Routes All bus stops and bus routes will be mutually agreed upon prior to the start of the school year. Additional stops will be not be added until approved by SSAS and reviewed for safety and approved by the School Board’s Transportation Department. Route changes, if approved, will require 7 calendar days from the date of request to the date of implementation. Special needs transportation requests must be made a minimum of 14 days prior to the requested date of implementation.
Distance Learning Distance learning is a teaching modality whereby all or the majority of instruction and student interaction occurs via electronic media or equivalent mechanisms with the Faculty and students physically separated from each other. This includes courses that are fully online as well as Live online, hybrid, flipped, computer-based courses, and other alternate delivery methods.
Distance Education 7.13.1 Expanding student access, not increasing productivity or enrollment, shall be the primary determining factor when a decision is made to schedule a distance education course. There will be no reduction in force of faculty (as defined in Article XXIII of this Agreement) as a result of the District’s participation in distance education.
Traineeships 10.1 The minimum rates of pay for Trainees are specified in Schedule A, Part 3, to this Agreement.
Traffic The provisions in this Section apply regardless how the ISP-bound traffic is determined.
Passengers THE CARRIER shall be liable for damages resulting from the death of a Passenger or any bodily injury sustained by a Passenger if the act causing the damages took place on board the aircraft or during boarding or deboarding operations.
Route As set forth in 47 C.F.R. § 51.319(e), a “Route” is a transmission path between one of Verizon's Wire Centers or switches and another of Verizon's Wire Centers or switches. A route between two points (e.g., Wire Center or switch “A” and Wire Center or switch “Z”) may pass through one or more intermediate Wire Centers or switches (e.g., Wire Center or switch “X”). Transmission paths between identical end points (e.g., Wire Center or switch “A” and Wire Center or switch “Z”) are the same “route,” irrespective of whether they pass through the same intermediate Wire Centers or switches, if any.
Overbuilds Sprint will not provide non-discriminatory access to FTTH Loop or FTTC Loop on an unbundled basis when Sprint has deployed a FTTH Loop or FTTC Loop parallel to, or in replacement of, an existing loop facility, except that:
Points 9.6 The points to be assigned to the classification levels under this Agreement shall be: Award Classification Level Recommended Points C14 - C13 - C12 32 C11 64 C10 96 C9 12 additional points above C10 C8 24 additional points above C10 C7 36 additional points above C10 C6 48 additional points above C10 C5 60 additional points above C10 C4 Standards and points to be finalised C3 Standards and points to be finalised C2a Standards and points to be finalised C2b Standards and points to be finalised C1a Standards and points to be finalised C1b Standards and points to be finalised and in accordance with Table 2 in the National Metal and Engineering Competency Standards Implementation Guide. Mixed functions
Physical Distancing 1. The District shall limit occupancy of bathrooms, elevators, locker rooms, staff rooms, offices, warehouses, and conference rooms, and any other shared work or school spaces to provide no less than six (6) feet of distancing. Adjacent bathroom stalls may be used. The District shall post signs with occupancy limits conspicuously at the entrance to each room.