Cooling Water Sample Clauses

Cooling Water. The variable component is based on actual yields and prices of raw water, chemicals and utilities (see Appendix 3). • The Fixed Component, • The User Charge
AutoNDA by SimpleDocs
Cooling Water. Seller shall have no obligation to provide cooling water to Buyer
Cooling Water. Xxxxx shall provide approximately 15,540 gpm of cooling water to the Facility's battery limits. The cooling water typically has the following constituents at 10 cycles of concentration: =================================================================== Characteristics Minimum Normal Maximum ------------------------------------------------------------------- Feed Water pH 7.2 ------------------------------------------------------------------- Temperature (degrees)F 93 93 ------------------------------------------------------------------- Calcium Hardness as CaCO(3) ppm 82 ------------------------------------------------------------------- Magnesium Hardness as CaCO(3) ppm 50 ------------------------------------------------------------------- Total Hardness as CaCO(3) ppm 115 ------------------------------------------------------------------- Sodium as Na ppm 78 ------------------------------------------------------------------- Potassium as K mg/L ------------------------------------------------------------------- Iron as Fe ppm 6.0 ------------------------------------------------------------------- Manganese as Mn mg/L ------------------------------------------------------------------- Copper as Cu ppm 0.23 ------------------------------------------------------------------- Aluminum as Al mg/L ------------------------------------------------------------------- Zinc as Zn mg/L ------------------------------------------------------------------- Ammonia and Ammonium Ion as NH(3) mg/L ------------------------------------------------------------------- Methyl Orange (M) Alkalinity as CaCO(3) ppm 56 ------------------------------------------------------------------- Phenolphahalein (P) Alkalinity as CaCO(3) ppm 0 ------------------------------------------------------------------- Chloride as Cl ppm 295 ------------------------------------------------------------------- Sulfate as SO(4) mg/L ------------------------------------------------------------------- Nitrate as NO(4) mg/L ------------------------------------------------------------------- Orthophosphate as PO(4) ppm 32 ------------------------------------------------------------------- Total Phosphate as P0(4) mg/L ------------------------------------------------------------------- Silica as SiO(2) ppm 88 ------------------------------------------------------------------- Total Dissolved Solids, TDS mg/L ------------------------------------------------------------------- Total Suspended Solids, TSS mg/L ...
Cooling Water. Lessor shall, at no cost to Lessee, supply all cooling water requested by Lessee from time to time, up to 500 gallons per minute (“gpm”) for use at the Leased Premises. Lessor shall also accept the return from Lessee of cooling water. Lessee shall be responsible for all costs associated with constructing and maintaining the interconnection points for the transfer of the cooling water and cooling water return. Such supply interconnection point shall be located at RAC/WAS Pump Station 1 (B-116), and the return interconnection shall be at either the Plant Decant Station #1 or Plant 1 RAS/WAS Pump Station B-51 along the South Access Road.

Related to Cooling Water

  • Heating The Hirer shall ensure that no unauthorised heating appliances shall be used on the premises when open to the public without the consent of the management committee. Portable Liquefied Propane Gas (LPG) heating appliances shall not be used.

  • Drinking Water Adequate arrangement shall be made for the supply of drinking water. If practicable filtered and chlorinated supplies shall be arranged when supplies are from intermittent sources overhead storage tank shall be provided with capacity of five liters a person per day. Where the supply is to be made from a well, it shall conform to the sanitary standard laid down in the report of the Rural Sanitation Committee. The well should be at least 30 meters away from any latrine or other source of population. If possible, hand pump should be installed for drinking water from well. The well should be effectively disinfected once every month and the quality of water should be got tested at the public Health Institution between each work of disinfecting.

  • Heating, Ventilating and Air Conditioning General Office Area: The building shall be equipped with a combination heating, ventilation and air conditioning system. The system shall have ducted supply and return air. The space above the ceiling shall not be used as a supply or return plenum. The systems shall be sized in accordance with the weather conditions identified in Chapter 13, “Energy Conservation” of the 1996 BOCA Building Code and supplemented by the “Building Code Rules”. All HVAC equipment shall be commercial or light industrial grade. If new construction it shall be installed at grade or within mechanical rooms for easy access and maintenance. If existing construction, roof mounted equipment will be considered after all other options have been exhausted, including the elimination of noise and vibration transfer to the structural members. The HVAC systems shall be zoned, with units sized and placed as required by heating and cooling loads on the building. Zoning of systems is dependent on the size, shape and orientation of the building. The HVAC system shall be divided into a minimum of 4 exterior and 1 interior temperature control zones. Return air shall be taken from the area supplied or adjacent to the area in the same temperature control zone. The ventilation and exhaust system shall be sized to maintain a positive pressure throughout the building envelope to limit air and dust infiltration. No HVAC ductwork shall be installed under the floor slab or underground.

  • Clean Water 1. The Contractor agrees to comply with all applicable standards, orders or regulations issued pursuant to the Federal Water Pollution Control Act, as amended, 33 U.S.C. 1251 et seq . The Contractor agrees to report each violation to the Purchaser and understands and agrees that the Purchaser will, in turn, report each violation as required to assure notification to FTA and the appropriate EPA Regional Office.

  • Heating, Ventilation and Air Conditioning Landlord shall furnish to the Premises heating, ventilation and air-conditioning (“HVAC”) in accordance with the Design Standards set forth in Exhibit D during Ordinary Business Hours. Landlord shall have access to all air-cooling, fan, ventilating and machine rooms and electrical closets and all other mechanical installations of Landlord (collectively, “Mechanical Installations”), and Tenant shall not construct partitions or other obstructions which may interfere with Landlord’s access thereto or the moving of Landlord’s equipment to and from the Mechanical Installations. No Tenant Party shall at any time enter the Mechanical Installations or tamper with, adjust, or otherwise affect such Mechanical Installations. Landlord shall not be responsible if the HVAC System fails to provide cooled or heated air, as the case may be, to the Premises in accordance with the Design Standards by reason of (i) any equipment installed by, for or on behalf of Tenant, which has an electrical load in excess of the average electrical load and human occupancy factors for the HVAC System as designed, or (ii) any rearrangement of partitioning or other Alterations made or performed by, for or on behalf of Tenant. Tenant shall install, if missing, blinds or shades on all windows, which blinds and shades shall be subject to Landlord’s approval, and shall keep operable windows in the Premises closed, and lower the blinds when necessary because of the sun’s position, whenever the HVAC System is in operation or as and when required by any Requirement. Tenant shall cooperate with Landlord and shall abide by the rules and regulations which Landlord may reasonably prescribe for the proper functioning and protection of the HVAC System. Tenant acknowledges that the server room in the Premises currently has three heat pumps installed, being two 4-ton units, and one 2.5-ton unit (the “Existing Heat Pumps”). The 2.5-ton unit is currently connected and operational. Tenant shall determine whether it is satisfied with the condition of the Existing Heat Pumps and Landlord shall not have any responsibility or liability for the condition, operation, maintenance, repair or replacement of the Existing Heat Pumps. Tenant may operate the Existing Heat Pumps. Tenant shall be responsible for, and pay directly for, all necessary maintenance and repairs to the Existing Heat Pumps. Tenant shall reimburse Landlord monthly for the cost of all utility services used to operate the Existing Heat Pumps within 10 Business Days after receipt of Landlord’s invoice for such amount. Landlord may measure Tenant’s usage of such utility services by either a sub-meter or by other reasonable methods such as by temporary check meters or by survey. Tenant, at its cost, may replace the Existing Heat Pumps with one or more new heat pumps, provided, however, that the capacity of such replacement heat pump(s) shall not exceed the 10.5-ton capacity cooling capacity of the Existing Heat Pumps.

  • HVAC A. Heating, ventilating and air conditioning equipment will be provided with sufficient capacity to accommodate a maximum population density of one (1) person per one hundred fifty (150) square feet of useable floor area served, and a combined lighting and standard electrical load of 3.0 xxxxx per square foot of useable floor area. In the event Tenant introduces into the Premises personnel or equipment which overloads the system’s ability to adequately perform its proper functions, Landlord shall so notify Tenant in writing and supplementary system(s) may be required and installed by Landlord at Tenant’s expense, if within fifteen (15) days Tenant has not modified its use so as not to cause such overload. Operating criteria of the basic system shall not be less than the following:

  • Ventilation Where noxious or poisonous gases may accumulate, the City shall provide proper protection and ventilation. Proper lighting and ventilation shall be provided for all enclosed working spaces. All work in enclosed and confined spaces shall be performed in accordance with applicable Federal, State and local regulations. Spray painting shall be done only by qualified painters.

  • Water Provide hot water for lavatory purposes and cold water for drinking, lavatory and toilet purposes.

  • SPRINKLER SYSTEM If there now is or shall be installed in the Building a "sprinkler system", and such system or any of its appliances shall be damaged or injured or not in proper working order by reason of any act or omission of Tenant, Tenant's agents, servants, employees, licensees or visitors, Tenant shall forthwith restore the same to good working condition at its own expense; and if the New York Board of Fire Underwriters or the New York Fire Insurance Rating Organization or any bureau, department or official of the state or city government, shall require or recommend that any changes, modifications, alterations or additional sprinkler heads or other equipment be made or supplied by reason of Tenant's business, or the location of the partitions, trade fixtures, or other contents of the Premises, Tenant shall, at Tenant's expense, promptly make and supply such changes, modifications, alterations, additional sprinkler heads or other equipment.

  • Indoor Air Quality The Employer shall ensure a healthful air quality and attempt to ensure comfortable air temperature in buildings it owns and in space that it leases.

Time is Money Join Law Insider Premium to draft better contracts faster.