Grading Plan Sample Clauses

Grading Plan i. Grading for the Project shall be in conformity with a grading plan approved by the Village Engineer.
AutoNDA by SimpleDocs
Grading Plan. The plat shall be graded in accordance with the approved Grading, Drainage and Erosion Control Plan (Plan B). The plan shall conform to City of Plymouth standards. The Developer shall have the responsibility for site grading through completion of the project including installation of sod, trees and required landscaping, as addressed under the Warranty section of this agreement. Within 30 days after completion of the grading, the Developer shall provide the City with a "record" grading plan certified by a registered land surveyor or engineer indicating that all ponds, swales, and ditches have been constructed on public easements or land owned by the City. The "record" plan shall contain site grades and field verified elevations of the following: a) cross sections of ponds; b) location and elevations along all xxxxxx, emergency overflows, wetlands, wetland mitigation areas if any, ditches, locations and dimensions of borrow areas/stockpiles; c) lot corner elevations and house pads; and d) top and bottom of retaining walls. All lots with house footings placed on fill must be monitored and constructed to meet or exceed FHA/HUD 79G specifications. The Developer must certify that this has been done correctly. Prior to City acceptance of the grading improvements and a full release of financial sureties, the Developer shall provide the City with final “record” plans, in accordance with the City’s most recent Engineering Guidelines and the Developer shall verify that all final grades, after house construction and final lot grading, meet the approved grading plan.
Grading Plan. The plat shall be graded in accordance with the approved grading development and erosion control plan. The plan shall conform to City of Arden Hills specifications. Within thirty (30) days after completion of the grading and before the City approves individual building permits the Developer shall provide the City with an "as constructed" grading plan certified by a registered land surveyor or engineer that all ponds, swales, and ditches for public drainage have been constructed on public easements or land owned by the City. Notwithstanding the foregoing, the City may issue building permits to the Developer, prior to completion of all grading, provided the City Engineer has determined that adequate erosion control measures are in place. The "as constructed" plan shall include field verified elevations of the following: a) cross sections of ponds; b) location and elevations along all xxxxxx, wetlands, wetland mitigation areas if any, ditches, locations and dimensions of borrow areas/stockpiles, and installed "conservation area" posts; and c) lot corner elevations. The City will withhold issuance of building permits until the approved certified grading plan is on file with the City and all erosion control measures are in place as determined by the City Engineer.
Grading Plan. 1. The Developer shall submit a Final Grading Plan for approval by the Director. All grading of the Plat and individual lots and outlots shall be graded in conformity with the approved Final Grading Plan.
Grading Plan. The plat shall be graded and drainage provided by the DEVELOP- ER in accordance with the plans attached hereto as Exhibit B.
Grading Plan. Showing proposed finished floor elevations and, as applicable, spot elevations and one-foot contours for public sidewalks, drives, and parking areas. Detailed grading of landscape areas will be coordinated with, but designed by, the Landscape Architect. Retaining walls needed to accomplish the grading will be shown with proposed top and toe elevations in a “wall zone”. The selection of the wall system and the structural design of the walls is beyond the limited scope of this agreement and will be provided by Xxxxxx-Xxxx or others under a separate agreement with the Client.
Grading Plan. Shall show existing and proposed contours at 1 foot intervals.
AutoNDA by SimpleDocs
Grading Plan. Design professional shall update to show the general method of site drainage as affected by each proposed building. Added shall be baseline and benchmark references and elevations of major exterior elements including those for stairways, walls, and terraces.
Grading Plan. Identified as: Proposed ESSO Gas Canopy Development; Project File Number: 18-333; Drawing SG-1; Prepared: April 23, 2019; Last Revised: October 4, 2019; Prepared by: Zoltan Engineering.
Grading Plan. The Site shall be graded in accordance with the approved grading development and erosion control plan, Plan "B". The plan shall conform to City of Arden Hills specifications. Prior to the Developer obtaining a certificate of occupancy, the Developer shall provide the City with an "as constructed" grading plan certified by a registered land surveyor or engineer that all ponds, swales, and storm sewers have been constructed in accordance with the Plans. Notwithstanding the foregoing, the City may issue building permits to the Developer, prior to completion of all grading, provided the City Engineer has determined that adequate erosion control measures are in place. The "as built" site plans shall include field verified elevations of the following: a) cross sections of privately built ponds; and b) location and elevations along all xxxxxx, wetlands, wetland mitigation areas if any, storm sewers, locations and dimensions of borrow areas/stockpiles, and other Improvements as shown on Plan “B”.