Drawing Structure Clause Samples

The Drawing Structure clause defines the procedures and requirements for submitting, reviewing, and approving technical drawings related to a project. Typically, it outlines the format, content, and timeline for drawing submissions, as well as the responsibilities of both parties in reviewing and providing feedback or approvals. This clause ensures that all design documentation is handled systematically, reducing the risk of miscommunication and ensuring that construction or manufacturing proceeds according to agreed specifications.
Drawing Structure. All drawings shall be generated using the LGL standard drawing sheet and drawing attributes provided. These attributes must not be altered without the prior written approval of LGL, although Vendors / Consultants may add their own drawing number in a separate title block. Except as otherwise indicated by Specification A002 (for Electrical drawings), project drawing numbers shall be of the form ‘AAAA-B-CCCC where AAAA is a three or four digit facility number defining the appropriate element of the process plant, B is a single character discipline code identifying the engineering discipline associated with the drawing, and CCCC is a four digit, sequential sheet number by facility and discipline. The relevant discipline codes for the MOPU project are identified in Specification A002. Sheet numbers shall be progressively allocated by the Vendor from a batch of sequential numbers issued by LGL. Unless otherwise advised, all sheet numbers for the MOPU project shall be 4 digits long and commence with the number ‘2’.