Land Drained Sample Clauses

Land Drained. Land drained by farm drainage tile or farm ditch systems unless an alternate drainage improvement is planned to serve the area.
AutoNDA by SimpleDocs

Related to Land Drained

  • Land The real property described in Exhibit A attached hereto and made a part hereof (the “Land”);

  • Porcupine Site Highway 11

  • Irrigation The City shall provide water to the Premises for the purpose of irrigating the facility. The City specifically reserves the right to restrict water usage under this Agreement if water restrictions are placed on other water users within the City. Prior to the start of the season, City will provide charge up and run through the automatic irrigation systems to check for proper operation. City will provide Lessee with a radio for remote operation of the irrigation system, which Lessee shall use for the day to day maintenance, repair, and monitoring of the irrigation system. If the radio is lost, stolen, broken, or is rendered unusable, Lessee shall pay $1500 for the replacement radio. City is responsible for the maintenance and repair of the following irrigation elements, to the extent applicable: curb stops, backflow prevention devices, backflow enclosures, main line pipings, electric control valves, and controllers. Lessee shall notify Parks Division Water managers by email if any of these irrigation elements are malfunctioning or broken.

  • Sanitary Sewer Provide a standard bubble map, as part of the plans, showing locations of numbered points, and a table with point number, northing and easting coordinates, description, and BL station for each point, for the following: ▪ all possible control as established or attained during preliminary survey, including but not limited to – section corners, property irons, intersection center-center irons, other set monuments ▪ benchmarks, including TBM set with preliminary survey ▪ center of manholes ▪ end of manhole stubs (when longer than five feet)

  • Surface  Grade and shape the road surface, turnouts, and shoulders to the original shape on the TYPICAL SECTION SHEET. Inslope or outslope as directed to provide a smooth, rut-free traveled surface and maintain surface water runoff in an even, unconcentrated manner.  Blading shall not undercut the backslope or cut into geotextile fabric on the road.  If required by the Contract Administrator, water shall be applied as necessary to control dust and retain fine surface rock.  Surface material shall not be bladed off the roadway. Replace surface material when lost or worn away, or as directed by the Contract Administrator.  Remove shoulder berms, created by grading, to facilitate drainage, except as marked or directed by the Contract Administrator.  For roads with geotextile fabric: spread surface aggregate to fill in soft spots and wheel ruts (barrel spread) to prevent damage to the geotextile fabric.

  • Irrigation Systems The Project Area either has no irrigation system or a low-volume drip irrigation system. If a watering system is used, it is a drip irrigation system equipped with a filter, pressure regulator and emitters rated at twenty (20) gallons per hour (gph) or less. The system is maintained free of leaks and malfunctions. No spray irrigation is applied to the Project Area, including spray from irrigation systems adjacent to the Project Area.

  • Drainage ▪ Prevent silt bearing road surface and ditch runoff from delivering sediment to any streams or wetlands. ▪ Maintain rolling dips and drivable waterbars as needed to keep them functioning as intended. ▪ Maintain headwalls to the road shoulder level with material that will resist erosion. ▪ Maintain energy dissipaters at culvert outlets with non-erodible material or rock. ▪ Keep ditches, culverts, and other drainage structures clear of obstructions and functioning as intended. ▪ Inspect and clean culverts at least monthly, with additional inspections during storms and periods of high runoff. This shall be done even during periods of inactivity. Preventative Maintenance ▪ Perform preventative maintenance work to safeguard against storm damage, such as blading to ensure correct runoff, ditch and culvert cleaning, and waterbar maintenance.

  • Platby In consideration for the services rendered by the Institute, in the Study, the Sponsor agrees to pay to the Institute according to the Budget, attached as Exhibit B hereto (the “Fee”). Jako protiplnění za služby poskytnuté Zdravotnickým zařízením při provádění Studie se Zadavatel zavazuje hradit Zdravotnickému zařízení platby podle Rozpočtu, který je ke Smlouvě přiložen jako Příloha B („Poplatek“). The Fee shall be payable for each eligible Subject properly enrolled according to the Protocol upon proper completion and delivery to the Sponsor of the Case Report Forms (the “CRF”) for each Subject. The Fees, plus VAT calculated in the legal amount, shall be the full remuneration and payment by Sponsor for all costs incurred in the course of the clinical Study. Any and all taxes or other registration charges shall be borne by the Institute. Poplatek bude splatný za každého způsobilého Účastníka, který je zařazen do Studie podle Protokolu, po řádném vyplnění a doručení Zadavateli záznamových formulářů („CRF“) za každého Účastníka. Poplatky navýšené o DPH vypočítanou v zákonné výši budou úplnou odměnou a platbou Zadavatele za všechny náklady, které vzniknou v průběhu klinické Studie. Náklady na veškeré daně nebo jiné registrační poplatky ponese Zdravotnické zařízení. The Institute will recruit a maximum of 300 Subjects into the Study. The Sponsor will not pay Fees, reimburse any expense, charge, cost, nor bear any liability to the Institute, nor to any other person or entity, in respect of any Subject in excess of the maximum number of Subjects specified in the previous sentence. Zdravotnické zařízení do Studie získá maximálně 300 Účastníků. Zadavatel nezaplatí Poplatky, neuhradí žádný výdaj, poplatek ani náklad ani neponese žádnou odpovědnost vůči Zdravotnickému zařízení ani vůči jakékoliv jiné osobě nebo subjektu, pokud jde o jakéhokoliv Účastníka nad rámec maximálního počtu Účastníků specifikovaného v předchozí větě. Fees due will be transferred by the Sponsor upon provision of a respective invoice to the following account of the Institute: Splatné Poplatky Zadavatel převede po poskytnutí příslušné faktury na následující účet Zdravotnického zařízení:

  • MAINTENANCE OF THE BUILDING /APARTMENT / PROJECT The Promoter shall be responsible to provide and maintain essential services in the Project till the taking over of the maintenance of the project by the Association upon the issuance of the completion certificate of the Project. The cost of such maintenance has been included in the Total Extras and Deposits as mentioned in clause 1.2.

  • Groundwater The groundwater shall not be degraded as a result of the waste maintained at the facility.

Time is Money Join Law Insider Premium to draft better contracts faster.