Hardware Description Sample Clauses

Hardware Description. [Embed network requirements, Disaster Recovery solution, an information technology security assessment, etc. or provide a location where this content is stored.]
Hardware Description. The AuthentiDate central server runs behind [ * * * * ]. [ * * * * ] do load balancing. Three of the four [ * * * * ] ([ * * * * ] database) run on redundant [ * * * * ] equipment, while the [ * * * * ] runs on dedicated [ * * * * ] devices provided by the vendor. Storage is provided via [ * * * * ]array and a [ * * * * ] backup device implements tape backup. There are also several utility servers running [ * * * * ] for monitoring, messaging and remote management. The baseline hardware configuration has been provided in the technical due diligence documentation provided to USPS previously. Authentidate will provide updated hardware configuration documentation to USPS within 30 days of change. [ * Certain information on this page has been omitted and filed separately with the Commission. Confidential treatment has been requested with respect to the omitted portions.]
Hardware Description. The Contactor shall provide the necessary FBCB2 BFT production hardware needed to support continued fielding and operations of FBCB2 BFT over the contract period of performance, on an Indefinite Delivery, Indefinite Quantity (ID/IQ) basis. The Contractor shall also provide the necessary FBCB2 developmental units needed to support enhanced capabilities for FBCB2 BFT, when required in a particular delivery order. The hardware requirement shall include specified quantities of Comtech Model MT-2011F L-Band Transceivers, variants of the MT-2012F Mobile Terminals, the AVX-06-ECS and MT-2011-202 Airborne Terminals / airborne transceivers, packet switch equipment, Very Small Aperture Terminals (VSAT) terminals and equipment, Field Service Station (FSS) Workstation, and any other applicable equipment used in the FBCB2 BFT communications network. All data sent between the platform terminal and the Network Packet Switch must be encrypted. The quantities, delivery schedules, acceptance criteria, delivery address, etc. for this equipment shall be as defined in each applicable delivery order. Each delivery order that stipulates the need for hardware will state the quantity of production units or developmental models required.
Hardware Description. The DISK SLED consists of [**]. The DISK SLEDs [**]. In general, all NEI parts have the format www-xxxxx-yy rev zz where each w, x, y, or z is an alphanumeric character. Their revisions start at 0A for a released product and will increase to 0B, 0C, 0D, ... as new revisions are required. The NEI assembly number for the DISK SLED is [**]. The following sections define the exact components comprising the DISK SLED. The EMC part number for the assembly is [**]. NEI will label the disk sled assembly with the EMC part number, revision, and serial number in both bar code and human readable form according to the 108000721 EMC Serial Number Labeling Requirements Specification. These labels are not required to be visually accessible when the DISK SLED is installed [**].
Hardware Description. 4 4.1 Disk Drives.......................................................4 4.2 Metal Sleds.......................................................4 4.3 Mounting Screws...................................................4

Related to Hardware Description

  • Service Description 2.1 General

  • System Description The wet detention basin is designed to trap 80% of sediment in runoff and maintain pre-development downstream peak flows. The basin has two forebays (smaller ponds) located at the low end of two grass ▇▇▇▇▇▇. In addition to runoff conveyance, the grass ▇▇▇▇▇▇ also allow infiltration and filtering of pollutants, especially from smaller storms. The forebays are each 4 feet deep. They are connected to the main pool by 18 and 24-inch metal pipes that outlet onto a rock chute. The forebays will trap coarse sediments in runoff, such as road sands, thus reducing maintenance of the main basin. The main pool will trap the finer suspended sediment. To do this, the pond size, water level and outlet structures must be maintained as specified in this Agreement (see Figures 1, 2 and 3). The main basin receives runoff from a 67.1 acre drainage area (41.2 acres within the subdivision and 25.9 acres off- site drainage coming from the east). During high rainfall or snow melt events, the water level will temporarily rise and slowly drain down to the elevation of the control structure. The water level is controlled by a 12-inch concrete pipe extending through the berm in the northwest corner of the basin (see Figures 1 and 3). On the face of the 12- inch pipe, there is metal plate with a 3-inch drilled hole (orifice) with stone in front of it. This orifice controls the water level and causes the pond to temporarily rise during runoff events. Washed stone (1-2” diameter) is placed in front of the orifice to prevent clogging. High flows may enter the grated concrete riser or flow over the rock lined emergency spillway. “As-built” construction drawings of the basin, showing actual dimensions, elevations, outlet structures, etc. will be recorded as an addendum(s) to this agreement within 60 days after Waukesha County accepts verification of construction from the project engineer.

  • Service Descriptions Credit Card processing services: Global Direct’s actions to the appropriate card associations and/or issuers (e.g., Visa, MasterCard, Diners, Discover); settlement; dispute resolution with cardholders’ banks; and transaction-related reporting, statements and products. Debit/ATM Processing Services: Global Direct has connected to the following debit card networks (“Networks”): Accel, AFFN, Interlink, MAC, Maestro, NYCE, Pulse, Star, and Tyme. Global Direct will provide Merchant with the ability to access the Networks that Global Direct has connected to for the purpose of authorizing debit card transactions at the point of sale from cards issued by the members of the respective Networks. Global Direct will provide connection to such Networks, terminal applications, settlement and reporting activities. EBT Transaction Processing Services: Global Direct offers electronic interfaces to Electronic Benefits Transfer (“EBT”) networks for the processing of cash payments or credits to or for the benefit of benefit recipients (“Recipients”). Global Direct will provide settlement and switching services for various Point of Sale transactions initiated through Merchant for the authorization of the issuance of the United States Department of Agriculture, Food and Nutrition Services (“FNS”) food stamp benefits (“FS Benefits”) and/or government delivered cash assistance benefits (“Cash Benefits, ”with FS Benefits, “Benefits”) to Recipients through the use of a state-issued card (“EBT Card”). With respect to Visa and MasterCard products, Merchant agrees to pay and Merchant's account(s) will be charged pursuant to Section 5 of this Agreement for any additional fees incurred as a result of Merchant's subsequent acceptance of transactions with any Visa or MasterCard product that it has not elected to accept.

  • Site Description {Buyer Comment: Provide a legal description of the Site, including the Site map.}

  • Task Description This task includes activities associated with permit-required monitoring conducted in accordance with the conditions specified by state or federal regulatory agencies. All monitoring tasks must be located within or adjacent to the Project area and follow the Department’s Regional Coastal Monitoring Program and FWC's marine turtle and shorebird monitoring programs. Guidance for monitoring of nearshore resources is available in the Department's Standard Operation Procedures For Nearshore Hardbottom Monitoring Of Beach Nourishment Projects. The Local Sponsor must submit work products directly to the appropriate state or federal regulatory agencies in accordance with permit conditions to be eligible for reimbursement under this task, unless otherwise directed.