CONSTRUCTION LINKED PAYMENT PLAN Progress Payment Sample Clauses
CONSTRUCTION LINKED PAYMENT PLAN Progress Payment. At Plinth level 15% Basement casting 10% Before Ground Floor Casting 10% Before 1st Floor Casting 10% Before 2nd Floor Casting 10% Before 3rd Floor Casting 10% Before 4th Floor Casting 10% Before 5th Floor Casting 10% At the time of possession 5%+ All other dues charges The Total price of the Unit is Rs /- (Rupees only).
1. Flooring: Marble/ Vitrified Tiles
2. Kitchen: Working platform of granite top with stainless steel sink glazed tiles dado up to 2ft height above working top.
3. Doors: 30mm water proof flush door and solid wood chaukhat.
4. Windows: Fully Glazed / Aluminum window
5. Plumbing: All internal GPVC pipes shall be concealed.
6. Toilets: White glazed tiles up to 7ft height with wash basin, shower, WC (I.W.C) in common toilets and white E.W.C in master bedroom, concealed G.I./ C.P.V.C pipes with hot and cold-water arrangement.
