Common use of Description of Large Generating Facility Clause in Contracts

Description of Large Generating Facility. The Generating Facility is an existing gas-fired combustion turbines/combined cycle facility located in the City of Linden, New Jersey on the property within ▇▇▇▇▇▇▇▇ 66’s Bayway Refinery. The Generating Facility is composed of five gas turbine units (GE MS-7001 EA) and associated waste heat recovery steam generators arranged in combined cycle with three admission/extraction steam turbines. The maximum power production capacity is approximately 800 MWs. Description of Point of Interconnection and Point of Ownership Change The large Generating Facility is connected to a substation owned by the Developer and located in Linden, New Jersey. Two 345kV fluid filled pipe type transmission cables connect the Linden substation to the Goethals Substation, owned by the Connecting Transmission Owner and located in New York City. The 345kV transmission cables run from the New Jersey side of the ▇▇▇▇▇▇ Kill to the New York side of the Kill. The Point of Interconnection (“POI”) of the Large Generating Facility is in the ▇▇▇▇▇▇ Kill, at the legal boundary between the State of New Jersey and the State of New York. The POI is also the point of ownership change (“POC”) between the facilities owned by the Developer and facilities owned by the Connecting Transmission Owner.

Appears in 2 contracts

Sources: Interconnection Agreement, Interconnection Agreement

Description of Large Generating Facility. The Generating Facility is an existing gas-fired combustion turbines/combined cycle facility located in the City of Linden, New Jersey on the property within ▇▇▇▇▇▇▇▇ 66’s Bayway Refinery. The Generating Facility is composed of five gas turbine units (GE MS-7001 EA) and associated waste heat recovery steam generators arranged in combined cycle with three admission/extraction steam turbines. The maximum power production capacity is approximately 800 MWs. Description of Point of Interconnection and Point of Ownership Change The large Generating Facility is connected to a substation owned by the Developer and located in Linden, New Jersey. Two 345kV fluid filled pipe type transmission cables connect the Linden substation to the Goethals Substation, owned by the Connecting Transmission Owner and located in New York City. The 345kV transmission cables run from the New Jersey side of the ▇▇▇▇▇▇ Kill ▇▇▇▇ to the New York side of the Kill. The Point of Interconnection (“POI”) of the Large Generating Facility is in the ▇▇▇▇▇▇ Kill, at the legal boundary between the State of New Jersey and the State of New York. The POI is also the point of ownership change (“POC”) between the facilities owned by the Developer and facilities owned by the Connecting Transmission Owner.

Appears in 1 contract

Sources: Interconnection Agreement