Contractor's Affidavit. The undersigned Contractor, , represents that on , 20 , it was awarded a contract by the City of Ann Arbor, Michigan to under the terms and conditions of a Contract titled . The Contractor represents that all work has now been accomplished and the Contract is complete. The Contractor warrants and certifies that all of its indebtedness arising by reason of the Contract has been fully paid or satisfactorily secured; and that all claims from subcontractors and others for labor and material used in accomplishing the project, as well as all other claims arising from the performance of the Contract, have been fully paid or satisfactorily settled. The Contractor agrees that, if any claim should hereafter arise, it shall assume responsibility for it immediately upon request to do so by the City of ▇▇▇ Arbor. The Contractor, for valuable consideration received, does further waive, release and relinquish any and all claims or right of lien which the Contractor now has or may acquire upon the subject premises for labor and material used in the project owned by the City of ▇▇▇ Arbor. This affidavit is freely and voluntarily given with full knowledge of the facts. Contractor Date By (Signature) Its (Title of Office) Subscribed and sworn to before me, on this day of , 20 , County, Michigan Notary Public STANDARD SPECIFICATIONS All work under this contract shall be performed in accordance with the Public Services Department Standard Specifications in effect at the date of availability of the contract documents stipulated in the Bid. All work under this Contract which is not included in these Standard Specifications, or which is performed using modifications to these Standard Specifications, shall be performed in accordance with the Detailed Specifications included in these contract documents. Standard Specifications are available online: • All power generation and transmission equipment must be UL listed and installed for its designed use. • Construction must comply with most recent currently adopted State Building Code, which encompasses: o International Building Code o National Electric Code (NEC) o All other relevant state and national codes • Contractor must provide transfer all manufacturer warranties for key equipment. • System Contractor is responsible for conducting all required building, utility, and rebate inspections, and must complete all construction and documentation in a manner necessary to pass such inspections, and in accordance with industry standard best practices. • System Contractor must possess current state electric and contractor’s license from State’s Contractors Licensing Board to perform work being proposed. • System modules shall be UL1703 listed, and CEC-listed. • Module manufacturer must provide a 10-year warranty on minimum of 90% nameplate energy production and 25-year warranty on minimum of 80% nameplate energy production. • All warranties must be documented in advance and be fully transferable to City. • Solar module providers must have a strong track record of performance with a long-term ability to provide service and warranties. • All roofing penetrations must be performed in such a way (including sealing) to prevent leakage and maintain the existing rooftop warranty. • All solar panels must be at least 6 inches above the roofing materials. • Any newly exposed steel must be protected with marine-grade sealants for corrosion resistance. • Roof-mounted array layouts shall be designed to provide minimum of 3 feet of walking access around the perimeter of the roof and convenient access to existing roof-mounted HVAC equipment, where applicable. • All components must be secured to reduce the potential for damage, vandalism, or theft. • All City policies regarding installation of solar must be followed.
Appears in 1 contract
Sources: Contract
Contractor's Affidavit. The undersigned Contractor, , represents that on , 20 , it was awarded a contract by the City of Ann Arbor, Michigan to under the terms and conditions of a Contract titled . The Contractor represents that all work has now been accomplished and the Contract is complete. The Contractor warrants and certifies that all of its indebtedness arising by reason of the Contract has been fully paid or satisfactorily secured; and that all claims from subcontractors and others for labor and material used in accomplishing the project, as well as all other claims arising from the performance of the Contract, have been fully paid or satisfactorily settled. The Contractor agrees that, if any claim should hereafter arise, it shall assume responsibility for it immediately upon request to do so by the City of ▇▇▇ Arbor. The Contractor, for valuable consideration received, does further waive, release and relinquish any and all claims or right of lien which the Contractor now has or may acquire upon the subject premises for labor and material used in the project owned by the City of ▇▇▇ Arbor. This affidavit is freely and voluntarily given with full knowledge of the facts. Contractor Date By (Signature) Its (Title of Office) Subscribed and sworn to before me, on this day of , 20 , County, Michigan Notary Public STANDARD SPECIFICATIONS All work under this contract shall be performed in accordance with the Public Services Department Standard Specifications in effect at the date of availability of the contract documents stipulated in the Bid. All work under this Contract which is not included in these Standard Specifications, or which is performed using modifications to these Standard Specifications, shall be performed in accordance with the Detailed Specifications included in these contract documents. Standard Specifications are available online: • All power generation and transmission equipment must be UL listed and installed for its designed use. • Construction must comply with most recent currently adopted State Building Code, which encompasses: o International Building Code o National Electric Code (NEC) o All other relevant state and national codes • Contractor must provide transfer all manufacturer warranties for key equipment. • System Contractor is responsible for conducting all required building, utility, and rebate inspections, and must complete all construction and documentation in a manner necessary to pass such inspections, and in accordance with industry standard best practices. • System Contractor must possess current state electric and contractor’s license from State’s Contractors Licensing Board to perform work being proposed. • System modules shall be UL1703 listed, and CEC-listed. • Module manufacturer must provide a 10-year warranty on minimum of 90% nameplate energy production and 25-year warranty on minimum of 80% nameplate energy production. • All warranties must be documented in advance and be fully transferable to City. • Solar module providers must have a strong track record of performance with a long-term ability to provide service and warranties. • All roofing penetrations must be performed in such a way (including sealing) to prevent leakage and maintain the existing rooftop warranty. • All solar panels must be at least 6 inches above the roofing materials. • Any newly exposed steel must be protected with marine-grade sealants for corrosion resistance. • Roof-mounted array layouts shall be designed to provide minimum of 3 feet of walking access around the perimeter of the roof and convenient access to existing roof-mounted HVAC equipment, where applicable. • All components must be secured to reduce the potential for damage, vandalism, or theft. • All City policies regarding installation of solar must be followed.:
Appears in 1 contract
Sources: Construction Contract
Contractor's Affidavit. The undersigned Contractor, Commercial Contracting Corporation, represents that on , 20 , it was awarded a contract by the City of Ann Arbor, Michigan to replace the existing Ultraviolet Disinfection System and construct an new building to house that system under the terms and conditions of a Contract titled Ultraviolet (UV) Disinfection System Replacement, for RFP 23-50. The Contractor represents that all work has now been accomplished and the Contract is complete. The Contractor warrants and certifies that all of its indebtedness arising by reason of the Contract has been fully paid or satisfactorily secured; and that all claims from subcontractors and others for labor and material used in accomplishing the project, as well as all other claims arising from the performance of the Contract, have been fully paid or satisfactorily settled. The Contractor agrees that, if any claim should hereafter arise, it shall assume responsibility for it immediately upon request to do so by the City of ▇▇▇ Arbor. The Contractor, for valuable consideration received, does further waive, release and relinquish any and all claims or right of lien which the Contractor now has or may acquire upon the subject premises for labor and material used in the project owned by the City of ▇▇▇ Arbor. This affidavit is freely and voluntarily given with full knowledge of the facts. Contractor Date By (Signature) Its (Title of Office) Subscribed and sworn to before me, on this day of , 20 , County, Michigan Notary Public STANDARD SPECIFICATIONS All work under this contract shall be performed in accordance with the Public Services Department Standard Specifications in effect at the date of availability of the contract documents stipulated in the Bid. All work under this Contract which is not included in these Standard Specifications, or which is performed using modifications to these Standard Specifications, shall be performed in accordance with the Detailed Specifications included in these contract documents. Standard Specifications are available online: • All power generation and transmission equipment must be UL listed and installed for its designed use. • Construction must comply with most recent currently adopted State Building Code, which encompasses: o International Building Code o National Electric Code (NEC) o All other relevant state and national codes • Contractor must provide transfer all manufacturer warranties for key equipment. • System Contractor is responsible for conducting all required building, utility, and rebate inspections, and must complete all construction and documentation in a manner necessary to pass such inspections, and in accordance with industry standard best practices. • System Contractor must possess current state electric and contractor’s license from State’s Contractors Licensing Board to perform work being proposed. • System modules shall be UL1703 listed, and CEC▇▇▇▇://▇▇▇.▇▇▇▇▇.▇▇▇/departments/engineering/Pages/Engineering-listed. • Module manufacturer must provide a 10and-year warranty on minimum of 90% nameplate energy production and 25-year warranty on minimum of 80% nameplate energy production. • All warranties must be documented in advance and be fully transferable to City. • Solar module providers must have a strong track record of performance with a long-term ability to provide service and warranties. • All roofing penetrations must be performed in such a way (including sealing) to prevent leakage and maintain the existing rooftop warranty. • All solar panels must be at least 6 inches above the roofing materials. • Any newly exposed steel must be protected with marine-grade sealants for corrosion resistance. • Roof-mounted array layouts shall be designed to provide minimum of 3 feet of walking access around the perimeter of the roof and convenient access to existing roof-mounted HVAC equipment, where applicable. • All components must be secured to reduce the potential for damage, vandalism, or theft. • All City policies regarding installation of solar must be followed.Contractor- Resources.aspx
Appears in 1 contract
Sources: Contract
Contractor's Affidavit. The undersigned Contractor, , represents that on , 20 , it was awarded a contract by the City of Ann Arbor, Michigan to under the terms and conditions of a Contract titled . The Contractor represents that all work has now been accomplished and the Contract is complete. The Contractor warrants and certifies that all of its indebtedness arising by reason of the Contract has been fully paid or satisfactorily secured; and that all claims from subcontractors and others for labor and material used in accomplishing the project, as well as all other claims arising from the performance of the Contract, have been fully paid or satisfactorily settled. The Contractor agrees that, if any claim should hereafter arise, it shall assume responsibility for it immediately upon request to do so by the City of ▇▇▇ Arbor. The Contractor, for valuable consideration received, does further waive, release and relinquish any and all claims or right of lien which the Contractor now has or may acquire upon the subject premises for labor and material used in the project owned by the City of ▇▇▇ Arbor. This affidavit is freely and voluntarily given with full knowledge of the facts. Contractor Date By (Signature) Its (Title of Office) Subscribed and sworn to before me, on this day of , 20 , County, Michigan Notary Public STANDARD SPECIFICATIONS All work under this contract shall be performed in accordance with the Public Services Department Standard Specifications in effect at the date of availability of the contract documents stipulated in the Bid. All work under this Contract which is not included in these Standard Specifications, or which is performed using modifications to these Standard Specifications, shall be performed in accordance with the Detailed Specifications included in these contract documents. Standard Specifications are available online: ▇▇▇▇://▇▇▇.▇▇▇▇▇.▇▇▇/departments/engineering/Pages/Engineering-and-Contractor- Resources.aspx • All power generation and transmission equipment must be UL listed and installed for its designed use. • Construction must comply with most recent currently adopted State Building Code, which encompasses: o International Building Code o National Electric Code (NEC) o All other relevant state and national codes • Contractor must provide transfer all manufacturer warranties a minimum 10-year warranty for key equipmentthe entire PV System and a 20- year performance guaranty. • System Contractor is responsible for conducting all required building, utility, and rebate inspections, and must complete all construction and documentation in a manner necessary to pass such inspections, and in accordance with industry standard best practices. • System Contractor must possess current state electric and contractor’s license from State’s Contractors Licensing Board to perform work being proposed. • System modules shall be UL1703 listed, and CEC-listed. • Module manufacturer must provide a 10-year warranty on minimum of 90% nameplate energy production and 25-year warranty on minimum of 80% nameplate energy production. • All warranties must be documented in advance and be fully transferable to City. • Solar module providers must have a strong track record of performance with a long-term ability to provide service and warranties. • All roofing penetrations must be performed in such a way (including sealing) to prevent leakage and maintain the existing rooftop warranty. • All solar panels must be at least 6 inches above the roofing materials. • Any newly exposed steel must be protected with marine-grade sealants for corrosion resistance. • Roof-mounted array layouts shall be designed to provide minimum of 3 feet of walking access around the perimeter of the roof and convenient access to existing roof-mounted HVAC equipment, where applicable. • All components must be secured to reduce the potential for damage, vandalism, or theft. • All City policies regarding installation of solar must be followed.
Appears in 1 contract
Sources: Contract
Contractor's Affidavit. The undersigned Contractor, , represents that on , 20 , it was awarded a contract by the City of Ann Arbor, Michigan to under the terms and conditions of a Contract titled . The Contractor represents that all work has now been accomplished and the Contract is complete. The Contractor warrants and certifies that all of its indebtedness arising by reason of the Contract has been fully paid or satisfactorily secured; and that all claims from subcontractors and others for labor and material used in accomplishing the project, as well as all other claims arising from the performance of the Contract, have been fully paid or satisfactorily settled. The Contractor agrees that, if any claim should hereafter arise, it shall assume responsibility for it immediately upon request to do so by the City of ▇▇▇ Arbor. The Contractor, for valuable consideration received, does further waive, release and relinquish any and all claims or right of lien which the Contractor now has or may acquire upon the subject premises for labor and material used in the project owned by the City of ▇▇▇ Arbor. This affidavit is freely and voluntarily given with full knowledge of the facts. Contractor Date By (Signature) Its (Title of Office) Subscribed and sworn to before me, on this day of , 20 , County, Michigan Notary Public STANDARD SPECIFICATIONS All work under this contract shall be performed in accordance with the Public Services Department Standard Specifications in effect at the date of availability of the contract documents stipulated in the Bid. All work under this Contract which is not included in these Standard Specifications, or which is performed using modifications to these Standard Specifications, shall be performed in accordance with the Detailed Specifications included in these contract documents. Standard Specifications are available online: • All power generation and transmission equipment must ▇▇▇▇://▇▇▇.▇▇▇▇▇.▇▇▇/departments/engineering/Pages/Engineering-and-Contractor- Resources.aspx The entire work under this Contract shall be UL listed and installed for its designed use. • Construction must comply with most recent currently adopted State Building Code, which encompasses: o International Building Code o National Electric Code (NEC) o All other relevant state and national codes • Contractor must provide transfer all manufacturer warranties for key equipment. • System Contractor is responsible for conducting all required building, utilitycompleted in accordance with, and rebate inspectionssubject to, the scheduling requirements as outlined below, and must complete all construction and documentation in a manner necessary to pass such inspections, and in accordance with industry standard best practices. • System Contractor must possess current state electric and contractor’s license from State’s Contractors Licensing Board to perform work being proposed. • System modules shall be UL1703 listed, and CEC-listed. • Module manufacturer must provide a 10-year warranty on minimum of 90% nameplate energy production and 25-year warranty on minimum of 80% nameplate energy production. • All warranties must be documented in advance and be fully transferable to City. • Solar module providers must have a strong track record of performance with a long-term ability to provide service and warranties. • All roofing penetrations must be performed in such a way (including sealing) to prevent leakage and maintain the existing rooftop warranty. • All solar panels must be at least 6 inches above the roofing materials. • Any newly exposed steel must be protected with marine-grade sealants for corrosion resistance. • Roof-mounted array layouts shall be designed to provide minimum of 3 feet of walking access around the perimeter other requirements of the roof and convenient access to existing roof-mounted HVAC equipment, where applicable. • All components must be secured to reduce the potential for damage, vandalism, or theft. • All City policies regarding installation of solar must be followedContract Documents.
Appears in 1 contract
Sources: Contract
Contractor's Affidavit. The undersigned Contractor, , represents that on , 20 , it was awarded a contract by the City of Ann Arbor, Michigan to under the terms and conditions of a Contract titled . The Contractor represents that all work has now been accomplished and the Contract is complete. The Contractor warrants and certifies that all of its indebtedness arising by reason of the Contract has been fully paid or satisfactorily secured; and that all claims from subcontractors and others for labor and material used in accomplishing the project, as well as all other claims arising from the performance of the Contract, have been fully paid or satisfactorily settled. The Contractor agrees that, if any claim should hereafter arise, it shall assume responsibility for it immediately upon request to do so by the City of ▇▇▇ Arbor. The Contractor, for valuable consideration received, does further waive, release and relinquish any and all claims or right of lien which the Contractor now has or may acquire upon the subject premises for labor and material used in the project owned by the City of ▇▇▇ Arbor. This affidavit is freely and voluntarily given with full knowledge of the facts. Contractor Date By (Signature) Its (Title of Office) Subscribed and sworn to before me, on this day of , 20 , County, Michigan Notary Public STANDARD SPECIFICATIONS All work under this contract shall be performed in accordance with the Public Services Department Standard Specifications in effect at the date of availability of the contract documents stipulated in the Bid. All work under this Contract which is not included in these Standard Specifications, or which is performed using modifications to these Standard Specifications, shall be performed in accordance with the Detailed Specifications included in these contract documents. Standard Specifications are available online: • All power generation ▇▇▇▇://▇▇▇.▇▇▇▇▇.▇▇▇/departments/engineering/Pages/Engineering-and-Contractor- Resources.aspx Fire Station #6, constructed in 1981, is a full time active fire station for the City of ▇▇▇ Arbor. Fire Station #6 will remain in operation during the renovation so certain operational accommodations are necessary. The work will include the removal and transmission equipment must disposal of the existing walls, plumbing fixtures, electrical systems and related appurtenances; mechanical, electrical and plumbing systems modifications; installation of new restroom and shower fixtures, lockers, walls, lighting and other finishes. The contractor will also be UL listed and installed for its designed use. • Construction must comply with most recent currently adopted State Building Code, which encompasses: o International Building Code o National Electric Code (NEC) o All other relevant state and national codes • Contractor must provide transfer all manufacturer warranties for key equipment. • System Contractor is responsible for conducting all required buildingany equipment startup and adjustment to ensure proper operation, utilitytraining of City staff on maintenance and operations, and rebate inspections, and must complete all construction and documentation in a manner necessary to pass such inspections, and in accordance with industry standard best practices. • System Contractor must possess current state electric and contractor’s license from State’s Contractors Licensing Board to perform work being proposed. • System modules shall be UL1703 listed, and CEC-listed. • Module manufacturer must provide a 10-year warranty on minimum submittal of 90% nameplate energy production and 25-year warranty on minimum of 80% nameplate energy production. • All warranties must be documented in advance and be fully transferable to City. • Solar module providers must have a strong track record of performance with a long-term ability to provide service manuals and warranties. • All roofing penetrations must be performed There are three Bid Alternates included in such a way (including sealing) to prevent leakage the drawings and maintain specifications. Technical details are provided on the existing rooftop warranty. • All solar panels must be at least 6 inches above drawings and in the roofing materials. • Any newly exposed steel must be protected with marine-grade sealants for corrosion resistance. • Roof-mounted array layouts shall be designed to provide minimum of 3 feet of walking access around the perimeter of the roof and convenient access to existing roof-mounted HVAC equipment, where applicable. • All components must be secured to reduce the potential for damage, vandalism, or theft. • All City policies regarding installation of solar must be followedspecifications below.
Appears in 1 contract
Sources: Construction Contract