IDF Network Switches Sample Clauses

IDF Network Switches. Contractor must provide additional switches or replace existing CDCR switches for CTS connectivity if the number of available ports is less than 20% after CTS requirements are taken into account. The Contractor will provide CDCR a 48-port switch to replace an existing 24-port switch if the number of available ports is below 20%. In the case where the existing CDCR switch is a 48-port switch and the number of available ports is below 20%, the Contractor shall provide CDCR a second, third or fourth 48-port switch (stacked) as required to maintain at least 20% port availability based on the stacked switch port count. All switches shall be provided at no cost to the State and will be managed and become property of CDCR. The Contractor must provision a maintenance and service plan for the duration of the contract and transfer ownership to CDCR. The IDF switches must be the make and model as specified by CDCR. Refer to Attachment 9: CDCR Network Equipment Specifications sheet.