CONSTRUCTION PHASE ENGINEERING SERVICES Sample Clauses

CONSTRUCTION PHASE ENGINEERING SERVICES. Construction Phase Services are not included within the current scope of services.
AutoNDA by SimpleDocs
CONSTRUCTION PHASE ENGINEERING SERVICES. Construction Phase Services for the Camelback Drive Waterline: Consultant will provide the following construction phase services:
CONSTRUCTION PHASE ENGINEERING SERVICES. A. Upon successful completion of the Improvement Plans, the ENGINEER shall:
CONSTRUCTION PHASE ENGINEERING SERVICES. Construction Phase Services are not included within the current scope of services. Scope and fees for these services may be negotiated at the time of Project Bidding.
CONSTRUCTION PHASE ENGINEERING SERVICES. Construction Phase Services for the Louisiana Street Waterline: Consultant will provide the following construction phase services:
CONSTRUCTION PHASE ENGINEERING SERVICES. Construction Phase Services for 00xx Xxxxxx Waterline: Consultant will provide the following construction phase services:
CONSTRUCTION PHASE ENGINEERING SERVICES. 4. Construction Phase On-site Construction Management Services.
AutoNDA by SimpleDocs

Related to CONSTRUCTION PHASE ENGINEERING SERVICES

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • CONSTRUCTION AND RELATED ENGINEERING SERVICES A. General construction work for buildings (CPC 512) 1) Unbound* 2) None 3) None 1) Unbound* 2) None 3) None

  • Building Commissioning Services The Owner may provide as a part of its testing services the Building Commissioning services involving the project’s HVAC and exhaust systems, temperature control systems, fire detection and alarm systems, emergency power and lighting system, fire suppression system, security locks and security locking control systems, food service equipment (if applicable), and laundry equipment (if applicable). In the event the Using Agency’s Program specifies additional commissioning services, the Owner shall procure such services as well. The Owner, through its Executive Administrator, may engage an independent Commissioning Authority. It is the intent of this Article that the Commissioning Authority enforce the requirements mentioned herein and certify that the systems and equipment listed all function properly prior to the initiation of each final inspection.

  • Engineering Services Definition: Engineering Services includes any service or creative work, the adequate performance of which requires education, training and experience in the application of special knowledge in consulting, investigating, evaluating, planning and designing, engineering principles. Engineering Services covered by the Xxxxxx Architect-Engineers Act (40 U.S.C. 1102) are not covered in the primary scope of OASIS SB. Examples: Service areas that are included under the Engineering Services discipline include, but are not limited to the following:

  • Construction Phase Fee Contractor’s Construction Phase Fee is the maximum amount payable to Contractor for any cost or profit expectation incurred in the performance of the Work that is not specifically identified as being eligible for reimbursement by Owner elsewhere in this Agreement. References in the UGSC to Contractor’s “overhead” and “profit” mean Contractor’s Construction Phase Fee. The Construction Phase Fee includes, but is not limited to, the following items:

  • Construction Phase Part 1 –

  • Preconstruction Phase Services Preconstruction Phase Services shall mean all services described in Article 3.1, and any similar services described in the Request for Proposals, including such similar services as are described in the Construction Manager at Risk’s Response to the Request for Proposals to the extent they are accepted by Owner, but excluding any Early Work. Early Work shall be considered part of Construction Phase Services.

  • Construction Services 4,500 thousand SDR for Japan Post in Group A 15,000 thousand SDR for all other entities in Group A 4,500 thousand SDR for entities in Group B Architectural, engineering and other technical services covered by this Agreement: 450 thousand SDR Other services: 130 thousand SDR List of Entities which procure the services, specified in Annex 4:

  • Design Development Phase Services 3.3.1 Based on the Owner’s approval of the Schematic Design Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Design Development Documents for the Owner’s approval. The Design Development Documents shall illustrate and describe the development of the approved Schematic Design Documents and shall consist of drawings and other documents including plans, sections, elevations, typical construction details, and diagrammatic layouts of building systems to fix and describe the size and character of the Project as to architectural, structural, mechanical and electrical systems, and other appropriate elements. The Design Development Documents shall also include outline specifications that identify major materials and systems and establish, in general, their quality levels.

  • Project Engineer If the Project has been designed by the Project Engineer, the Project Engineer is to act as the Owner's representative, assumes all duties and responsibilities, and has the rights and authority assigned to Project Engineer in the Contract Documents in connection with completion of the Work all in accordance with the Contract Documents.

Time is Money Join Law Insider Premium to draft better contracts faster.