DATA MANAGEMENT AND PROJECT TRACKING METHODS Sample Clauses

DATA MANAGEMENT AND PROJECT TRACKING METHODS. In our 48 years of solid waste engineering consulting, we have gained tremendous experience that has allowed us to develop effective data management techniques for our projects. You will benefit with our move towards electronic field records books. This approach minimizes transcription errors and reduces the overall cost for construction management. Our trained CQA staff photo-document information during construction and instantly upload it to the Cloud, which guarantees information instantly accessible and viewable to our clients as well as our team. We have standardized templates from a daily field report to meeting minutes (Figure 4). This standardization and the accompanying training we provide our employees allows us to accurately collect the information necessary and communicate it effectively to all parties. SCS is committed to working with Buncombe County to tailor these policies and procedures to ensure consistency in the documentation, reporting, accountability, and management of projects. Our commitment to the project will make certain we are extremely responsive to your needs.
AutoNDA by SimpleDocs

Related to DATA MANAGEMENT AND PROJECT TRACKING METHODS

  • OGS Centralized Contract Modifications OGS, an Authorized User, or the Contractor may suggest modifications to the Centralized Contract or its Appendices. Except as specifically provided herein, modifications to the terms and conditions set forth herein may only be made with mutual written agreement of the Parties. Modifications may take the form of an update or an amendment. “

  • OGS Centralized Contract Terms and Conditions have been renumbered as depicted in the following chart: Current Amended Section Title 4.25 4.26 Severability 4.26 4.27 Entire Agreement

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Modifications and Updates to the Wire Center List and Subsequent Transition Periods 2.1.4.12.1 In the event BellSouth identifies additional wire centers that meet the criteria set forth in Section 2.1.4.5, but that were not included in the Initial Wire Center List, BellSouth shall include such additional wire centers in a carrier notification letter (CNL). Each such list of additional wire centers shall be considered a “Subsequent Wire Center List”.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Service Providing Methodology 1.3.1 Party A and Party B agree that during the term of this Agreement, where necessary, Party B may enter into further service agreements with Party A or any other party designated by Party A, which shall provide the specific contents, manner, personnel, and fees for the specific services.

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • Construction Phase Services 3.1.1 – Basic Construction Services

Time is Money Join Law Insider Premium to draft better contracts faster.