Final Engineering Design Phase Services Sample Clauses
Final Engineering Design Phase Services. The expected work tasks are as follows: Prepare interim submittals of 70% and 95% completion, and include drawings, a specification table of contents, and a construction cost estimate. Applicable design criteria include, in order of priority, (1) City of Orchard design criteria, (2) Texas Commission on Environmental Quality, (3) Fort Bend County Environmental Health Criteria.
(1) 70% Submittal: The 70% submittal shall include the following: • Cover sheet (Fort Bend County name and seal, project name with limits, vicinity and location maps, names of County Judge and Commissioners, signature line for County Engineer, ENGINEER firm name and registration number) • Overall project layout • Plan sheets (1” = 20’ plan scale but printed half-size for a 1” = 40’ scale; all existing and proposed facilities correctly shown in plan and profile) • Storm Water Pollution Prevention Plan • Specification table of contents • Bid form with estimated unit and total costs Three (3) copies of the 70% submittal will be submitted for County review and drawings will be submitted on 11” x 17” sheets.
Final Engineering Design Phase Services. The expected work tasks are as follows: Prepare interim submittals of 70% and 95% completion, and include drawings, a specification table of contents, and a construction cost estimate. Applicable design criteria include, in order of priority, (1) Fort Bend County Drainage Criteria Manual, (2) ▇▇▇▇▇▇ County’s latest standards, (3) Applicable Texas Department of Transportation design criteria (all County-maintained traffic signals, other items as applicable), and (4) the Infrastructure Design Manual (City of Missouri City Department of Public Works and Engineering, current version, used for infrastructure for which design criteria do not exist in the preceding criteria documents).
(1) 70% Submittal: The 70% submittal shall include the following: • Cover sheet (Fort Bend County name and seal, project name with limits, vicinity and location maps, names of County Judge and Commissioners, signature line for County Engineer, ENGINEER firm name and registration number) • Typical cross sections • Overall project layout • Plan View sheets (1” = 50’ plan scale; all existing and proposed facilities correctly shown in plan view • Traffic control plan (phasing and traffic control) • Storm Water Pollution Prevention Plan • Specification table of contents • Bid form with estimated unit and total costs Electronic copies of the 70% submittal will be submitted for review and respond to comments using Bluebeam.
(2) 95% Submittal: The 95% submittal will be considered bid ready but not sealed, and will include all of the 70% requirements plus the following: • General notes sheet • Cross sections (100-foot intervals with earthwork calculations) • Signage and pavement marking plans • Standard construction details • Project manual (bid form, specification table of contents, and special specifications or conditions; contract documents excluded) • Responses to 70% comments Final design efforts will be considered complete once all comments from Fort Bend County, RPS or any affected public agency has been completely addressed. Any comments made before Bid Phase will have to be addressed. All final design efforts will be paid in a single lump-sum fee, to be billed monthly on a percent complete basis.
