Design Development Plans. Design development plans and specifications (“Design Development Plans”) will be prepared by Redeveloper for the Private Improvements to be constructed by Redeveloper on the Project Site. Such Design Development Plans shall be based upon the Project Schematic Drawings and shall show all the exterior of the Private Improvements to be constructed by Redeveloper as part of the P Street and Canopy Street Project and shall also include a site plan (“Site Plan”) and elevation views of the exterior of the Private Improvements (“Exterior Drawings”) and the construction materials to be used for such exterior walls. The Exterior Drawings shall be submitted to the Historic Preservation Commission and the Urban Design Committee, in accordance with the submittal requirements in Section 4.36.040 of the Lincoln Municipal Code, for their joint review and submittal of their recommendation to the City no later than thirty (30) days following Redeveloper’s submittal of the Exterior Drawings. The Exterior Drawings shall be approved if they are in substantial conformity with the Project Schematic Drawings and this Redevelopment Agreement. In addition, ingress and egress to and from the Project Site from the public streets as shown on the Site Plan shall be subject to City approval based upon Chapter 14.75 of the Lincoln Municipal Code and the City’s Access Management Policy. The Site Plan and the Exterior Drawings shall be submitted to the Mayor for his review and approval, which will not be unreasonably withheld.
Appears in 1 contract
Sources: Redevelopment Agreement
Design Development Plans. Design development plans and specifications (“Design Development Plans”) will be prepared by Redeveloper for the Private Improvements to be constructed by Redeveloper on the Project Site. Prior to the finalization of the New Building’s finished floor elevation and right-of-way elevations, Redeveloper must receive City approval that these grades are in concert and achieve the proper grades. This will require the streetscape elevations to be completed concurrently with the finish floor elevations. Such Design Development Plans shall be based upon the approved Project Schematic Drawings and shall show all the exterior faces of the Private Improvements to be constructed by Redeveloper as part of the P Street TDP Project the construction materials to be used for the exterior walls, elevation views of the exterior faces of the Private Improvements, and Canopy Street Project the attachment of the Skywalk Bridge to the Green 2 Parking Garage (“Exterior Drawings”). The Exterior Drawings shall be submitted to the Mayor for his review and approval, as provided in subsection D below. The Design Development Plan shall also include a site plan (“Site Plan”) and elevation views of the exterior of the Private Improvements (“Exterior Drawings”) and the construction materials to be used for such exterior walls). The Exterior Drawings shall be submitted to the Historic Preservation Commission and the Urban Design Committee, in accordance with the submittal requirements in Section 4.36.040 of the Lincoln Municipal Code, for their joint review and submittal of their recommendation to the City no later than thirty (30) days following Redeveloper’s submittal of the Exterior Drawings. The Exterior Drawings shall be approved if they are in substantial conformity with the Project Schematic Drawings and this Redevelopment Agreement. In addition, ingress Ingress and egress to and from the Project Site from the public streets as shown on the Site Plan shall be subject to City approval based upon Chapter 14.75 of the Lincoln Municipal Code and the City’s Access Management Policy. The Site Plan and the Exterior Drawings shall be submitted to the Mayor for his review and approval, which will not be unreasonably withheld.
Appears in 1 contract
Sources: Redevelopment Agreement