Common use of Facility Side Clause in Contracts

Facility Side. The electrical equipment between the generators of the Facility and the Point of Isolation including all line work/cabling, voltage transformation, metering, protection, control & isolating equipment as set out in the Interconnection Requirements. If required for interconnection, the BLPC shall, at the cost of the RE Supplier, be responsible for construction and shall assume ownership of the interconnection equipment from the Delivery Point to the Point of Isolation (“Additional Interconnection Equipment”).

Appears in 2 contracts

Sources: Renewable Energy Supplier Agreement, Renewable Energy Supplier Agreement

Facility Side. The electrical equipment between the generators of the Facility and the Point of Isolation including all line work/cabling, voltage transformation, metering, protection, control & isolating equipment as set out in the Interconnection Requirements. If required for interconnection, the BLPC BL&P shall, at the cost of the RE Supplier, be responsible for construction and shall assume ownership of the interconnection equipment from the Delivery Point to the Point of Isolation (“Additional Interconnection Equipment”).

Appears in 1 contract

Sources: Renewable Energy Supplier Agreement