For CPS Clause Samples
For CPS. The Contractor shall be responsible for providing red-lined drawings that capture changes. The red-lined drawings shall be transferred to the COR. A copy of the Red-lines shall be kept in the field until the As-Builds are returned to the Contractor for filing.
