Frequency Band Sample Clauses

Frequency Band. The portion of the electromagnetic spectrum within a specified upper- and lower-frequency limit (e.g., C-, Ka-, K-, Ku-, X-band).
AutoNDA by SimpleDocs
Frequency Band. The frequency band and permissible power limits from the base stations are as per details given below. Only available frequency slots in these bands shall be considered for allotment to the Licensee as per NFAP-2002, revised from time to time. 300MHz or 400MHz or 800MHz
Frequency Band. The assigned frequencies between 806-821 MHz are for base receive and between 851-866 MHz for base transmit. Carriers are spaced every 25 kHz in 45 MHz channel pairs. Channels offset by 12.5 kHz are supported.
Frequency Band. 2-2 1.4 Frequency Resolution..................................................2-2 1.5 Polarization Angle Steerability.......................................2-2 1.6 Transmit Cross Polarization Isolation.................................2.3 1.7 Receive Cross Polariztion Isolation...................................2-3 1.8 Maximum Emission Levels Outside Allocated Bandwidth...................2-3 1.9 EIRP Stability and Control............................................2-3 1.10 Earth Station Transmitter Termination.................................2-4 1.11 Uplink Power Limits...................................................2-5 1.12 Antenna Transmit Co-Polarized Sidelobe Pattern........................2-5 1.13 Antenna Transmit Cross-Polarized Sidelobe Pattern.....................2-6 1.14 Antenna Receive Co-Polarized Sidelobe Pattern.........................2-7 1.15 Antenna Receive Cross-Polarized Sidelobe Pattern......................2-8 1.16 Pointing Stability....................................................2-8 1.17 Local Control and Monitoring..........................................2-8 APPENDIX 3: EARTH STATION DESCRIPTION FORMS.................................3-1 APPENDIX 4: SPECIFIC STEPS FOR CUSTOMERS ACCESSING THE ORION SATELLITE SYSTEM..........................................................4-1 -------------------------------------------------------------------------------- Page iii Summary...............................................................4-1 Steps Prior to Access.................................................4-1 Steps to Access the Orion Satellite System............................4-2 EXHIBIT B TRANSPONDER PERFORMANCE SPECIFICATIONS EXHIBIT B ORION ASIA PACIFIC TECHNICAL SPECIFICATION FOR DACOM DTH PAYLOAD
Frequency Band. 4 Article 3. Execution of the Agreement .................................................................................................. 4 Article 4. Procedure for Modifications to the Plan ................................................................................ 5 4.1 Introduction................................................................................................................... 5
Frequency Band. The provisions of the Agreement shall apply to the frequency band 535 to 1 605 kHz allocated to the broadcasting service under Article 8 of the Radio Regulations, Geneva, 1979.

Related to Frequency Band

  • Frequency Your milk must be supplied on a consistent basis throughout the week on either a daily or skip-a-day basis as agreed by you and DFMC, except in emergencies. DFMC has no obligation to collect your milk more frequently than once per day, but may agree to do so from time to time. If, at DFMC’s election, your milk is collected more frequently than you require, no Gate Fees or charges will apply for the additional collections.

  • Generator Subject to the provisions of this Section 29.36, Tenant shall be entitled to install, operate and maintain a generator and any other equipment related thereto, including, without limitation, a fuel system, wiring and shaft space (“Generator”) next to the Building at Tenant’s sole cost and expense (without paying any additional fee or rental to Landlord for the use thereof). Prior to the installation of the Generator, Tenant shall inspect the proposed location to determine a suitable location for the Generator, and Tenant shall submit written plans and specifications relative to the type, size and proposed location (including any proposed screening) of the Generator to Landlord for its review and written approval. Tenant shall be solely responsible for the cost of acquisition, installation, operation, and maintenance of the Generator; and Tenant shall install, maintain and operate the Generator in accordance with all federal, state, and local laws, statutes, ordinances, rules and regulations, including without limitation, obtaining and maintaining any and all permits, approvals and licenses required to install and operate the Generator by any governmental authority having jurisdiction. Landlord and Tenant agree that, upon the expiration of earlier termination of the Lease Term, Tenant shall not be required to remove the Generator, any associated cabling, wiring and screening or other improvements. Tenant shall not be entitled to grant or assign to any third party (other than a permitted assignee of Tenant’s rights under the Lease or a permitted subtenant relative to the Premises (or a portion thereof)) the right to use the Generator without Landlord’s prior written consent (which consent may be granted or withheld in Landlord’s discretion). Upon reasonable advance notice to Tenant (and provided Landlord reasonably coordinates with Tenant and provides an alternate source of backup generator capacity during said transition), Landlord shall be entitled to cause the Generator to be moved to another location near the Building, at Landlord’s cost and expense. Tenant shall pay all personal property taxes on the Generator. Tenant shall also pay any increases in the real property taxes of the Building due to the installation of the Generator within thirty (30) days of receipt of notice from Landlord which includes proof of such increase in taxes. Tenant’s indemnity obligations under Section 5.4.1.5 of the Lease, relating to the use of Hazardous Materials, shall apply to the use and operation of the Generator. Finally, Tenant’s insurance obligations under Section 10.3 of the Lease shall apply to the Generator.

  • Emergency Generator Although Landlord is the owner of emergency generator and related automatic transfer switches serving the Building and the 901 Building (collectively, the “Emergency Generator”), prior to the date of this First Amendment, Tenant, as the sole tenant of the Building and the 901 Building, has been operating and maintaining the Emergency Generator. Tenant shall, on the date that is 1 day after the mutual execution and delivery of this First Amendment by the parties (“EG Transfer Date”), (x) deliver the Emergency Generator to Landlord in good working order with a full tank of diesel (y) assign to, transfer and deliver to Landlord all governmental permits and licenses (to the extent such permits and licenses are assignable), if any, warranties (to the extent assignable), operating and maintenance manuals, records and other documents concerning the Emergency Generator, and (y) terminate any service, maintenance or other contracts maintained by Tenant with respect to the Emergency Generator. Tenant has not been obligated to maintain a wastewater permit in connection with the Emergency Generator. With respect to any permit required for the Emergency Generator, Landlord acknowledges and agrees that Tenant has been in the process of obtaining a generator permit in connection with a Tenant permitting process underway with the Bay Area Air Quality Management District (“BAAQMD”) for the 901 Building, that Tenant will remove the generator from its permit application with BAAQMD, and that Landlord will need to obtain a generator permit from BAAQMD in its own name. To the best of Tenant’s knowledge, Tenant does not have any other permits in connection with the Emergency Generator. To the extent Tenant has current contracts with any vendors for the Emergency Generator, Tenant and Landlord shall reasonably cooperate to assign or terminate such contracts in the manner set forth in Section 14 above regarding utilities. To the extent it is not possible for Tenant to remove the request for a generator permit from its BAAQMD application or to assign or terminate any service maintenance or other contracts within 1 day after the mutual execution and delivery of this First Amendment, Tenant shall not be in default hereunder if Tenant promptly commences efforts to do so and diligently performs until such actions have been completed within a reasonable period after such date. Landlord shall, within 5 days of the EG Transfer Date, as part of Expenses, conduct such testing of the Emergency Generator required, in Landlord’s sole and absolute discretion, to determine whether the Emergency Generator is, in fact, in good working order. If such testing discloses that the Emergency Generator is not in good working order, Landlord shall have the right, at Tenant’s sole cost and expense, to perform any maintenance and/or repairs required to put the Emergency Generator in good working order. Following the EG Transfer Date, Landlord’s sole obligation for either providing emergency generators or providing emergency back-up power to Tenant shall be: (i) to provide emergency generators with not less than the current capacity of the Emergency Generator and Tenant shall be entitled to Tenant’s share of the capacity thereof available for use by all tenants of the Building and the 901 Building, collectively, in accordance with the rentable area of the Premises and the 901 Building and the collective rentable areas of the Building and the 901 Building occupied by such other tenants, (ii) to contract with a third party to maintain the emergency generators (“Emergency Generator Servicer”) as per the manufacturer’s standard maintenance guidelines, and (iii) to obtain and maintain licenses for the emergency generators as required by applicable law. Landlord shall have no obligation to provide Tenant with operational emergency generators or back-up power or to supervise, oversee or confirm that the Emergency Generator Servicer or any other third party maintaining the emergency generators is maintaining the generators as per the manufacturer’s standard guidelines or otherwise. Landlord shall provide to Tenant copies of any reports received by Landlord from the Emergency Generator Servicer regarding its maintenance and repairs of the emergency generators; provided, however, that in no event shall Landlord’s failure to deliver such reports constitute a default by Landlord under the Lease. During any period of replacement, repair or maintenance of the emergency generators when the emergency generators are not operational, including any delays thereto due to the inability to obtain parts or replacement equipment, Landlord shall have no obligation to provide Tenant with an alternative back-up generator or generators or alternative sources of back-up power. Tenant expressly acknowledges and agrees that Landlord does not guaranty that such emergency generators will be operational at all times or that emergency power will be available to the Premises when needed. Landlord shall provide Tenant with not less than five (5) business days’ notice of the scheduled disruption in the operation of the emergency generators. In the case of an emergency, Landlord shall provide Tenant with notice of any emergency disruption as soon as reasonably possible after Landlord becomes aware of the need for such emergency disruption.

  • Frequency of Evaluation 1. Probationary employees shall be evaluated at least once during their probationary period.

  • Bandwidth the amount of data (quantified as “Mbps” or “Gbps”) made available to Customer as specified in a Service Order.

  • Contract Distribution The Employer will provide all current and new employees with a link to the new Agreement. Each department or unit will maintain a paper copy of the contract accessible to all employees.

Time is Money Join Law Insider Premium to draft better contracts faster.