Final Cleaning Sample Clauses

Final Cleaning. Before final inspection of the work, the Contractor shall clean all ground occupied by the Contractor in connection with the work of all rubbish, excess materials, temporary structures and equipment, and all parts of the work must be left in a neat and presentable condition to the satisfaction of the Project Manager. However, the Contractor shall not remove any warning and directional signs prior to the formal acceptance by the Project Manager. Full compensation for final cleaning will be included in the prices paid for the various items of work or lump sum bid, as the case may be, and no separate payment will be made therefor.
AutoNDA by SimpleDocs
Final Cleaning. The Contractor expressly undertakes, either directly or through its Subcontractor(s), before final payment, to remove all surplus material, false work, temporary structures, including foundations thereof, and debris of every nature resulting from its operations and to put the site in a neat, orderly condition, to thoroughly clean and leave reasonably dust free all finished surfaces including all equipment, piping, etc., on the interior of all buildings included in the Contract; and to thoroughly clean all glass installed under the Contract including the removal of all paint and mortar splatter and other defacements. If a Contractor fails to clean up at the completion of the Work, the City may do so and charge for costs thereof to the Contractor in accordance with these General Conditions.
Final Cleaning. A. General: Provide final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations.
Final Cleaning. The Tenant is responsible for FULLY cleaning the Demised Premises from top to bottom, inside and out. Tenant agrees not to leave a pile of trash at the street at move out time. Tenant agrees to reimburse Landlord for dump fees for all trash that will not fit into the public waste container(s).
Final Cleaning. Reserved.
Final Cleaning. At the completion of the Work, the Contractor shall remove all waste materials, rubbish, tools, equipment, machinery and surplus materials, and professionally clean all sight- exposed surfaces so that the Work is clean and ready for occupancy. Subsequent to installation of User Agency furniture, telephones, and equipment, the Contractor shall provide such additional cleaning as may be necessary to remove any soil resulting from installation of such furniture, telephones and equipment. The Contractor shall comply with the detailed final cleaning requirements of the Specifications; in the event of any conflict between the Specifications and this Section specifically with respect to cleaning at or after the completion of the Work, the Specifications shall apply.
Final Cleaning. 1 When Work is Substantially Performed, remove surplus products, tools, construction machinery and equipment not required for performance of remaining Work. .2 Remove waste products and debris other than that caused by others, and leave Work clean and suitable for occupancy.
AutoNDA by SimpleDocs
Final Cleaning. A. Perform project clean-up prior to the Final Review:
Final Cleaning. Upon completion of sealant application, remove remaining smears and stains and leave the work in a clean and neat condition.
Final Cleaning. At completion of the work, or when directed by the University, the ESCO shall perform the final cleaning pursuant to the working conditions set forth in Schedule Q. The ESCO is responsible for the cleaning operations of its subcontractors.
Time is Money Join Law Insider Premium to draft better contracts faster.