DC String Combiner Box Commissioning Clause Samples

DC String Combiner Box Commissioning. All the DC Combiner Boxes are inspected and tested to verify the following: a) Correct number of Modules are wired in each string b) Verification of proper string polarity c) Confirmation that all Modules are functioning properly to the module manufacturer’s specifications d) Confirmation that there are no ground-faults present e) verify that all string fuses are properly sized and fuse holders operate properly f) verify that disconnect switch operates properly g) verify that equipment ground is properly installed h) verify that all conduit is properly installed and sealed i) verify that conduit sleeves have been properly employed in locations where there is ground motion potential j) verify that weep-hole has been installed and meets the enclosure NEMA rating k) Verification that all string feeder cables have been installed to the requirements of the design drawings and all cable testing has been completed. l) Verify that door seal is intact and that door operation is correct, with no bowing or off-center closure, all locking mechanisms are in place, and no surface damage is evident that has not been repaired according to manufacturer’s specifications, No enclosure integrity is compromised. m) verify that UL label (where required) is present and that the equipment voltage class meets the operating voltage class n) for all cables verify that the cable installed meets the voltage class of operation and that the cable meets the conditions where installed including UV exposure, UG/TC installation etc. Exhibit H Testing and Commissioning

Related to DC String Combiner Box Commissioning

  • Synchronization, Commissioning and Commercial Operation 5.1.1 The SPG shall give PGVCL at least thirty (30) days’ advanced preliminary written notice and at least fifteen (15) days’ advanced final written notice, of the date on which it intends to synchronize the Solar Power Project to the Grid System. 5.1.2 Subject to Article 5.1.1, the Power Project may be synchronized by the SPG to the Grid System when it meets all the connection conditions prescribed in applicable Grid Code then in effect and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 5.1.3 The synchronization equipment and all necessary arrangements / equipment including RTU for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the SPG at its generation facility of the Power Project at its own cost. The SPG shall synchronize its system with the Grid System only after the approval of synchronization scheme is granted by the head of the concerned substation/ and checking/verification is made by the concerned authorities of the PGVCL. 5.1.4 The SPG shall immediately after each synchronization/tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. In addition, the SPG will inject in-firm power to grid from time to time to carry out operational/ functional test prior to commercial operation. For avoidance of doubt, it is clarified that Synchronization / Connectivity of the Project with the grid shall not to be considered as Commissioning of the Project. 5.1.5 The SPG shall commission the Project within nine (9) Months from the Date of execution of this PPA. Declaration of COD shall be certified by the commissioning committee. 5.1.6 The Parties agree that for the purpose of commencement of the supply of electricity by SPG to PGVCL, liquidated damages for delay etc., the Scheduled Commissioning Date as defined in this Agreement shall be the relevant date.

  • Statewide HUB Program Statewide Procurement Division Note: In order for State agencies and institutions of higher education (universities) to be credited for utilizing this business as a HUB, they must award payment under the Certificate/VID Number identified above. Agencies, universities and prime contractors are encouraged to verify the company’s HUB certification prior to issuing a notice of award by accessing the Internet (▇▇▇▇▇://▇▇▇▇▇.▇▇▇.▇▇▇▇▇.▇▇.▇▇/tpasscmblsearch/index.jsp) or by contacting

  • Procurement Project not financed with EU Funds The procurement is covered by the Government Procurement Agreement (GPA): yes

  • Proposing Integration Activities in the Planning Submission No integration activity described in section 6.3 may be proposed in a CAPS unless the Funder has consented, in writing, to its inclusion pursuant to the process set out in section 6.3(b).