Engineering Acceptance. 1. Party B shall assign enough qualified managing staff to the site, establish a quality and progress assurance system, and make any necessary corrections and adjustments as instructed by Party A and the supervision party.
2. Party B shall carry out the construction as per the related codes and design requirements and instructions from Party A and the supervision party, allow inspection at any time, and make any necessary corrections and adjustments as per the inspection result. Within a reasonable time before the inspection, Party B shall provide to Party A and the supervision party the technical data related to the engineering quality.
3. If portions or subdivisions of the project require subsurface work and such units meet the requirements of Party B, Party B shall inform Party A and the supervision party within twenty-four (24) hours prior to their examination and acceptance and provide the related compliance data. Party B can place the units beneath the surface only after receiving written approval from Party A and the supervision party. During the process of placing the units beneath the surface, any modification by Party B to the portion which has passed the inspection shall be reinspected for acceptance. For the inspection and acceptance of these subsurface projects (foundation acceptance and structure acceptance), the quality supervision station and design unit shall be informed in advance to join the inspection and acceptance. If the subsurface work is not inspected in accordance with the above procedures, Party B shall assume all responsibilities and losses incurred hereof.
4. The inspection and acceptance must be carried out as per the Detailed Rules and Regulations of Acceptance for Partitioned Projects and Subdivisional Works after the construction is completed. Party B shall have the as-built drawing placing the project beneath the surface as per Party A’s requirement.
5. If Party A has any doubts on the construction quality and requests Party B to reassess the construction quality, Party B shall cooperate with Party A. If it is acceptable after the reassessment, the repairing and inspection fee will be borne by Party A and the time limit for the project will be delayed accordingly. If it is not acceptable after the reassessment, the rectification, repairing, and inspection fee shall be borne by Party B and the time limit for the project shall not be delayed.
6. Party B shall submit the construction scheme regarding main processes, and the c...