter installed across each such isolating device; equipment to reasonably prevent any solid or liquid contaminants from reaching First Gas’ Pipeline;
Appears in 1 contract
Sources: Interconnection Agreement
Land Owner. Interconnection Point [The outlet flange of the isolation valve designated HV-XXXXX on [ ] Flowsheet - Piping & Instrument Diagram number [XXXXXX-AAAA-NNN-TT]] Odorisation Status of First Gas’ Pipeline Odorised / Non-odorised Odorisation Fee (if any) $[ ] per Day schedule two: technical requirements The design, construction, commissioning, operation and maintenance of each a Receipt Point (including any First Gas each Party’s Equipment) shall conform with good gas industry engineering practice and shall comply with the requirements of recognised and applicable standards as well as all current and relevant lawslegislation (including applicable regulations and rules under any enactment), includingincluding but not limited to: AS 2885.1: 2007 Pipelines - Gas and Liquid Petroleum, Part 1: Design and Construction; Gas ▇▇▇ ▇▇▇▇ and associated regulations; Health and Safety at Work ▇▇▇ ▇▇▇▇; Health and Safety in Employment (Pipelines) Regulations; Resource Management ▇▇▇ ▇▇▇▇; Electrical (Safety) Regulations; AS/NZS 3000 – Wiring Rules; AS/NZS 60079.14 - Explosive Atmospheres: Electrical Installations, Design Selection and Erection; and mandatory Codes of Practice and Standards associated with any of the above. A Receipt Point must incorporate: appropriate security fencing to reasonably prevent unauthorised access; adequate means of access and egress for vehicles and personnel; adequate space to accommodate and permit the safe operation and maintenance of all equipment Equipment and structures; Metering; clear signs indicating restricted access and Hazardous areas, supplemented by secure barriers where required; only electrical equipment that complies with the NZ Electricity Act and Regulations; an above-ground isolation valve (specified by First Gas) to allow First Gas to securely and safely isolate its Pipeline from the Interconnected Party’s Pipeline; suitable bonding of above-ground piping and associated metallic structures to ensure the electrical continuity of such piping and structures, and a suitable earth bed to which such piping and structures are connected; means to electrically isolate First Gas’ Pipeline from a Receipt Point, as well as a suitable surge diverter installed across each such isolating device; equipment to reasonably prevent any solid or liquid contaminants from reaching First Gas’ Pipeline;
Appears in 1 contract
Sources: Interconnection Agreement
Land Owner. Interconnection Point [The outlet flange of the isolation valve designated HV-XXXXX on [ ] Flowsheet - Piping & Instrument Diagram number [XXXXXX-AAAA-NNN-TT]] Odorisation Status of First Gas’ Pipeline Odorised / Non-odorised Odorisation Fee (if any) $[ ] per Day schedule two: technical requirements The design, construction, commissioning, operation and maintenance of each aeach Receipt Point (including any each Party’sany First Gas Equipment) shall conform with good gas industry engineering practice and shall comply with the requirements of recognised and applicable standards as well as all current and relevant legislation (including applicable regulations and rules under any enactment), including but not limited to:laws, including: AS 2885.1: 2007 Pipelines - Gas and Liquid Petroleum, Part 1: Design and Construction; Gas ▇▇▇ ▇▇▇▇ and associated regulations; Health and Safety at Work ▇▇▇ ▇▇▇▇; Health and Safety in Employment (Pipelines) Regulations; Resource Management ▇▇▇ ▇▇▇▇; Electrical (Safety) Regulations; AS/NZS 3000 – Wiring Rules; AS/NZS 60079.14 - Explosive Atmospheres: Electrical Installations, Design Selection and Erection; and mandatory Codes of Practice and Standards associated with any of the above. A Receipt Point must incorporate: appropriate security fencing to reasonably prevent unauthorised access; adequate means of access and egress for vehicles and personnel; adequate space to accommodate and permit the safe operation and maintenance of all equipment Equipmentequipment and structures; Metering; clear signs indicating restricted access and Hazardous areas, supplemented by secure barriers where required; only electrical equipment that complies with the NZ Electricity Act and Regulations; an above-ground isolation valve (specified by First Gas) to allow First Gas to securely and safely isolate its Pipeline from the Interconnected Party’s Pipeline; suitable bonding of above-ground piping and associated metallic structures to ensure the electrical continuity of such piping and structures, and a suitable earth bed to which such piping and structures are connected; means to electrically isolate First Gas’ Pipeline from a Receipt Point, as well as a suitable surge diverter installed across each such isolating device; equipment to reasonably prevent any solid or liquid contaminants from reaching First Gas’ Pipeline;
Appears in 1 contract
Sources: Interconnection Agreement