Drawing Requirements Sample Clauses

Drawing Requirements. The documents prepared during the Construction Documents Phase shall set forth the requirements for construction of the Project to a level of detail that is customary and standard and shall include, but not be limited to:
AutoNDA by SimpleDocs
Drawing Requirements. In addition to providing hard copies, the Consultant shall provide all Drawings in Adobe PDFs and AutoCAD Release 2017 format. AutoCAD drawings shall follow the MEARNG A/E/C Standards package provided by MEARNG Project Manager. Any additions or modifications must be approved by the MEARNG Project Manager. Drawings shall be delivered as stand-alone without X-references. If the Drawing originally had X-references, Bind them using the Insert option and do not explode inserted block.
Drawing Requirements. The following drawing information is required on all plans submitted for Pool Enclosure Permits:
Drawing Requirements. 2.4.1 Drawing sheets shall be trim size 24 x 36 with left binding edge and borders.
Drawing Requirements. The Contractor shall furnish to the Principal, two (2) copies of prints of each drawing and one electronic media drawing file of each drawing, configured according to conditions stipulated in Annex B (Clause 5.6.5.-5.6.7.).
Drawing Requirements. Provide a cover sheet to include at least the symbols list, abbreviations list and list of drawings.  Provide an electrical site plan indicating the following:  Proposed site lightingLocation of the main electrical equipment room  All existing utility and lighting poles  All existing overhead and or underground electrical utilities (power, telephone)  Provide an overall floor plan for each level, showing a proposed power layout with locations of power receptacles. This plan shall also include:  Proposed locations and layouts of all electrical equipment rooms, communications rooms, kitchen and boiler rooms if applicable indicating the location and identification of each piece of equipment including the major normal and emergency electrical service and distribution equipment.  Indicate the major normal and emergency electrical service and distribution equipment.  Provide Room Names and Numbers on all plans.  Show the required power connections to architectural, mechanical, plumbing, and kitchen equipment including disconnects and control devices.  Provide floor plans for each level indicating the new lighting layout in each space. These plans shall also show:  Branch circuit connections to branch panel circuit boards.  All illuminated exit signs  Emergency lighting fixtures and circuits  The method of lighting control for each space  Lighting fixture type designations  Room names and numbers  Foot-candle level designations.  Provide electrical panel schedules including load summary and spare capacity. EXHIBIT K  Notes referenced on these plans shall be shown on the same plan as the reference.  Provide floor plans for each level indicating the locations of all applicable systems that may include fire alarm, PA system, and telecommunications system equipment and devices, and building security system equipment and devices including their interconnections. Indicate the location and identification of each item of control and enunciator panels and equipment, and the building security. The plan shall also include the proposed fire alarm and building security zones.  Provide a detail of the fire alarm graphic enunciator panel faceplate. All notes referenced on these plans shall be shown on the same plan as the reference.  Provide drawings for the main distribution switchboard, panel board, transformer, and lighting fixture schedules and a power system load tabulation schedule.  Provide a power riser diagram showing electrical service entr...
Drawing Requirements. 1. The drawing requirements for the Preliminary Plat are as follows. The Plat shall be drawn to a scale of 100 feet to the inch. The drawing shall be a 24” x 36” sized document. The sheet size should be the same as the Record Plat.
AutoNDA by SimpleDocs
Drawing Requirements. All drawings and diagrams shall be prepared in accordance with the latest applicable American National Standard Institute Drafting Manual, ANSI-Y14. Please note that the metric system of units is standard. Metric units may be accompanied by English units. Each drawing submitted shall have a separate drawing number. When a drawing is revised, revision numbers must be clearly legible and easily distinguishable from the drawing number and should be as close as possible to the title block. A short description of the nature of the revision must be included, and revised areas on the drawing shall be circled and identified with the revision number.
Drawing Requirements. 1. All drawings must be Site specific
Drawing Requirements.  Provide cover sheet with symbols list, notes, and air handling zone designations.  Provide separate drawings showing all floor plans with temperature control zones and panel locations.  Provide room names on all floor plans.  Provide floor plans showing equipment locations, piping, and ductwork. Identify all pieces of equipment, size of piping and ductwork.  Provide mechanical room layouts. . Show approximate locations/tonnage/capacities of mechanical equipment.  Provide air handling zone air balance diagrams, including supply air to room and exhaust air.  Provide coordination of phasing requirements.  Begin equipment schedules and detail sheets.
Time is Money Join Law Insider Premium to draft better contracts faster.