Construction Documentation and Closeout. General • Contractor will be responsible for coordinating all construction inspections and project documentation. Contractor will participate in all Company Site walk-throughs for Site Acceptance • Contractor will be responsible for all construction closeout documentation ¡ Tests and inspections – construction inspections and project documentation may include, but is not limited to the following: • Engineered ground ring • Photographs showing all open excavations prior to backfilling showing a tape measure visible in the excavations indicating depth • Photographs showing all conductors and connectors • Photographs to verify bend radius of ground wires and ground rod spacing • Photographs of all test ▇▇▇▇▇ showing ground ring and ground rod test connections. • Concrete forming-photographs showing all reinforcing steel, utility and conduit stub outs • Trenching-photographs of all trenches after conduit of transport material has been placed but prior to backfill. Photographs will clearly show a tape measure visible in the excavations indicating depth • Tower assembly • Inspection and photographs of section stacking • Inspection and photographs of platform component attachment points • Photograph of tower top grounding • Photos of tower top coax line color coding and coding at the ground levelSite layout-photographs of the overall compound, including equipment platform from all four compass points • Finished utilities EXHIBIT C – SITE DEVELOPMENT SCOPE OF WORK TERRESTAR NETWORKS PROPRIETARY & CONFIDENTIAL • Photographs of the Main Service breaker panel • Close-up photograph of the inside of all panels • Close-up photograph of the power meter and disconnect ¡ The following special test reports will be required where applicable: • Concrete test cylinder break reports • Structural backfill compaction reports ¡ Using standard forms, the following tests and inspections must be performed and documented: • Site resistance to earth testing • Coax cable sweep tests per Company’s, antenna transmission line acceptance standardsPost construction height verification (PCHV) form will be completed • Antenna verification form for azimuths and downtilt ¡ Where applicable the Contractor will supply the following material certifications: • Concrete mix design • Mill certifications for all reinforcing and structural steelAsphalt paving mix design ¡ Contractor will be responsible for coordinating all inspections required by any local, state or federal agency. All inspecti...